The flow intensity in sewer does not depend on
Anonymous Quiz
24%
It's grade
33%
It's length
31%
It's hydraulic mean depth
12%
It's roughness
👍3
A sewer that receives the discharge of a number of house sewer is called
Anonymous Quiz
16%
House sewer
42%
Lateral sewer
30%
Intercepting sewer
13%
Sub main sewer
👍1💯1
The sewer which transports the sewage to the point of treatment is called
Anonymous Quiz
6%
House sewer
39%
Main sewer
53%
Out fall sewer
3%
None of the above
👍3
The waste water from bathrooms , kitchen , washing places and wash basin etc . Is called
Anonymous Quiz
4%
Garbage
38%
Sanitary sewage
6%
Rubbish
53%
Sullage
🤩1
Sewer that receive sewage from the collecting system and conducts it to a point of final discharge or to disposal plant is called
Anonymous Quiz
9%
Relief sewer
17%
Lateral sewer
24%
Intercepting sewer
50%
Outfall sewer
🎉2
Which of these shaped traps are not used in water closet
Anonymous Quiz
8%
P trap
61%
C trap
15%
S trap
16%
Q trap
💯3
Which of the following is false about vitrified sewer pipes
Anonymous Quiz
29%
Highly resistant to sulphide Corrosion
22%
Highly impervious
26%
High compressive strength
22%
Light weight
👍1
The phenomenon by virtue of which a soil is clogged with sewage matter is called as
Anonymous Quiz
7%
Sewage farming
56%
Sewage sickness
34%
Sewage bulking
2%
None of the above
👍1
Sewerage system is usually designed for
Anonymous Quiz
9%
5 years
13%
7 years
73%
25 years
6%
100 years
👍3🎉1
Sewers are generally laid starting from their
Anonymous Quiz
10%
Mid point
38%
Outfall point
31%
Off take point
21%
Any point along alignment
👍6💯2
कठीण काळात एक गोष्ट कायम लक्षात ठेवा,
संघर्षाची लढाई ही एकट्यालाच लढावी लागते..!!
❤51👍23🔥14🎉1
🔥 🔥 AK अकॅडमी कायमच तुमच्या सोबत
Please open Telegram to view this post
VIEW IN TELEGRAM
👍8
सरळसेवा परीक्षेच्या घवघवीत यशानंतर आता वेळ आहे ATP 2024 वर फोकस करण्याची..!!
http://on-app.in/app/oc/459095/ake
➡️ Contact: 9067051404
ATP 2024 मध्ये सिलेक्शन पर्यंत घेऊन जाईल असा कोर्स..!!
http://on-app.in/app/oc/459095/ake
Please open Telegram to view this post
VIEW IN TELEGRAM
❤3👍3
मित्रांनो पुढील राहिलेल्या परीक्षेत एक तरी पोस्ट मिळवायची असेल तर शिल्लक असलेल्या २ महिन्यात सर्व बारीक सारीक गोष्टींचा अभ्यास पूर्ण करून ठेवा..!!
वरील २ कोर्सेस तुमच्यासाठी सर्वात Best कोर्सेस असतील आणि ते देखील सर्वात कमी Fees मधे..!!
वरील २ कोर्सेस तुमच्यासाठी सर्वात Best कोर्सेस असतील आणि ते देखील सर्वात कमी Fees मधे..!!
👍15🔥3❤2
In a rigid pavement most critical location is
Anonymous Quiz
7%
Interior
26%
Edge
21%
Corner
47%
All the above
👍4🎉1
The maximum limit of water absorption for aggregate suitable for road construction is
Anonymous Quiz
23%
0.4 %
46%
0.6 %
21%
0.8 %
10%
1 %
👍3💯1
Flattening and smoothing the road surface by scrapping is called as
Anonymous Quiz
20%
Compaction
16%
Consolidation
46%
Grading
18%
Ditch digging
👍4❤1
Bottom most components of a flexible pavement is
Anonymous Quiz
58%
Sub grade
18%
Sub base
13%
Base
11%
Base course
🤩3👍1
Geosynthetics is used in pavement construction for
Anonymous Quiz
4%
Separation
15%
Reinforcement
14%
Drainage and filtration
67%
All the above
👍2💯2🔥1👏1
The bars that are provided at expansion joints and sometimes at contraction joints, in the cement concrete pavement are called
Anonymous Quiz
5%
Steel bars
30%
Tie bars
8%
Plastic bars
57%
Dowel bars
👍1