Which one of the following does have some limitations when applied to detailed engineering design work during early stages of a project
Anonymous Quiz
27%
CPM
31%
PERT
23%
Dummy activity
19%
Estimate
👍4
The Optimistic,most likely and Pessimistic estimates for an activity are 4 days ,11 days, 12 days respectively. The expected completion time of this activity is
Anonymous Quiz
10%
9 days
57%
10 days
19%
11 days
14%
12 days
👍5❤1
In PERT analysis, event means
Anonymous Quiz
27%
Start or finish of a task
7%
Time taken for a task
9%
End of an activity
8%
Work involved in the project
49%
All the above
👍2👏2💯2
A critical path has
Anonymous Quiz
54%
Zero slack
26%
Minimum slack
17%
Maximum slack
3%
Infinite slack
🔥1
The completion of an activity in PERT technique is called
Anonymous Quiz
16%
Head activity
48%
Head event
11%
Dual role event
24%
Tail event
👍3🔥3
Slack time in PERT analysis
Anonymous Quiz
11%
Can never be greater than zero
59%
Is always zero for critical activities
17%
Can never be less than zero
13%
Is minimum for critical events
👍5🔥3
“You don't get results by focusing on results, you get results by focusing on the actions that produce results”
👍43💯20🔥5
Please open Telegram to view this post
VIEW IN TELEGRAM
👍16
MUST REFER
Please open Telegram to view this post
VIEW IN TELEGRAM
Which one of the following bearings are forgiving in that they can tolerate loads and movement exceeding the design values
Anonymous Quiz
21%
Rocker
29%
Slide plate
29%
Steel roller
21%
Elastomeric
👍2
Courbons method of design of bridge is applicable when the ratio of span width is between _____ and ____
Anonymous Quiz
15%
1 and 4
51%
2 and 4
31%
3 and 4
3%
5 and 4
Determine the volume of a 5 m diameter bunker to store 50 tonnes of coal having density of 10 kN/m³
Anonymous Quiz
14%
5 m³
31%
20 m³
43%
50 m³
13%
500 m³
_______ can be defined as a rise of water level on the upstream side of a bridge
Anonymous Quiz
5%
Scour
69%
Afflux
23%
HFL
3%
Discharge
💯2❤1
The area through which the water flows under a bridge superstructure is known as _____ of the bridge
Anonymous Quiz
7%
Stream
14%
Scour
69%
Waterway
10%
Afflux
🔥2
The type of bearing used on a bridge depends on
Anonymous Quiz
5%
Extent of movement at the bridge ends
6%
Temperature variation
6%
Load carried
83%
All the above
👍2💯2
The minimum vertical clearance for opening of high level bridges for discharge of 0.3-3.0 m³ per second os
Anonymous Quiz
23%
150 mm
36%
250 mm
28%
350 mm
13%
450 mm
👍2
A bridge designed to allow normal floods to pass through it's vents but allowed to be over topped during floods is called
Anonymous Quiz
59%
Submersible bridge
13%
Under bridge
25%
Seasonal bridge
2%
None of the above
👍5
What should be the minimum width of foot path while designing a bridge for rural areas
Anonymous Quiz
52%
1.5 m
21%
2.0 m
25%
1.75 m
2%
3.9 m
👍4
The centre to centre distance between to adjacent supports is called as ____ of a bridge
Anonymous Quiz
11%
Span
37%
Clear span
8%
Nominal span
44%
Effective span
👍3
A culvert can be defined as a crossing with a total length not exceeding between the faces of the abutment
Anonymous Quiz
62%
6 m
16%
7 m
17%
8 m
5%
10 m
👍4