The ratio of velocity of flow at exit to theoretical velocity of jet corresponding to manometric head is known as
Anonymous Quiz
20%
Specific speed
40%
Flow ratio
24%
Speed ratio
16%
Hydraulic ratio
👍1🔥1
Which of the following bends will cause maximum head loss
Anonymous Quiz
8%
30° bend
21%
60° bend
43%
90° bend
29%
U bend
👍1
If the velocity of flow as well as the diameter of the Flowing pipe are respectively doubled , the head loss therfore be
Anonymous Quiz
19%
Halved
30%
Doubled
45%
Incresed 4 times
6%
No change
The hydraulic gradient line represent the variation of
Anonymous Quiz
13%
Datum head in direction of flow
32%
Velocity head in the direction of flow
39%
Piezometer head in the direction of flow
17%
Total energy in the direction of flow
👍1🔥1
The major loss of hydraulic energy in pipe flow occurs in long pipe due to
Anonymous Quiz
9%
Sudden enlargement
61%
Friction
17%
Sudden contraction
13%
Gradual enlargement or contraction
❤1👍1
The flow in a pipe is neither laminar nor turbulent when the Reynold's number is
Anonymous Quiz
13%
Less than 2000
68%
Between 2000 and 2800
10%
More than 2800
9%
None of the above
🎉5👍1
Friction factor for a pipe depends upon
Anonymous Quiz
7%
Size of the pipe
12%
Rate of flow
7%
Age of the pipe
74%
All these
🤩1💯1
विद्यार्थी मित्रांनो पुढील राहिलेल्या परीक्षेत एक तरी पोस्ट मिळवायची असेल तर शिल्लक असलेल्या पुढील काही दिवसात सर्व बारीक सारीक गोष्टींचा अभ्यास पूर्ण करून ठेवा..!!
वरील २ कोर्सेस (सरळसेवा व ATP) तुमच्यासाठी सर्वात Best कोर्सेस असतील आणि ते देखील सर्वात कमी Fees मधे..!!
☑️ 20% DISCOUNT
वरील २ कोर्सेस (सरळसेवा व ATP) तुमच्यासाठी सर्वात Best कोर्सेस असतील आणि ते देखील सर्वात कमी Fees मधे..!!
☑️ 20% DISCOUNT
Critical path connects the events that have
Anonymous Quiz
9%
Negative slack
24%
Positive slack
61%
Zero slack
6%
High slack
👍1💯1
Pick up the correct statement from the following
Anonymous Quiz
5%
CPM analysis is activity oriented
8%
PERT analysis is event oriented
10%
CPM does not make any allowance for the uncertainties in the duration of time
77%
All the above
👏2🎉2
An activity that shows dependency consumes no time no resources is called
Anonymous Quiz
8%
Critical
78%
Dummy
11%
Event
4%
Float
❤2🔥1
The waiting time required between activities is known as
Anonymous Quiz
26%
Slack
34%
Float
29%
Lag
11%
Free float
PERT technique of network analysis is mainly useful for
Anonymous Quiz
5%
Small projects
23%
Large and complex projects
66%
Research and development projects
6%
Deterministic activities
🎉1
Slack time is PERT analysis
Anonymous Quiz
7%
Can never be greater than zero
60%
Is always zero for critical activity
19%
Can never be less than zero
14%
Is minimum for critical event
👍5
The CPM network analysis is a ______ base method useful for ________
Anonymous Quiz
20%
Activity, research and development projects
16%
Event , construction projects
20%
Event, research and development projects
44%
Activity, construction projects
Positive float for any activity means that the activity is
Anonymous Quiz
29%
Supercritical
49%
Sub critical
20%
Critical
3%
None of the above
Updating may result
Anonymous Quiz
9%
Change of critical path
20%
Decrease in project completion time
12%
Increses in project competition time
60%
All the above
🤩1💯1
The process of incorporating change and rescheduling or re-planning is called
Anonymous Quiz
13%
Resource levelling
31%
Resource smoothing
42%
Updating
14%
Critical path scheduling
👍1
In resources levelling
Anonymous Quiz
9%
Total duration of project is reduced
24%
Total duration of project is increased
57%
Uniform demand of resources is achieved
10%
Cost of project is controlled
👏2