Friction factor for a pipe depends upon
Anonymous Quiz
7%
Size of the pipe
12%
Rate of flow
7%
Age of the pipe
74%
All these
🤩1💯1
विद्यार्थी मित्रांनो पुढील राहिलेल्या परीक्षेत एक तरी पोस्ट मिळवायची असेल तर शिल्लक असलेल्या पुढील काही दिवसात सर्व बारीक सारीक गोष्टींचा अभ्यास पूर्ण करून ठेवा..!!
वरील २ कोर्सेस (सरळसेवा व ATP) तुमच्यासाठी सर्वात Best कोर्सेस असतील आणि ते देखील सर्वात कमी Fees मधे..!!
☑️ 20% DISCOUNT
वरील २ कोर्सेस (सरळसेवा व ATP) तुमच्यासाठी सर्वात Best कोर्सेस असतील आणि ते देखील सर्वात कमी Fees मधे..!!
☑️ 20% DISCOUNT
Critical path connects the events that have
Anonymous Quiz
9%
Negative slack
24%
Positive slack
61%
Zero slack
6%
High slack
👍1💯1
Pick up the correct statement from the following
Anonymous Quiz
5%
CPM analysis is activity oriented
8%
PERT analysis is event oriented
10%
CPM does not make any allowance for the uncertainties in the duration of time
77%
All the above
👏2🎉2
An activity that shows dependency consumes no time no resources is called
Anonymous Quiz
8%
Critical
78%
Dummy
11%
Event
4%
Float
❤2🔥1
The waiting time required between activities is known as
Anonymous Quiz
26%
Slack
34%
Float
29%
Lag
11%
Free float
PERT technique of network analysis is mainly useful for
Anonymous Quiz
5%
Small projects
23%
Large and complex projects
66%
Research and development projects
6%
Deterministic activities
🎉1
Slack time is PERT analysis
Anonymous Quiz
7%
Can never be greater than zero
60%
Is always zero for critical activity
19%
Can never be less than zero
14%
Is minimum for critical event
👍5
The CPM network analysis is a ______ base method useful for ________
Anonymous Quiz
20%
Activity, research and development projects
16%
Event , construction projects
20%
Event, research and development projects
44%
Activity, construction projects
Positive float for any activity means that the activity is
Anonymous Quiz
29%
Supercritical
49%
Sub critical
20%
Critical
3%
None of the above
Updating may result
Anonymous Quiz
9%
Change of critical path
20%
Decrease in project completion time
12%
Increses in project competition time
60%
All the above
🤩1💯1
The process of incorporating change and rescheduling or re-planning is called
Anonymous Quiz
13%
Resource levelling
31%
Resource smoothing
42%
Updating
14%
Critical path scheduling
👍1
In resources levelling
Anonymous Quiz
9%
Total duration of project is reduced
24%
Total duration of project is increased
57%
Uniform demand of resources is achieved
10%
Cost of project is controlled
👏2
👍1
In structural design work , the earthquake forces shall be calculated in accordance with the following IS code
Anonymous Quiz
5%
IS 1904
72%
IS 1893
13%
IS 6909
10%
IS 12330
👏1
According to IS 1893 ( Part 1 ) : 2002 , the zone factor for seismic zone III is equal to
Anonymous Quiz
6%
0.10
36%
0.16
48%
0.24
10%
0.36
❤2👍1
The most efficient cross section in a roof truss is
Anonymous Quiz
43%
Angle section
13%
Circular section
24%
Rectangular section
20%
Tabular section
👍2
The principal rafter of a roof truss with purlins placed at intermediate parts on panel length can be analyzed by
Anonymous Quiz
22%
Method of joints
39%
Method of sections
20%
Graphical method
19%
Moment distribution method
👍1💯1