API- Ace Petroleum Engineering
2.54K subscribers
671 photos
5 videos
161 files
551 links
Initiative by IITians & Experts to guide aspirants for Petroleum Eng. CBT, GATE, SPE, PSUs..etc. & InterviewsπŸ‘”πŸŽ―

Website:- gateaceinpetroleumots.conductexam.com/
πŸ“© apigateinpetroleum@gmail.com
❀️FB-Apiace

Est.Dt: 3-07-2019
Download Telegram
A well flows naturally, yet the operator adds gas lift. The most likely reason is:
A) To increase reservoir pressure
B) To raise oil viscosity
C) To lighten the fluid column and increase drawdown and rate
D) To reduce GOR
❀1
Pr = 3000 psi, Pb = 2500 psi, J = 2 stb/d/psi, Pwf = 1500 psi. Total rate using the Vogel combined IPR is closest to:
A) 1000 stb/d
B) 1644 stb/d
C) 2644 stb/d
D) 3500 stb/d
πŸ“’ GATE Petroleum Test Series by API GATE is live! Concept-based mocks, detailed solutions, performance analysis. Mail to join. πŸ“© apigateinpetroleum@gmail.com
πŸ‘1
Which well is more sensitive to tubing size?
A) Dry gas well
B) High-GOR oil well, because tubing size affects both friction and hydrostatic gradient
C) Both equally
D) Neither
πŸ‘1
πŸ“’ GATE Petroleum Test Series by API GATE is live! Concept-based mocks, detailed solutions, performance analysis. Mail to join. πŸ“© apigateinpetroleum@gmail.com
πŸ‘1
Below bubble point, a well's PI falls though absolute permeability is unchanged. Why?
A) Rock compaction
B) Increased oil viscosity at surface
C) Gas saturation rises, reducing oil relative permeability
D) Tubing friction increases
πŸ‘1
πŸ“’ GATE Petroleum Test Series by API GATE is live! Concept-based mocks, detailed solutions, performance analysis. Mail to join. πŸ“© apigateinpetroleum@gmail.com
πŸ‘1