π£ WEEKLY VITREUS BUILD UPDATE
*SEE PIC BELOW* As you can see CyberLYNQ library is almost complete. They are working in the vApp integrations now to finish that up. The Whitelabel solution is coming along also. CyberLYNQ will be an add-on part of this program as well. We got a demo of the Whitelabel Administrative Dashboard today and all I can say is wow. The customization features and contract-building functionality for a new project is amazing and very convenient. The overall vNode work is about 50% complete as they now look to begin testing VanguardianOS and the various connections with vApp. The Vitreus ONE command center is moving right along also. Most of last week went towards COMPLiQ training and tuning. All of these %s include expected testing as well. We are almost to the point that development work is complete and we are testing almost everything in development.
Please see the detailed tasks below for those of you who enjoy the technical aspects.
Vitreus Corporate Platform
Last Weekβs Achievements:
β Updated prompts to address clarifications from the Compliance Officer.
β Developed an AI scenario for the stable operation of rule checking based on officer's rules.
β Obtained initial results in checking the incompatibility between Compliance Officer rules and SEC rules.
Next Weekβs Plans:
π‘ Integrate the officer's rule system into the application structure.
π‘ Validate and integrate into the API.
π‘ Refine the scope for CompliQ without blockchain.
Vitreus Power Plant and vApp
Last Weekβs Achievements:
β Finalized correct fee representation in ETH blocks
β Dynamic fee WIP
β Metamask issues WIP fixing
β VIP finalized
β Working on VIPP
β Reputation calculations
β Deployment process to vNode package registry
β Power Plant image
β Bug Fixes and improvements
β Updated dev build
β Storage for themes
β Microservice for handling all the backends for Whitelabel
β Whitelabel improvements
β Receiving balances improved
β Documented transaction sign process
β Whitelabel backends deployment
β Building custom ISO image with preseed
β Exploring DappNode services
Next Weekβs Plans:
π‘ Finalize dynamic fee
π‘ Resolve metamask issues
π‘ Working on VIPP
π‘ Upload the Whitelabel affiliate code
π‘ Logic for deploying the contracts
π‘ Listeners for events
π‘ Connection to FE
We. Are. Vitreus.
LETS GO!! π«‘π
@everyone
*SEE PIC BELOW* As you can see CyberLYNQ library is almost complete. They are working in the vApp integrations now to finish that up. The Whitelabel solution is coming along also. CyberLYNQ will be an add-on part of this program as well. We got a demo of the Whitelabel Administrative Dashboard today and all I can say is wow. The customization features and contract-building functionality for a new project is amazing and very convenient. The overall vNode work is about 50% complete as they now look to begin testing VanguardianOS and the various connections with vApp. The Vitreus ONE command center is moving right along also. Most of last week went towards COMPLiQ training and tuning. All of these %s include expected testing as well. We are almost to the point that development work is complete and we are testing almost everything in development.
Please see the detailed tasks below for those of you who enjoy the technical aspects.
Vitreus Corporate Platform
Last Weekβs Achievements:
β Updated prompts to address clarifications from the Compliance Officer.
β Developed an AI scenario for the stable operation of rule checking based on officer's rules.
β Obtained initial results in checking the incompatibility between Compliance Officer rules and SEC rules.
Next Weekβs Plans:
π‘ Integrate the officer's rule system into the application structure.
π‘ Validate and integrate into the API.
π‘ Refine the scope for CompliQ without blockchain.
Vitreus Power Plant and vApp
Last Weekβs Achievements:
β Finalized correct fee representation in ETH blocks
β Dynamic fee WIP
β Metamask issues WIP fixing
β VIP finalized
β Working on VIPP
β Reputation calculations
β Deployment process to vNode package registry
β Power Plant image
β Bug Fixes and improvements
β Updated dev build
β Storage for themes
β Microservice for handling all the backends for Whitelabel
β Whitelabel improvements
β Receiving balances improved
β Documented transaction sign process
β Whitelabel backends deployment
β Building custom ISO image with preseed
β Exploring DappNode services
Next Weekβs Plans:
π‘ Finalize dynamic fee
π‘ Resolve metamask issues
π‘ Working on VIPP
π‘ Upload the Whitelabel affiliate code
π‘ Logic for deploying the contracts
π‘ Listeners for events
π‘ Connection to FE
We. Are. Vitreus.
LETS GO!! π«‘π
@everyone
π£ Happy βBuild Updateβ Friday
Last week was a pivotal week as we finalized the staking reward development (VNRG, VIP, and VIP Preferred) within the ecosystem. Now we begin working on the integration of that data with the vApp for the staking tab.
We also focused efforts solely on Power Plant and vApp functions as we made important pivots on the enterprise use case MVP. Iβll be sharing that in a separate announcement.
CyberLYNQ is pretty much ready to go (our proprietary wallet connect library). Whitelabel pre-sale app is ready and we are now preparing Whitelabel VAM with same customizable functions. Iβll show a demo of this soon.
vNodes are in transit to the facility. VanguardianOS is developed and beginning testing and once that is complete then weβll send the OS disk image to the facility for installation prior to packaging and shipping. Now they begin working on the vApp vNode feature tab.
Please find the detailed accomplishments below.
Vitreus Power Plant and vApp
Last Weekβs Achievements:
β Polishing and improvements for VNRG generation
β VIP/VIPP finalized
β Extrinsic logic implementation
β Finalize connect node flow
β Node reset flow
β Stop Node flow
β Change wi-fi credentials
β Forgot password flow
β Implemented logic for message and transaction signing on the backend
β Implemented logic for contract
β Enhanced database architecture
β Added subscribers for contract events
β Connected to frontends
β Presale White-label improvements
β Integration between frontend and vApp
β Deploy and fix Whitelabel backends
β AWS and Vultr cost estimation
β Investigate and set up resetting Wi-Fi password for vNode using pwrbtn
β ISO build
Next Weekβs Plans:
π‘ Claiming improvements
π‘ Genesis config
π‘ Replacing Aragon registry with custom
π‘ Extrinsic logic implementation
π‘ Affiliate White-label
π‘ Code refactoring
π‘ Switching networks between EVM and Polkadot
π‘ ISO build
We. Are. Vitreus.
LETβS GO!! π«‘π
@everyone
Last week was a pivotal week as we finalized the staking reward development (VNRG, VIP, and VIP Preferred) within the ecosystem. Now we begin working on the integration of that data with the vApp for the staking tab.
We also focused efforts solely on Power Plant and vApp functions as we made important pivots on the enterprise use case MVP. Iβll be sharing that in a separate announcement.
CyberLYNQ is pretty much ready to go (our proprietary wallet connect library). Whitelabel pre-sale app is ready and we are now preparing Whitelabel VAM with same customizable functions. Iβll show a demo of this soon.
vNodes are in transit to the facility. VanguardianOS is developed and beginning testing and once that is complete then weβll send the OS disk image to the facility for installation prior to packaging and shipping. Now they begin working on the vApp vNode feature tab.
Please find the detailed accomplishments below.
Vitreus Power Plant and vApp
Last Weekβs Achievements:
β Polishing and improvements for VNRG generation
β VIP/VIPP finalized
β Extrinsic logic implementation
β Finalize connect node flow
β Node reset flow
β Stop Node flow
β Change wi-fi credentials
β Forgot password flow
β Implemented logic for message and transaction signing on the backend
β Implemented logic for contract
β Enhanced database architecture
β Added subscribers for contract events
β Connected to frontends
β Presale White-label improvements
β Integration between frontend and vApp
β Deploy and fix Whitelabel backends
β AWS and Vultr cost estimation
β Investigate and set up resetting Wi-Fi password for vNode using pwrbtn
β ISO build
Next Weekβs Plans:
π‘ Claiming improvements
π‘ Genesis config
π‘ Replacing Aragon registry with custom
π‘ Extrinsic logic implementation
π‘ Affiliate White-label
π‘ Code refactoring
π‘ Switching networks between EVM and Polkadot
π‘ ISO build
We. Are. Vitreus.
LETβS GO!! π«‘π
@everyone
π£ WE MADE IT β We get stage time in the βStart-Up Showcaseβ at Web Summit in Lisbon, Portugal in a couple weeks.
CONGRATULATIONS to @everyone as CDI, Inc. as been selected as an incredibly innovative start-up at the largest technology conference in the world. This speaking opportunity only compounds our ability to reach more of the 72,000 people who will be in attendance.
Weβre all very excited for this opportunity to get in front of a large number of people who are there to learn of all the different startup opportunities. From what we hear, a lot of the Venture Capital investors like to hang out at this stage to learn of new ideas that are coming down the pike. Great exposure opportunity.
We. Are. Vitreus.
LETS GOO!! π«‘π
CONGRATULATIONS to @everyone as CDI, Inc. as been selected as an incredibly innovative start-up at the largest technology conference in the world. This speaking opportunity only compounds our ability to reach more of the 72,000 people who will be in attendance.
Weβre all very excited for this opportunity to get in front of a large number of people who are there to learn of all the different startup opportunities. From what we hear, a lot of the Venture Capital investors like to hang out at this stage to learn of new ideas that are coming down the pike. Great exposure opportunity.
We. Are. Vitreus.
LETS GOO!! π«‘π
π£ NEW VTRS WEBSITE
https://vtrs.io
For those of you who didnβt catch the soft drop yesterday in main, our new digital token website is operational. Go check it out!!
We have carved the token messaging away from the B2B site(s) that are being designed to focus purely on the business product messaging.
The new Vitreus and Collaborative Digital sites should be functional within a few weeks. <@736124200145780776> continues to work hard on these items so make sure you let him know how well he has done for us!! ππ»
We. Are. Vitreus.
LETS GO!! π«‘π
@everyone
https://vtrs.io/
For those of you who didnβt catch the soft drop yesterday in main, our new digital token website is operational. Go check it out!!
We have carved the token messaging away from the B2B site(s) that are being designed to focus purely on the business product messaging.
The new Vitreus and Collaborative Digital sites should be functional within a few weeks. @Baran | VITREUS CMO continues to work hard on these items so make sure you let him know how well he has done for us!! ππ»
We. Are. Vitreus.
LETS GO!! π«‘π
@everyone
https://vtrs.io
For those of you who didnβt catch the soft drop yesterday in main, our new digital token website is operational. Go check it out!!
We have carved the token messaging away from the B2B site(s) that are being designed to focus purely on the business product messaging.
The new Vitreus and Collaborative Digital sites should be functional within a few weeks. <@736124200145780776> continues to work hard on these items so make sure you let him know how well he has done for us!! ππ»
We. Are. Vitreus.
LETS GO!! π«‘π
@everyone
https://vtrs.io/
For those of you who didnβt catch the soft drop yesterday in main, our new digital token website is operational. Go check it out!!
We have carved the token messaging away from the B2B site(s) that are being designed to focus purely on the business product messaging.
The new Vitreus and Collaborative Digital sites should be functional within a few weeks. @Baran | VITREUS CMO continues to work hard on these items so make sure you let him know how well he has done for us!! ππ»
We. Are. Vitreus.
LETS GO!! π«‘π
@everyone
π£ Happy βBuild Updateβ Day @everyone !!
Things are getting exciting!! The largest elements from this past week are that VanguardianOS (VOS) has been installed on the dev nodes and the dev nodes have been connected into the vApp workflows. The next 2 weeks are all about testing and debugging. The next version of vApp for beta testing is getting close. Dennis (Innowise PM) refused to give me a hard date today and promised to follow up later.
Then, beginning in 2 weeks, NetSpi will engage in penetration testing which could take 1-2 weeks⦠so as of now, Phase 3: Open Beta is still on schedule as planned. I will communicate if I learn of anything that will delay. The pen testing will drive that.
At this point, I anticipate vNodes will begin shipping second week of December and will begin arriving in different parts of the world a few days following that. December will be fun.
Our cyber security productβs, CyberVision, *Requirements* and *Scope* are currently in drafting internally by the Vitreus tech team. We committed to having those items in Innowiseβs hands by Monday which will have ALL the detail surrounding the multi-phased feature build-out. We will review with CDIβs Board Security Committee next week for feedback and then finalize the architectural details and begin construction week 3 of November.
The enterprise blockchain and COMPLiQ are ready so this phase 1 reporting and intelligence dashboard feature will go rather quickly. Training ML will take time lending to an increasing value of the platform over time. As such, we will have a scaling pricing model for adopting corporate customers.
Cont'd
Things are getting exciting!! The largest elements from this past week are that VanguardianOS (VOS) has been installed on the dev nodes and the dev nodes have been connected into the vApp workflows. The next 2 weeks are all about testing and debugging. The next version of vApp for beta testing is getting close. Dennis (Innowise PM) refused to give me a hard date today and promised to follow up later.
Then, beginning in 2 weeks, NetSpi will engage in penetration testing which could take 1-2 weeks⦠so as of now, Phase 3: Open Beta is still on schedule as planned. I will communicate if I learn of anything that will delay. The pen testing will drive that.
At this point, I anticipate vNodes will begin shipping second week of December and will begin arriving in different parts of the world a few days following that. December will be fun.
Our cyber security productβs, CyberVision, *Requirements* and *Scope* are currently in drafting internally by the Vitreus tech team. We committed to having those items in Innowiseβs hands by Monday which will have ALL the detail surrounding the multi-phased feature build-out. We will review with CDIβs Board Security Committee next week for feedback and then finalize the architectural details and begin construction week 3 of November.
The enterprise blockchain and COMPLiQ are ready so this phase 1 reporting and intelligence dashboard feature will go rather quickly. Training ML will take time lending to an increasing value of the platform over time. As such, we will have a scaling pricing model for adopting corporate customers.
Cont'd
Please find the technical accomplishments and plans below:
Vitreus Power Plant & vApp β>
Last Weekβs Achievements:
β Replaced package manager contracts with our own deployed contracts
β Modify backend ENS resolution and contracts ABI
β Deploy vitreus-power-plant validator to a vNode
β Connect deployed validator to DevNet
β Unit test coverage for dynamic fee
β EVM transactions improvements
β Extrinsic logic implementation
β Backend improvements for Whitelabel
β Switch network logic for CyberLYNQ
β UI improvements and bug fixes for Whitelabel
β Building ISO image (add scripts, check packages, explore tpm module, add disk encryption)
β Checking running nodes
β Supporting to install powerplant node on vNode
β Batch call fees fix (pending pr)
β Evm tx error due to low vtrs balance fix (pending pr)
β Metamask connection issues WIP
β Fixed build issues
β Connecting and get info from vnode
β Changing layout on vnode screen
β Adding hardware overview
β Adding layout for change password and connect to node
β Refactoring signup/signin flow
β Stake flow UI
Next Weekβs Plans:
π¨ Continue working with package manager
π¨ Extracting all required data from power-plant validator from mobile app
π¨ Whitelabel improvements
π¨ Switch network logics
π¨ Explore TPM module for storing keys
π¨ Add keys to module
π¨ Vnode script adjustment
We. Are. Vitreus.
LETS GO!! π«‘π
@everyone
Vitreus Power Plant & vApp β>
Last Weekβs Achievements:
β Replaced package manager contracts with our own deployed contracts
β Modify backend ENS resolution and contracts ABI
β Deploy vitreus-power-plant validator to a vNode
β Connect deployed validator to DevNet
β Unit test coverage for dynamic fee
β EVM transactions improvements
β Extrinsic logic implementation
β Backend improvements for Whitelabel
β Switch network logic for CyberLYNQ
β UI improvements and bug fixes for Whitelabel
β Building ISO image (add scripts, check packages, explore tpm module, add disk encryption)
β Checking running nodes
β Supporting to install powerplant node on vNode
β Batch call fees fix (pending pr)
β Evm tx error due to low vtrs balance fix (pending pr)
β Metamask connection issues WIP
β Fixed build issues
β Connecting and get info from vnode
β Changing layout on vnode screen
β Adding hardware overview
β Adding layout for change password and connect to node
β Refactoring signup/signin flow
β Stake flow UI
Next Weekβs Plans:
π¨ Continue working with package manager
π¨ Extracting all required data from power-plant validator from mobile app
π¨ Whitelabel improvements
π¨ Switch network logics
π¨ Explore TPM module for storing keys
π¨ Add keys to module
π¨ Vnode script adjustment
We. Are. Vitreus.
LETS GO!! π«‘π
@everyone
π£ SO CLOSE!!! The vApp MVP is ALMOST complete @everyone!!!
While we build Corporate regTech solutions, we also remain mindful of the needs of all you holding digital assets on Vitreus Chain.
The vApp is so nice!!! β¦ and BEAUTIFUL!! A One-stop-shop. And itβs not a small project.
Built for all holders of digital assets looking to:
β manage the safekeeping of their digital assets
β actively participate in blockchain validation
β manage their vNodes and staking
Vitreusβ Power Plant uses a native digital utility token (VTRS) as a staking tool to generate vEnergy for the entire blockchain to use as βgasβ.
Itβs rather ingenious. And I couldnβt be more excited to begin unveiling our solutions to the world in Open Beta.
We. Are. Vitreus.
LETS GO!! π«‘π
While we build Corporate regTech solutions, we also remain mindful of the needs of all you holding digital assets on Vitreus Chain.
The vApp is so nice!!! β¦ and BEAUTIFUL!! A One-stop-shop. And itβs not a small project.
Built for all holders of digital assets looking to:
β manage the safekeeping of their digital assets
β actively participate in blockchain validation
β manage their vNodes and staking
Vitreusβ Power Plant uses a native digital utility token (VTRS) as a staking tool to generate vEnergy for the entire blockchain to use as βgasβ.
Itβs rather ingenious. And I couldnβt be more excited to begin unveiling our solutions to the world in Open Beta.
We. Are. Vitreus.
LETS GO!! π«‘π
Good morning/afternoon @everyone,
I wanted to communicate an update in hopes to create some clarity around our immediate-, short-, mid-, and long-term road map for Vitreusβ products.
Timing of Business Development Initiatives β>
0οΈβ£ IMMEDIATE-Term: (2-4 months) we are in Beta testing for the entire blockchain infrastructure including Enterprise Chain, Power Plant, vNodes, VTRS/VNRG Digital Assets, and vApp
We also have the following business goals for the corporate chain of time to revenue ready.
1οΈβ£ Short-Term (4-8 months) β CyberVision is entering development. Please see flow and roadmap below.
2οΈβ£ Mid-Term 8-18mos = Full Cyber Suite (CyberID, CyberSYNQ, CyberKEYS, CyberSECURE)
3οΈβ£ Long-Term 18mos+ = F.A.M.E. chains
Commitment to Transparency β>
I will continue to offer utmost transparency and clarity to all of you as we move along this start up journey. But at any point along the way, I hope you will bring me questions that we can work through together as a community. Iβm happy to speak openly in front of everyoneβ¦ and sometimes spill some beans. ππ«‘
I appreciate all of your trust and confidence in this team as we continue to press forward.
We. Are. Vitreus.
LETS GO!! π«‘π
I wanted to communicate an update in hopes to create some clarity around our immediate-, short-, mid-, and long-term road map for Vitreusβ products.
Timing of Business Development Initiatives β>
0οΈβ£ IMMEDIATE-Term: (2-4 months) we are in Beta testing for the entire blockchain infrastructure including Enterprise Chain, Power Plant, vNodes, VTRS/VNRG Digital Assets, and vApp
We also have the following business goals for the corporate chain of time to revenue ready.
1οΈβ£ Short-Term (4-8 months) β CyberVision is entering development. Please see flow and roadmap below.
2οΈβ£ Mid-Term 8-18mos = Full Cyber Suite (CyberID, CyberSYNQ, CyberKEYS, CyberSECURE)
3οΈβ£ Long-Term 18mos+ = F.A.M.E. chains
Commitment to Transparency β>
I will continue to offer utmost transparency and clarity to all of you as we move along this start up journey. But at any point along the way, I hope you will bring me questions that we can work through together as a community. Iβm happy to speak openly in front of everyoneβ¦ and sometimes spill some beans. ππ«‘
I appreciate all of your trust and confidence in this team as we continue to press forward.
We. Are. Vitreus.
LETS GO!! π«‘π
π£ Happy Build Update Friday @everyone !!
Like clockwork, we bring you full transparency into the work that is being completed each week towards turning our vision into a reality.
While last weekβs update was centered around successfully connecting the dev vNodes to vApp, this weekβs update centers around successfully executing a staking action. In fact, I watched them demo it for me on our weekly dev callβ¦ perfectly smooth. vNodes and Staking will be fully demo-able in our Web Summit booth next week. Exciting stuff. This next week is focused around executing VIP/VIPP elections in vApp.
The initial batch of 120 vNodes is currently sitting at the Ohio facility with our procurement partner, TD Synnx. We are awaiting finality on the VanguardianOS testing from Innowise so we can begin penetration testing with our amazing white-hat partner, NetSpi. At this point we are still on track to have vNodes out for global shipping by early December. If anything changes I will let you know as soon as I know.
CyberVISION received a full greenlight this week to begin detailed development of user stories as well as AI/ML discovery. This is an amazing use case for COMPLiQ and an incredible security centric foundation for our entry into BFSI (Banking, Financial Services, and Insurance).
For those of you who are more tech oriented please find the technical accomplishments below.
Part 1 of 2 - Cont'd π
Like clockwork, we bring you full transparency into the work that is being completed each week towards turning our vision into a reality.
While last weekβs update was centered around successfully connecting the dev vNodes to vApp, this weekβs update centers around successfully executing a staking action. In fact, I watched them demo it for me on our weekly dev callβ¦ perfectly smooth. vNodes and Staking will be fully demo-able in our Web Summit booth next week. Exciting stuff. This next week is focused around executing VIP/VIPP elections in vApp.
The initial batch of 120 vNodes is currently sitting at the Ohio facility with our procurement partner, TD Synnx. We are awaiting finality on the VanguardianOS testing from Innowise so we can begin penetration testing with our amazing white-hat partner, NetSpi. At this point we are still on track to have vNodes out for global shipping by early December. If anything changes I will let you know as soon as I know.
CyberVISION received a full greenlight this week to begin detailed development of user stories as well as AI/ML discovery. This is an amazing use case for COMPLiQ and an incredible security centric foundation for our entry into BFSI (Banking, Financial Services, and Insurance).
For those of you who are more tech oriented please find the technical accomplishments below.
Part 1 of 2 - Cont'd π
Part 2 of 2
Vitreus Power Plant & vApp
Last Weekβs Achievements β>
β Successfully extract syncing and block_number values
β Reconfigure the power plant image
β Add chain_spec inside the image
β Reconfigure the power plant container to accept unsafe RPC (Remote Procedure Call)
β Set up test vnodes to function as validators
β Extrinsics optimized
β Metamask/ethers tests
β Validator automation
β Staking docs
β Utility calls fee fix WIP
β Custom signing procedures
β sendTransaction function refactored
β Staking functionality in progress
β Polished flow with no Internet on the vNode
β Fixed login password hint.
β Fixed hardware overview UI when there's no connection.
β Onboarding flow for registered nodes.
β Change password flow updated
β Added syncing status.
β Block number retrieval from the vnode.
β Configured and optimized the connection between the frontend and backend
β Established the environment for the staging environment
β Enhanced the functionality of the affiliate system
β Modified the logic for adding and updating themes on the backend
β Deploy white label presale app dev, stage
β Add powerplant container to vnode iso
β Edit wifi default access to vnode. Turn of logging during boot.
β Customize auto disk decryption during boot with tpm module
Next Weekβs Plans β>
π¨ VIP/VIPP improvements
π¨ Stake/unstake flow
π¨ Node disconnect
π¨ Offline status
π¨ Validation
π¨ Incorporate CyberLYNQ into the build
π¨ Affiliate system improvements
π¨ Complete the KYC process and conduct testing
π¨ Resolve issues with image uploads to IPFS
π¨ Adjust logic for internal transaction indexing in the explorer
π¨ Support whitelabel
π¨ Build and customize iso
We. Are. Vitreus.
LETS GO!! π«‘π
Vitreus Power Plant & vApp
Last Weekβs Achievements β>
β Successfully extract syncing and block_number values
β Reconfigure the power plant image
β Add chain_spec inside the image
β Reconfigure the power plant container to accept unsafe RPC (Remote Procedure Call)
β Set up test vnodes to function as validators
β Extrinsics optimized
β Metamask/ethers tests
β Validator automation
β Staking docs
β Utility calls fee fix WIP
β Custom signing procedures
β sendTransaction function refactored
β Staking functionality in progress
β Polished flow with no Internet on the vNode
β Fixed login password hint.
β Fixed hardware overview UI when there's no connection.
β Onboarding flow for registered nodes.
β Change password flow updated
β Added syncing status.
β Block number retrieval from the vnode.
β Configured and optimized the connection between the frontend and backend
β Established the environment for the staging environment
β Enhanced the functionality of the affiliate system
β Modified the logic for adding and updating themes on the backend
β Deploy white label presale app dev, stage
β Add powerplant container to vnode iso
β Edit wifi default access to vnode. Turn of logging during boot.
β Customize auto disk decryption during boot with tpm module
Next Weekβs Plans β>
π¨ VIP/VIPP improvements
π¨ Stake/unstake flow
π¨ Node disconnect
π¨ Offline status
π¨ Validation
π¨ Incorporate CyberLYNQ into the build
π¨ Affiliate system improvements
π¨ Complete the KYC process and conduct testing
π¨ Resolve issues with image uploads to IPFS
π¨ Adjust logic for internal transaction indexing in the explorer
π¨ Support whitelabel
π¨ Build and customize iso
We. Are. Vitreus.
LETS GO!! π«‘π
Forwarded from Jaren | Crypto Rabbit π°
π£ Join us this Friday for a Vitreus Tech Talk Twitter Spaces event! We will be joined by our friend Brad Sollar at Mainsail.
We're excited to connect with you all!
We're excited to connect with you all!
Good morning @everyone from the team in Lisbon, Portugal.
As we round out the end of a successful #WebSummit conference, we reflect on the team building and company exposure opportunities afforded to Collaborative Digitalβs Vitreus team.
It was magnificent and did not disappoint.
New relationships forged and clarity created.
βοΈ Continuous demos of our decentralized blockchain infrastructure held for vApp, vNode, Block Explorer, Staking, etc. at the CDI booth
βοΈ Continuous brand exposure on 40 word videos playing in common areas throughout entire conference.
βοΈ Multiple meetings held with prospective B2B customers with very positive feedback
βοΈ On-stage speaking engagement (pitch style) to an audience of 500+ people.
βοΈ Global Competitor and Potential Partner awareness
Many of us missing from this picture holding the fort down at home, but we certainly couldnβt do it without them.
Team work makes the dream work.
Video to come. Letβs Go!! π«‘π
As we round out the end of a successful #WebSummit conference, we reflect on the team building and company exposure opportunities afforded to Collaborative Digitalβs Vitreus team.
It was magnificent and did not disappoint.
New relationships forged and clarity created.
βοΈ Continuous demos of our decentralized blockchain infrastructure held for vApp, vNode, Block Explorer, Staking, etc. at the CDI booth
βοΈ Continuous brand exposure on 40 word videos playing in common areas throughout entire conference.
βοΈ Multiple meetings held with prospective B2B customers with very positive feedback
βοΈ On-stage speaking engagement (pitch style) to an audience of 500+ people.
βοΈ Global Competitor and Potential Partner awareness
Many of us missing from this picture holding the fort down at home, but we certainly couldnβt do it without them.
Team work makes the dream work.
Video to come. Letβs Go!! π«‘π
Happy βBuild Updateβ Day @everyone !!
While half the team was crushing it at Web Summit in Lisbon, Portugal this past week, the rest were crushing it at home on the build progress.
Regarding the vNodes, the units are sitting at the Ohio facility while we await the completion of the testing and tweaking of VanguardianOS, after which we will begin penetration testing. NetSPI has laid out an aggressive PenTesting regimen on the ENTIRE infrastructure that needs to be tweaked for budgetary reasons. But we should be ready to begin security testing on November 27. Iβm waiting to get a final estimation on how long this βpen testingβ is going to take.
The new vNode/Staking tab in vApp is also almost complete (95%). As you saw a small little demo video at Web Summit, the staking is readyβ¦ and itβs fast and smooth. That version should be getting close to being updated to Closed Beta testers.
MVP = Power Plant, Enterprise Chain, vApp, vNode, VTRS/VNRG, Staking β> so close!!!
Cont'd π1/2
While half the team was crushing it at Web Summit in Lisbon, Portugal this past week, the rest were crushing it at home on the build progress.
Regarding the vNodes, the units are sitting at the Ohio facility while we await the completion of the testing and tweaking of VanguardianOS, after which we will begin penetration testing. NetSPI has laid out an aggressive PenTesting regimen on the ENTIRE infrastructure that needs to be tweaked for budgetary reasons. But we should be ready to begin security testing on November 27. Iβm waiting to get a final estimation on how long this βpen testingβ is going to take.
The new vNode/Staking tab in vApp is also almost complete (95%). As you saw a small little demo video at Web Summit, the staking is readyβ¦ and itβs fast and smooth. That version should be getting close to being updated to Closed Beta testers.
MVP = Power Plant, Enterprise Chain, vApp, vNode, VTRS/VNRG, Staking β> so close!!!
Cont'd π1/2
From π2/2
For the more technically sound individuals, please see a list of specific accomplishments from last week below.
Vitreus Power Plant & vApp
Last Weekβs Accomplishments β>
β EVM TX fix continuation (low gas limit issues, implementing new tx validation mechanism)
β DappNode package manager progression and IIPFS resolver
β Mobile features (staking, claiming, unstaking)
β Adjusted VIP with a focus on staking.
β Fixed texts and loader
β Added disconnect, loader, offline status
β New files from Wallet Connect
β Pageview for transactions list
β Implemented staking
β Fixed block logic and added syncing, block number, socket
β Extracting and indexing hashes for internal transactions
β Added error handlers for microservices
β KYC flow on the affiliate platform
β Fixed repositories with database queries
β Integrate logic for linking themes with user entities
β Resolve image-related issues
β Field filtering for administrators
β Improved the handling of image insertion
β Capability to embed videos in all technically feasible fields
β Resolved an issue on the Explorer related to internal transactions
β Integration the existing Claiming page with CyberLYNQ
β Dev chain improvements
β Fixed whitelabel presale stage environment
β Spin up vnode_demo
β Set up new telemetry
β Build vNode ISO
Next Weekβs plans β>
π¨ Utility calls fee fix
π¨ Updating the reward calculation system in VIP
π¨ Continue working on the affiliate platform
π¨ Integrate logic for linking themes with user entities
π¨ Resolve image-related issues
π¨ Address and fix any remaining bugs
π¨ Finalyzing the whitelabel affiliate
We. Are. Vitreus.
LETβS GO!!! π«‘π
For the more technically sound individuals, please see a list of specific accomplishments from last week below.
Vitreus Power Plant & vApp
Last Weekβs Accomplishments β>
β EVM TX fix continuation (low gas limit issues, implementing new tx validation mechanism)
β DappNode package manager progression and IIPFS resolver
β Mobile features (staking, claiming, unstaking)
β Adjusted VIP with a focus on staking.
β Fixed texts and loader
β Added disconnect, loader, offline status
β New files from Wallet Connect
β Pageview for transactions list
β Implemented staking
β Fixed block logic and added syncing, block number, socket
β Extracting and indexing hashes for internal transactions
β Added error handlers for microservices
β KYC flow on the affiliate platform
β Fixed repositories with database queries
β Integrate logic for linking themes with user entities
β Resolve image-related issues
β Field filtering for administrators
β Improved the handling of image insertion
β Capability to embed videos in all technically feasible fields
β Resolved an issue on the Explorer related to internal transactions
β Integration the existing Claiming page with CyberLYNQ
β Dev chain improvements
β Fixed whitelabel presale stage environment
β Spin up vnode_demo
β Set up new telemetry
β Build vNode ISO
Next Weekβs plans β>
π¨ Utility calls fee fix
π¨ Updating the reward calculation system in VIP
π¨ Continue working on the affiliate platform
π¨ Integrate logic for linking themes with user entities
π¨ Resolve image-related issues
π¨ Address and fix any remaining bugs
π¨ Finalyzing the whitelabel affiliate
We. Are. Vitreus.
LETβS GO!!! π«‘π