1. Why is super plasticizer added to concrete?
1. To reduce the quantity of mixing water.
2. To increase the consistency.
3. To reduce the quantity of cement.
4. To increase resistance to freezing an thawing.
Select the correct answer using the codes given below:
a) 1 and 2 b) 2 and 3
c) 1 and 4 d) 1, 4 and 3
2. As per IS Code of Practice, concrete should be cured at
a) 5oC b) 10oC c) 27oC d) 40oC
3. The maximum bulking of sand is likely to occur at a moisture content of
a) 5% b) 8% c) 11% d) 14%
4. Which of the following aggregates gives maximum strength in concrete?
a) Rounded aggregate b) Elongated aggregate
c) Flaky aggregate d) Cubical aggregate
5. Which of the following pairs is not matched correctly with regard to
coarse aggregate > 10 mm?
a) Strength - 10 per cent fine
b) Toughness - Impact test
c) Hardness - Abrasion set
d) Specific Gravity - Pyconometer
6. A gauged mortar is obtained by adding which of the following ingredients to cement?
a) Sandstone b) Sand and surkhi
c) Sand and lime d) Surkhi alone
7. Marble is quarried by
a) blasting b) excavating c) heating d) wedging
8. Which of the following stone has maximum % water absorption by volume?
a) Shale b) Granite c) Slate d) Quartzite
9. The chemical used to protect stones in industrial towns is
a) Ba (OH)2 b) CaCl2 c) H2SO4 d) caustic alkalis
10. The temperature range in a cement kiln is
a) 500oC to 1000oC b) 1000oC to 1200oC
c) 1300oC to 1500oC d) 1600oC to 2000oC
11. Which of the following pairs is not matched correctly? (Cement Test) (Apparatus)
a) Fineness - Nurse and blains b) Consistency - Vicat
c) Soundness - Le-Chatelier d) Specific Gravity - Lea and Nurse
12. Rapid hardening cement attains early strength due to
a) larger proportion of lime grounded finer than normal cement.
b) lesser proportion of lime grounded coarser than normal cement.
c) lesser proportion of lime grounded finer than normal cement.
d) larger proportion of lime grounded coarser than normal cement.
13. Soundness test of cement determines
a) quality of free lime b) ultimate strength
c) durability d) initial setting
14. A first class brick when immersed in cold water for 24 hours should not absorb more than __ % of water of its dry weight.
a) 15% b) 20% c) 22% d) 25%
15. The percentage of alumina in a good brick earth lies between
a) 5% to 10% b) 20% to 30%
c) 50% to 60% d) 70% to 80%
16. Crushing strength of a first class brick should not be less than
a) 35 kg / cm3 b) 70 kg / cm2
c) 105 kg / cm2 d) 140 kg / cm2
17. The temperature at which bricks are burnt varies from:
a) 500oC to 700oC b) 700oC to 1000oC
c) 1000oC to 1200oC d) 1200oC to 1500oC
18. For one cubic metre of brick masonry, the number of modular bricks needed is
a) 400 or less b) 400 to 450
c) 500 to 550 d) 600 to 650
19. Gypsum is used as an admixture in cement grouts for
a) Accelerating the setting time
b) Retarding the setting time
c) Increasing the plasticity
d) Reducing the grout shrinkage
Answers / Key:
1-a; 2-c; 3-a; 4-d; 5-d; 6-c; 7-d; 8-a; 9-a; 10-c; 11-d; 12-a; 13-a; 14-a; 15-b; 16-c; 17-c; 18-c; 19-b
1. To reduce the quantity of mixing water.
2. To increase the consistency.
3. To reduce the quantity of cement.
4. To increase resistance to freezing an thawing.
Select the correct answer using the codes given below:
a) 1 and 2 b) 2 and 3
c) 1 and 4 d) 1, 4 and 3
2. As per IS Code of Practice, concrete should be cured at
a) 5oC b) 10oC c) 27oC d) 40oC
3. The maximum bulking of sand is likely to occur at a moisture content of
a) 5% b) 8% c) 11% d) 14%
4. Which of the following aggregates gives maximum strength in concrete?
a) Rounded aggregate b) Elongated aggregate
c) Flaky aggregate d) Cubical aggregate
5. Which of the following pairs is not matched correctly with regard to
coarse aggregate > 10 mm?
a) Strength - 10 per cent fine
b) Toughness - Impact test
c) Hardness - Abrasion set
d) Specific Gravity - Pyconometer
6. A gauged mortar is obtained by adding which of the following ingredients to cement?
a) Sandstone b) Sand and surkhi
c) Sand and lime d) Surkhi alone
7. Marble is quarried by
a) blasting b) excavating c) heating d) wedging
8. Which of the following stone has maximum % water absorption by volume?
a) Shale b) Granite c) Slate d) Quartzite
9. The chemical used to protect stones in industrial towns is
a) Ba (OH)2 b) CaCl2 c) H2SO4 d) caustic alkalis
10. The temperature range in a cement kiln is
a) 500oC to 1000oC b) 1000oC to 1200oC
c) 1300oC to 1500oC d) 1600oC to 2000oC
11. Which of the following pairs is not matched correctly? (Cement Test) (Apparatus)
a) Fineness - Nurse and blains b) Consistency - Vicat
c) Soundness - Le-Chatelier d) Specific Gravity - Lea and Nurse
12. Rapid hardening cement attains early strength due to
a) larger proportion of lime grounded finer than normal cement.
b) lesser proportion of lime grounded coarser than normal cement.
c) lesser proportion of lime grounded finer than normal cement.
d) larger proportion of lime grounded coarser than normal cement.
13. Soundness test of cement determines
a) quality of free lime b) ultimate strength
c) durability d) initial setting
14. A first class brick when immersed in cold water for 24 hours should not absorb more than __ % of water of its dry weight.
a) 15% b) 20% c) 22% d) 25%
15. The percentage of alumina in a good brick earth lies between
a) 5% to 10% b) 20% to 30%
c) 50% to 60% d) 70% to 80%
16. Crushing strength of a first class brick should not be less than
a) 35 kg / cm3 b) 70 kg / cm2
c) 105 kg / cm2 d) 140 kg / cm2
17. The temperature at which bricks are burnt varies from:
a) 500oC to 700oC b) 700oC to 1000oC
c) 1000oC to 1200oC d) 1200oC to 1500oC
18. For one cubic metre of brick masonry, the number of modular bricks needed is
a) 400 or less b) 400 to 450
c) 500 to 550 d) 600 to 650
19. Gypsum is used as an admixture in cement grouts for
a) Accelerating the setting time
b) Retarding the setting time
c) Increasing the plasticity
d) Reducing the grout shrinkage
Answers / Key:
1-a; 2-c; 3-a; 4-d; 5-d; 6-c; 7-d; 8-a; 9-a; 10-c; 11-d; 12-a; 13-a; 14-a; 15-b; 16-c; 17-c; 18-c; 19-b
👍3❤2
LAWS OF CONTRACT
according to civil code art.1675
Contract is an agreement b/n 2 parties and it needs to be
👉concent
👉legal and lawful
👉possible
👉valid before court
👉must has offeree and offerer
.
.
.etc
Purpose of contract
👉to avoid risk of non performance
👉to describe scope of work
👉to establish time frame
👉to establish cost and payment provision
👉to set for the obligation and relationships
👉to manage multiple risk
👉to minimize dispute and claim
Types of construction contract
1Lump sum:- the contractor offered to do the whole work for the total stipulated money
2 Unit rate:- amount to be received by the contractor depends up on the quantities of various items of work actually executed
3 Lump sum and Schedule:- contractor offered to do a particular work at a fixed sum within a specified time as per plan and specifications
4 Cost plus:- used in difficult situation either for the owner or contractor to predict the cost during negotiations
4.1Cost plus fixxed fee
4.2 Cost plus percentage of cost
.
.
.
according to civil code art.1675
Contract is an agreement b/n 2 parties and it needs to be
👉concent
👉legal and lawful
👉possible
👉valid before court
👉must has offeree and offerer
.
.
.etc
Purpose of contract
👉to avoid risk of non performance
👉to describe scope of work
👉to establish time frame
👉to establish cost and payment provision
👉to set for the obligation and relationships
👉to manage multiple risk
👉to minimize dispute and claim
Types of construction contract
1Lump sum:- the contractor offered to do the whole work for the total stipulated money
2 Unit rate:- amount to be received by the contractor depends up on the quantities of various items of work actually executed
3 Lump sum and Schedule:- contractor offered to do a particular work at a fixed sum within a specified time as per plan and specifications
4 Cost plus:- used in difficult situation either for the owner or contractor to predict the cost during negotiations
4.1Cost plus fixxed fee
4.2 Cost plus percentage of cost
.
.
.
👍2
What we mean when we say conventional pavement have higher intensity on the top and inferior intensity at the bottom ?
Conventional pavements are a multilayered structure where better matrials are at the top(where stress is high which is from wheel load) and inferior materials at the bottom where stress intensity is low)....so higher intensity at the top mean high load carring capacity at the top...and reverse is true for bottom
Factor of safety is define as the ratio of yield
stress to working Stress. According to
designing point of view, none of the material
is 100 % reliable, we desgin the structure
member for given working Stress and keep
the Stress in such a way that they can not
reached or exceed there permissible values
because ones the material of the members
reaches to there permissible values then
yielding get start and the structure is treated
as failed structure. We design the structure
member with in the proportional limit and If
the materials subjected to the Stress which is
equal to permissible values and more than
this , Hence structural member get fail.
So as a designer we desgin the structure
including some factor of safety. And design
the member in such a way that material of
members keeps with in its proportional limit
by the help of factors of safety
For example, In case of RCC design the factor
of safety for concrete is taken as 1.5 and for
steel it is 1.15.
stress to working Stress. According to
designing point of view, none of the material
is 100 % reliable, we desgin the structure
member for given working Stress and keep
the Stress in such a way that they can not
reached or exceed there permissible values
because ones the material of the members
reaches to there permissible values then
yielding get start and the structure is treated
as failed structure. We design the structure
member with in the proportional limit and If
the materials subjected to the Stress which is
equal to permissible values and more than
this , Hence structural member get fail.
So as a designer we desgin the structure
including some factor of safety. And design
the member in such a way that material of
members keeps with in its proportional limit
by the help of factors of safety
For example, In case of RCC design the factor
of safety for concrete is taken as 1.5 and for
steel it is 1.15.
👍1
#SHEAR_WALL
.
SHEAR WALL = የአግዳሚ ወይም horizontal load ተፅዕኖዎችን የሚቋቋሙልን ግድግዳዎች ናቸው፡፡ ሺር ዎል የተባሉበትም ምክንያት የመሬት መንቀጥቀጥ በጎን አቅጣጫ ስለሚመጣና ዎሎቹ ላይ የሺር ተፅዕኖ ስለሚያሳድር ነው ( ሺር በ Thickness ትይዩ በሆነ አቅጣጫ እንደሚመጣ ልብ ማለት ይገባል፡፡ Horizontal force የሆኑት Earth Quake እና Wind Load በዎሎቹ Thickness ትይዩ በሆነ አቅጣጫ ነው የሚመጡት) ፡፡ ሺር ዎሎች በትክክል ዲዛይን ተደርገው ትክክለኛ ቦታቸው ላይ ካልተቀመጡ ከጥቅማቸው ይልቅ ጉዳታቸው እጅግ ብዙ ነው፡፡ ህንጻውን አፍራሽ ግብረ ሃይል ናቸው - ስለዚህ እንዴት ማስቀመጥ እንዳለብን ቀጥለን እንመልከት፡
1) አንድ ህንፃ ላይ የሚፈቀደው ትንሹ የሺር ዎል ብዛት ሶስት ነው፡፡ ቢያንስ-ሶስት
2) ሶስት ወይም ከዛ በላይ ሺር ዎሎች ካሉን የዎሎቹ አክሲሶች አንድ ነጥብ ላይ መገናኘት የለባቸውም
3) ትይዩ እንዲሆኑ የሚፈቀደው ቢበዛ ለሁለት ዎሎች ነው፡፡
ሺር ዎሎች ከኮለንና ቢም ይልቅ የህንፃውን ጥንካሬ ወይም Stiffness ወደ ራሳቸው የመጎተት ከፍተኛ አቅም አላቸው ፤ እንደሚታወቀው የመሬት መንቀጥቀጥ act የሚያደርገው Center of Mass ላይ ነው ፤ የመሬት መንቀጥቀጥን በተሻለ ሁኔታ ለመቋቋም ደግሞ የህንፃው ጥንካሬ ወይም Center of Stiffness የሚገኝበት ነጥብና የህንጻው Center of Mass የሚገኝበት ነጥብ በተቻለ መጠን መቀራረብ አለበት ፤ እናም ስናጠቃልለው - በትክክል ያልተቀመጡ ሺር ዎሎች የህንጻውን Center of Stiffness ወይም ጥንካሬ ወደራሳቸው ሲጎትቱት ከ Center of Mass እንዲርቅ ያደርጉታል - በመራራቃቸው የተነሳ እሽክርክሪት ፎርስ ወይም Torsion ይፈጠራል ፡፡ Torsion ህንፃው እንዲፈርስ ያደርገዋል፡፡ የኒውተን ሶስተኛ ህግ ምን ይላል “The forces of action and reaction between interacting bodies are equal in magnitude, opposite in direction and COLLINEAR” – ሁለት ፎርሶች Collinear force የሚባሉት ደግሞ በአንድ መስመር act ሲያደርጉ ነው፡፡ የመሬት መንቀጥቀጡ CM ላይ Act ሲያደርግ CS ደግሞ በሺር ዎሎቹ ስለተጎተተ ሌላ ቦታ React ያደርጋል፡፡ በዚህ የተነሳ Collinear force አይደሉም ማለት ነው፡፡ ስለዚህ Newton Third Law ውድቅ ሆነ ማለት ነው፡፡ Action እና Reaction በመጠንም ይሁን በአቅጣጫ እኩል ስለማይሆኑ ትርፍ balance ያልተደረገ force ይፈጠራል - Newton First Lawን ታሳቢ በማድረግ ህንፃው Equilibrium ላይ አይሆንም ማለት ነው፡፡ የኒውተን ሁለተኛ ህግስ ማን አለው የሚል ሰው ካለ - በመሬት መንቀጥቀጥ ሳቢያ የሚፈጠረው ፎርስ ማለት የህንፃው ክብደት ሲባዛ በእንቅጥቃጤው የሚፈጠር Acceleration ነው - ይህም Newton Second Law ነው::
.
ስናጠቃልለው ከጥፋት ለመዳን ሺር ዎልን ስናስቀምጥ ከላይ ያሉትን ሶስት ነጥቦች ተግባራዊ ማድረግ አለብን፡፡
.
.
.
SHEAR WALL = የአግዳሚ ወይም horizontal load ተፅዕኖዎችን የሚቋቋሙልን ግድግዳዎች ናቸው፡፡ ሺር ዎል የተባሉበትም ምክንያት የመሬት መንቀጥቀጥ በጎን አቅጣጫ ስለሚመጣና ዎሎቹ ላይ የሺር ተፅዕኖ ስለሚያሳድር ነው ( ሺር በ Thickness ትይዩ በሆነ አቅጣጫ እንደሚመጣ ልብ ማለት ይገባል፡፡ Horizontal force የሆኑት Earth Quake እና Wind Load በዎሎቹ Thickness ትይዩ በሆነ አቅጣጫ ነው የሚመጡት) ፡፡ ሺር ዎሎች በትክክል ዲዛይን ተደርገው ትክክለኛ ቦታቸው ላይ ካልተቀመጡ ከጥቅማቸው ይልቅ ጉዳታቸው እጅግ ብዙ ነው፡፡ ህንጻውን አፍራሽ ግብረ ሃይል ናቸው - ስለዚህ እንዴት ማስቀመጥ እንዳለብን ቀጥለን እንመልከት፡
1) አንድ ህንፃ ላይ የሚፈቀደው ትንሹ የሺር ዎል ብዛት ሶስት ነው፡፡ ቢያንስ-ሶስት
2) ሶስት ወይም ከዛ በላይ ሺር ዎሎች ካሉን የዎሎቹ አክሲሶች አንድ ነጥብ ላይ መገናኘት የለባቸውም
3) ትይዩ እንዲሆኑ የሚፈቀደው ቢበዛ ለሁለት ዎሎች ነው፡፡
ሺር ዎሎች ከኮለንና ቢም ይልቅ የህንፃውን ጥንካሬ ወይም Stiffness ወደ ራሳቸው የመጎተት ከፍተኛ አቅም አላቸው ፤ እንደሚታወቀው የመሬት መንቀጥቀጥ act የሚያደርገው Center of Mass ላይ ነው ፤ የመሬት መንቀጥቀጥን በተሻለ ሁኔታ ለመቋቋም ደግሞ የህንፃው ጥንካሬ ወይም Center of Stiffness የሚገኝበት ነጥብና የህንጻው Center of Mass የሚገኝበት ነጥብ በተቻለ መጠን መቀራረብ አለበት ፤ እናም ስናጠቃልለው - በትክክል ያልተቀመጡ ሺር ዎሎች የህንጻውን Center of Stiffness ወይም ጥንካሬ ወደራሳቸው ሲጎትቱት ከ Center of Mass እንዲርቅ ያደርጉታል - በመራራቃቸው የተነሳ እሽክርክሪት ፎርስ ወይም Torsion ይፈጠራል ፡፡ Torsion ህንፃው እንዲፈርስ ያደርገዋል፡፡ የኒውተን ሶስተኛ ህግ ምን ይላል “The forces of action and reaction between interacting bodies are equal in magnitude, opposite in direction and COLLINEAR” – ሁለት ፎርሶች Collinear force የሚባሉት ደግሞ በአንድ መስመር act ሲያደርጉ ነው፡፡ የመሬት መንቀጥቀጡ CM ላይ Act ሲያደርግ CS ደግሞ በሺር ዎሎቹ ስለተጎተተ ሌላ ቦታ React ያደርጋል፡፡ በዚህ የተነሳ Collinear force አይደሉም ማለት ነው፡፡ ስለዚህ Newton Third Law ውድቅ ሆነ ማለት ነው፡፡ Action እና Reaction በመጠንም ይሁን በአቅጣጫ እኩል ስለማይሆኑ ትርፍ balance ያልተደረገ force ይፈጠራል - Newton First Lawን ታሳቢ በማድረግ ህንፃው Equilibrium ላይ አይሆንም ማለት ነው፡፡ የኒውተን ሁለተኛ ህግስ ማን አለው የሚል ሰው ካለ - በመሬት መንቀጥቀጥ ሳቢያ የሚፈጠረው ፎርስ ማለት የህንፃው ክብደት ሲባዛ በእንቅጥቃጤው የሚፈጠር Acceleration ነው - ይህም Newton Second Law ነው::
.
ስናጠቃልለው ከጥፋት ለመዳን ሺር ዎልን ስናስቀምጥ ከላይ ያሉትን ሶስት ነጥቦች ተግባራዊ ማድረግ አለብን፡፡
.
.
👍2❤1
what does C25??? It is the compressive strength of concrete after 28 days by conducting a cube test.
What is the d/Ce b/n one way slab & 2 way slab?
One way slab is a type ov solid slab. it's defined as; the ratio of the longer direxn (Ly) to z shorter direxn (Lx) is greater than or equal to 2. But in case of 2 way less than two.
Their reinforcement arrangement is as follows.
✍✍ in one way slab main bar is meshed in z shorter direxn. Whereas, distribution bars are placed along z longer side.
Hence, #main #bars are used to #transfer z #bending to z bottom.
But #distribution bars are used to #resist #shear #stress which causes cracks in a slab.
✍ But in two way slab; main bars are meshed in both direxns. ( i.e, longer n shorter)
One way slab is a type ov solid slab. it's defined as; the ratio of the longer direxn (Ly) to z shorter direxn (Lx) is greater than or equal to 2. But in case of 2 way less than two.
Their reinforcement arrangement is as follows.
✍✍ in one way slab main bar is meshed in z shorter direxn. Whereas, distribution bars are placed along z longer side.
Hence, #main #bars are used to #transfer z #bending to z bottom.
But #distribution bars are used to #resist #shear #stress which causes cracks in a slab.
✍ But in two way slab; main bars are meshed in both direxns. ( i.e, longer n shorter)
👍1
Deformed_bars#??
.
ከባለ 6mm ዲያሜትር ብረት በስተቀር አብዛኛው ብረቶች ዙሪያቸውን ribs አለባቸው፡፡ ይህ የሆነበት ምክንያት በኮንክሪቱና በብረቱ መሃል bond እንዲኖርና ሎድ እንዲተላለፍ ነው፡፡ በተጨማሪም ስትራክቸሩ deflect በሚያደርግበት ጊዜ ብረቱ ለብቻው ተንሸራቶ እስትራክቸሩ fail እንዳያደርግ ይጠቅማል፡፡ R.C. Structure ዲዛይን ስናረግ assume ከምናደርጋቸው ውስጥ “ THE Reinforcement is Subjected To The Same Variation In The Strain As The Adjacent Concrete “ የሚለው assumption deformed bar እና development length በመጠቀማችን የተነሳ true ይሆናል::
.
.
.
ከባለ 6mm ዲያሜትር ብረት በስተቀር አብዛኛው ብረቶች ዙሪያቸውን ribs አለባቸው፡፡ ይህ የሆነበት ምክንያት በኮንክሪቱና በብረቱ መሃል bond እንዲኖርና ሎድ እንዲተላለፍ ነው፡፡ በተጨማሪም ስትራክቸሩ deflect በሚያደርግበት ጊዜ ብረቱ ለብቻው ተንሸራቶ እስትራክቸሩ fail እንዳያደርግ ይጠቅማል፡፡ R.C. Structure ዲዛይን ስናረግ assume ከምናደርጋቸው ውስጥ “ THE Reinforcement is Subjected To The Same Variation In The Strain As The Adjacent Concrete “ የሚለው assumption deformed bar እና development length በመጠቀማችን የተነሳ true ይሆናል::
.
.
Tests on Concrete

The following are some of the important tests conducted on concrete:
1. Slump test.
2. Compaction factor test.
3. Crushing strength test.
1. Slump Test:
This test is conducted to determine the workability of concrete. It needs a slump
cone for test Slump cone is a vessel in the shape of a frustum of a cone with diameter at bottom 200mm and 50mm at top and 300 mm high. This cone is kept over a impervious platform and is filled with concrete in four layers. Each layer is tamped with a 16 mm pointed rod for 25 times. After filling completely the cone is gently pulled up. The decrease in the height of the concrete is called slump. Higher the slump, more workable is the concrete.
2. Compaction Factor Test:
This is another test to identify the workability of concrete. This test is conducted in the laboratory. The test equipment consists of two hoppers and a cylinder fixed to a stand, the dimensions and the distances between the three vessels being standardized.
Vessel A and B are having hinged bottoms whereas cylinder C is having fixed bottom. Top vessel A is filled with the concrete to be tested. As soon as it is filled, the hinged door is opened. Concrete is collected in vessel B. Then the hinged door of B is opened to collect concrete in cylinder C. The concrete in cylinder C is weighted.
Let it be W1.Now cylinder is again filled with the sample of concrete in 50 mm layers, which is compacted by ramming and vibrating. Then the weight of compacted concrete is determined. Let this weight be W2. The ratio W1/W2 is termed as compaction factor.
3. Crushing Strength Test: Metallic moulds of size 150 mm × 150 mm × 150 mm are used for
casting concrete cubes. Before filling mould, it is properly oiled on its inner surfaces, so that cubes can be easily separated. Fresh cube is filled with concrete to be tested in 3 layers and kept in the room. After 24 hours, cube is removed from the mould and kept under water for curing.
After 28 days of curing cubes are tested in the compression testing machine. In this test cubes are placed over the smooth surface which is in contact with side plates of mould. The crushing load is noted and crushing strength is found as load divided by surface area (150 × 150 mm2).
Code specify the desirable strength of concrete for 3 days and 7 days for quick assessment of strength of concrete.Desirable Properties of Concrete Appropriate quality and quantity of cement, fine aggregate, coarse aggregate and water should be used so that the green concrete has the following properties:
(a) Desired workability
(b) No segregation in transporting and placing
(c) No bleeding and
(d) No harshness.
Hardened concrete should have
(a) required characteristic strength
(b) minimum dimensional changes
(c) good durability
(d) impermeable
(e) good resistance to wear and tear.

The following are some of the important tests conducted on concrete:
1. Slump test.
2. Compaction factor test.
3. Crushing strength test.
1. Slump Test:
This test is conducted to determine the workability of concrete. It needs a slump
cone for test Slump cone is a vessel in the shape of a frustum of a cone with diameter at bottom 200mm and 50mm at top and 300 mm high. This cone is kept over a impervious platform and is filled with concrete in four layers. Each layer is tamped with a 16 mm pointed rod for 25 times. After filling completely the cone is gently pulled up. The decrease in the height of the concrete is called slump. Higher the slump, more workable is the concrete.
2. Compaction Factor Test:
This is another test to identify the workability of concrete. This test is conducted in the laboratory. The test equipment consists of two hoppers and a cylinder fixed to a stand, the dimensions and the distances between the three vessels being standardized.
Vessel A and B are having hinged bottoms whereas cylinder C is having fixed bottom. Top vessel A is filled with the concrete to be tested. As soon as it is filled, the hinged door is opened. Concrete is collected in vessel B. Then the hinged door of B is opened to collect concrete in cylinder C. The concrete in cylinder C is weighted.
Let it be W1.Now cylinder is again filled with the sample of concrete in 50 mm layers, which is compacted by ramming and vibrating. Then the weight of compacted concrete is determined. Let this weight be W2. The ratio W1/W2 is termed as compaction factor.
3. Crushing Strength Test: Metallic moulds of size 150 mm × 150 mm × 150 mm are used for
casting concrete cubes. Before filling mould, it is properly oiled on its inner surfaces, so that cubes can be easily separated. Fresh cube is filled with concrete to be tested in 3 layers and kept in the room. After 24 hours, cube is removed from the mould and kept under water for curing.
After 28 days of curing cubes are tested in the compression testing machine. In this test cubes are placed over the smooth surface which is in contact with side plates of mould. The crushing load is noted and crushing strength is found as load divided by surface area (150 × 150 mm2).
Code specify the desirable strength of concrete for 3 days and 7 days for quick assessment of strength of concrete.Desirable Properties of Concrete Appropriate quality and quantity of cement, fine aggregate, coarse aggregate and water should be used so that the green concrete has the following properties:
(a) Desired workability
(b) No segregation in transporting and placing
(c) No bleeding and
(d) No harshness.
Hardened concrete should have
(a) required characteristic strength
(b) minimum dimensional changes
(c) good durability
(d) impermeable
(e) good resistance to wear and tear.
In addition to this any structural member (flexural member) has two zone ........tension and compression. The rebar always provided in tension zone ......so, if the moment is negative the tension of the member is located on the top of the member section ....if it is positive the tension zone located at the bottom....
#Load_Combination
.
Load Combination - አንድ ፎቅ ላይ የሚመጡ ሎዶችን Analyze ስናደርግ ሁሉም ሎዶች (LL,DL,EQ,WL, etc) በተመሳሳይ ሰዓት ይከሰታሉ ተብሎ አይታሰብም እንደዛ ቢሆን ኖሮ ለትንንሽ ፎቆች ትልልቅ size ያላቸው Beam, Column እና Slab ባስፈለገንና Uneconomical በሆንን ነበር፡፡ አንዱ ሎድና ሌላው ሎድ አንድ ላይ ሲከሰት ወዘተ እያልን Load Combination እናወጣለን፡፡ ሎዶቹንም በ Factor እናባዛቸዋለን:: Factor ያስፈለገበትም ምክንያት Load occurrence probability እና በተለያዩ ምክንያቶች የሚፈጠሩ Load Uncertainties ለማስወገድ ነው፡፡
.
ስንት Load Combination አለ??
.
.
ብዙ ምሁራን በ Load Combination ብዛት ሲወዛገቡ ይታያል፡፡ አንዳንዶች 2 ነው ይላሉ ፤ ሌሎች 7 ነው ይላሉ ፤ ሌሎሎሎች 5 ፤ ሌሎሎሎሎሎች 11……..ለማንኛውም ሰባትና ዘጠኝ ናቸው!!!
.
.
ሰባት የሚሆነው Earth Quake እና Wind Loadን እኛ ካልኩሌት አድርገን ከሁለቱ Govern የሚያደርገውን ከለየን በኋላ Governing ሎዱን በቁጥር ለሴፍትዌሩ (SAP/Etabs) ስንሰጠው ሰባት ነው፡፡
.
.
ዘጠኝ የሚሆነው የ Earth Quake ወይም Wind ሎዱን የተለያዩ ፋክተሮች ለሶፍትዌሩ እንሰጠውና እራሱ ሶፍትዌሩ ሎዱን ካልኩሌት አድርጎ አንዲጠቀም ከፈለግን ዘጠኝ Combo እ
.
Load Combination - አንድ ፎቅ ላይ የሚመጡ ሎዶችን Analyze ስናደርግ ሁሉም ሎዶች (LL,DL,EQ,WL, etc) በተመሳሳይ ሰዓት ይከሰታሉ ተብሎ አይታሰብም እንደዛ ቢሆን ኖሮ ለትንንሽ ፎቆች ትልልቅ size ያላቸው Beam, Column እና Slab ባስፈለገንና Uneconomical በሆንን ነበር፡፡ አንዱ ሎድና ሌላው ሎድ አንድ ላይ ሲከሰት ወዘተ እያልን Load Combination እናወጣለን፡፡ ሎዶቹንም በ Factor እናባዛቸዋለን:: Factor ያስፈለገበትም ምክንያት Load occurrence probability እና በተለያዩ ምክንያቶች የሚፈጠሩ Load Uncertainties ለማስወገድ ነው፡፡
.
ስንት Load Combination አለ??
.
.
ብዙ ምሁራን በ Load Combination ብዛት ሲወዛገቡ ይታያል፡፡ አንዳንዶች 2 ነው ይላሉ ፤ ሌሎች 7 ነው ይላሉ ፤ ሌሎሎሎች 5 ፤ ሌሎሎሎሎሎች 11……..ለማንኛውም ሰባትና ዘጠኝ ናቸው!!!
.
.
ሰባት የሚሆነው Earth Quake እና Wind Loadን እኛ ካልኩሌት አድርገን ከሁለቱ Govern የሚያደርገውን ከለየን በኋላ Governing ሎዱን በቁጥር ለሴፍትዌሩ (SAP/Etabs) ስንሰጠው ሰባት ነው፡፡
.
.
ዘጠኝ የሚሆነው የ Earth Quake ወይም Wind ሎዱን የተለያዩ ፋክተሮች ለሶፍትዌሩ እንሰጠውና እራሱ ሶፍትዌሩ ሎዱን ካልኩሌት አድርጎ አንዲጠቀም ከፈለግን ዘጠኝ Combo እ
#Fcd_Fyd_Fcu_Fck_C-25_S-400???
.
Fcu ( characteristic cubic compressive strength ) = ኪዩብ ቴስት አድርገን ካገኘናቸው ውጤቶች ውስጥ ካራክተርስቲክ እስትሬንግዝ ነው Fcu ማለት፡፡ የኮንክሪት ግሬድ የሚገለፀው በዚህ ነው፡፡ ለምሳሌ C-30 ማለት ካራክተርስቲክ compressive እስትሬንግዙ 30 Mpa ነው ማለት ነው እንጂ መሸከም የሚችለው ትልቅ ሎድ አይደለም ብዙ ሰዎች በዚህ ይሸወዳሉ፡፡ ካራክተርስቲክ እስትሬንግዝ ነው እንጂ አልቲሜት ሎድ ወይም አልቲሜት እስትሬንግዝ አይደለም፡፡
.
Fck ( characteristic cylindrical compressive strength) = ከ fcu የሚለያየው ነገር ይሆንን ውጤት የምናገኘው ሲሊንደሪካል ቴስት አድርገን ነው፡፡ እኛ ሃገር የተለመደው ኪዩብ ቴስት ነው - ኪዩብን ወደ ሲሊንደሪካል ኮምፕረሲቭ እስትሬንግዝ ለመቀየር fck = 0.8xfcu
.
Fcd (design strength of concrete) = fck እና fcu ላብራቶሪ ውስጥ የተገኙ ውጤቶች ናቸው ነው ነገር ግን በጥራት ችግር የተነሳ ሳይት ላይ ያንን እስትሬንግዝ ሙሉ ለሙሉ ማምጣት አስቸጋሪ ነው፡፡ ስለዚህም fck እና fcu በ Partial Safety Factor እናዳክማቸዋለን፡፡ [ fcd = 0.85fck/F.s ]……………. Design strength of concrete in compression 0.85 ያስገባንበት ምክንያት ቴስት ሳምፕሉ ከእውነተኛው የኮንክሪት እስትሬንግዝ ጋር ያለውን ልዩነት ግምት ውስጥ ለማስገባት ነው
.
Fyk (characteristic yield strength of reinforcement) = የብረቱ ካራክተርስቲክ እስትሬንግዝ ነው፡፡ የፌሮ ግሬድ የሚገለፀው ማለትም S-300, S-400, Fe -415 የምንለው ይሄንን ነው
.
Fyd ( design yield strength of reinforcement) = እንደ Fcd ሁሉ ጥርጣሬዎችን ለመቅረፍ fyd ላይ partial safety factor እንጠቀማለን፡፡ ለ class I እና Class II safety factor ይለያያል
.
Fctk (characteristic tensile strength of concrete) = ከ Split Cylinder test ወይም Flexure Test ላይ ካገኘናቸው ውጤቶች ውስጥ ካራክተርስቲክ ቴንሳይል እስትሬንግዝ ነው Fctk የምንለው፡፡ ይህንን ቴስት ማድረግ የማይቻልበት ሁኔታ ካለ ከ Fck ጋር የሚያገናኛቸው ፎርሙላ EBCS 2 ላይ ስላለ ያንን መጠቀም ይቻላል፡፡ Fctk የኮንክሪቱን ኮምፕረሲቭ እስትሬንግዝ ከ8 እስከ 15 ፐርሰንት ያክላል
.
Fctd (design tensile strength of concrete) = ለዲዛይን ሲባል fctk ላይ safety factor ሲደረግበት የምናገኘው ውጤት ነው፡፡ Fctd = fctk / f.s
.
.
#Fcd_Fyd_Fcu_Fck_C-25_S-400???
.
Fcu ( characteristic cubic compressive strength ) = ኪዩብ ቴስት አድርገን ካገኘናቸው ውጤቶች ውስጥ ካራክተርስቲክ እስትሬንግዝ ነው Fcu ማለት፡፡ የኮንክሪት ግሬድ የሚገለፀው በዚህ ነው፡፡ ለምሳሌ C-30 ማለት ካራክተርስቲክ compressive እስትሬንግዙ 30 Mpa ነው ማለት ነው እንጂ መሸከም የሚችለው ትልቅ ሎድ አይደለም ብዙ ሰዎች በዚህ ይሸወዳሉ፡፡ ካራክተርስቲክ እስትሬንግዝ ነው እንጂ አልቲሜት ሎድ ወይም አልቲሜት እስትሬንግዝ አይደለም፡፡
.
Fck ( characteristic cylindrical compressive strength) = ከ fcu የሚለያየው ነገር ይሆንን ውጤት የምናገኘው ሲሊንደሪካል ቴስት አድርገን ነው፡፡ እኛ ሃገር የተለመደው ኪዩብ ቴስት ነው - ኪዩብን ወደ ሲሊንደሪካል ኮምፕረሲቭ እስትሬንግዝ ለመቀየር fck = 0.8xfcu
.
Fcd (design strength of concrete) = fck እና fcu ላብራቶሪ ውስጥ የተገኙ ውጤቶች ናቸው ነው ነገር ግን በጥራት ችግር የተነሳ ሳይት ላይ ያንን እስትሬንግዝ ሙሉ ለሙሉ ማምጣት አስቸጋሪ ነው፡፡ ስለዚህም fck እና fcu በ Partial Safety Factor እናዳክማቸዋለን፡፡ [ fcd = 0.85fck/F.s ]……………. Design strength of concrete in compression 0.85 ያስገባንበት ምክንያት ቴስት ሳምፕሉ ከእውነተኛው የኮንክሪት እስትሬንግዝ ጋር ያለውን ልዩነት ግምት ውስጥ ለማስገባት ነው
.
Fyk (characteristic yield strength of reinforcement) = የብረቱ ካራክተርስቲክ እስትሬንግዝ ነው፡፡ የፌሮ ግሬድ የሚገለፀው ማለትም S-300, S-400, Fe -415 የምንለው ይሄንን ነው
.
Fyd ( design yield strength of reinforcement) = እንደ Fcd ሁሉ ጥርጣሬዎችን ለመቅረፍ fyd ላይ partial safety factor እንጠቀማለን፡፡ ለ class I እና Class II safety factor ይለያያል
.
Fctk (characteristic tensile strength of concrete) = ከ Split Cylinder test ወይም Flexure Test ላይ ካገኘናቸው ውጤቶች ውስጥ ካራክተርስቲክ ቴንሳይል እስትሬንግዝ ነው Fctk የምንለው፡፡ ይህንን ቴስት ማድረግ የማይቻልበት ሁኔታ ካለ ከ Fck ጋር የሚያገናኛቸው ፎርሙላ EBCS 2 ላይ ስላለ ያንን መጠቀም ይቻላል፡፡ Fctk የኮንክሪቱን ኮምፕረሲቭ እስትሬንግዝ ከ8 እስከ 15 ፐርሰንት ያክላል
.
Fctd (design tensile strength of concrete) = ለዲዛይን ሲባል fctk ላይ safety factor ሲደረግበት የምናገኘው ውጤት ነው፡፡ Fctd = fctk / f.s
.
.
.
.
Fcu ( characteristic cubic compressive strength ) = ኪዩብ ቴስት አድርገን ካገኘናቸው ውጤቶች ውስጥ ካራክተርስቲክ እስትሬንግዝ ነው Fcu ማለት፡፡ የኮንክሪት ግሬድ የሚገለፀው በዚህ ነው፡፡ ለምሳሌ C-30 ማለት ካራክተርስቲክ compressive እስትሬንግዙ 30 Mpa ነው ማለት ነው እንጂ መሸከም የሚችለው ትልቅ ሎድ አይደለም ብዙ ሰዎች በዚህ ይሸወዳሉ፡፡ ካራክተርስቲክ እስትሬንግዝ ነው እንጂ አልቲሜት ሎድ ወይም አልቲሜት እስትሬንግዝ አይደለም፡፡
.
Fck ( characteristic cylindrical compressive strength) = ከ fcu የሚለያየው ነገር ይሆንን ውጤት የምናገኘው ሲሊንደሪካል ቴስት አድርገን ነው፡፡ እኛ ሃገር የተለመደው ኪዩብ ቴስት ነው - ኪዩብን ወደ ሲሊንደሪካል ኮምፕረሲቭ እስትሬንግዝ ለመቀየር fck = 0.8xfcu
.
Fcd (design strength of concrete) = fck እና fcu ላብራቶሪ ውስጥ የተገኙ ውጤቶች ናቸው ነው ነገር ግን በጥራት ችግር የተነሳ ሳይት ላይ ያንን እስትሬንግዝ ሙሉ ለሙሉ ማምጣት አስቸጋሪ ነው፡፡ ስለዚህም fck እና fcu በ Partial Safety Factor እናዳክማቸዋለን፡፡ [ fcd = 0.85fck/F.s ]……………. Design strength of concrete in compression 0.85 ያስገባንበት ምክንያት ቴስት ሳምፕሉ ከእውነተኛው የኮንክሪት እስትሬንግዝ ጋር ያለውን ልዩነት ግምት ውስጥ ለማስገባት ነው
.
Fyk (characteristic yield strength of reinforcement) = የብረቱ ካራክተርስቲክ እስትሬንግዝ ነው፡፡ የፌሮ ግሬድ የሚገለፀው ማለትም S-300, S-400, Fe -415 የምንለው ይሄንን ነው
.
Fyd ( design yield strength of reinforcement) = እንደ Fcd ሁሉ ጥርጣሬዎችን ለመቅረፍ fyd ላይ partial safety factor እንጠቀማለን፡፡ ለ class I እና Class II safety factor ይለያያል
.
Fctk (characteristic tensile strength of concrete) = ከ Split Cylinder test ወይም Flexure Test ላይ ካገኘናቸው ውጤቶች ውስጥ ካራክተርስቲክ ቴንሳይል እስትሬንግዝ ነው Fctk የምንለው፡፡ ይህንን ቴስት ማድረግ የማይቻልበት ሁኔታ ካለ ከ Fck ጋር የሚያገናኛቸው ፎርሙላ EBCS 2 ላይ ስላለ ያንን መጠቀም ይቻላል፡፡ Fctk የኮንክሪቱን ኮምፕረሲቭ እስትሬንግዝ ከ8 እስከ 15 ፐርሰንት ያክላል
.
Fctd (design tensile strength of concrete) = ለዲዛይን ሲባል fctk ላይ safety factor ሲደረግበት የምናገኘው ውጤት ነው፡፡ Fctd = fctk / f.s
.
.
#Fcd_Fyd_Fcu_Fck_C-25_S-400???
.
Fcu ( characteristic cubic compressive strength ) = ኪዩብ ቴስት አድርገን ካገኘናቸው ውጤቶች ውስጥ ካራክተርስቲክ እስትሬንግዝ ነው Fcu ማለት፡፡ የኮንክሪት ግሬድ የሚገለፀው በዚህ ነው፡፡ ለምሳሌ C-30 ማለት ካራክተርስቲክ compressive እስትሬንግዙ 30 Mpa ነው ማለት ነው እንጂ መሸከም የሚችለው ትልቅ ሎድ አይደለም ብዙ ሰዎች በዚህ ይሸወዳሉ፡፡ ካራክተርስቲክ እስትሬንግዝ ነው እንጂ አልቲሜት ሎድ ወይም አልቲሜት እስትሬንግዝ አይደለም፡፡
.
Fck ( characteristic cylindrical compressive strength) = ከ fcu የሚለያየው ነገር ይሆንን ውጤት የምናገኘው ሲሊንደሪካል ቴስት አድርገን ነው፡፡ እኛ ሃገር የተለመደው ኪዩብ ቴስት ነው - ኪዩብን ወደ ሲሊንደሪካል ኮምፕረሲቭ እስትሬንግዝ ለመቀየር fck = 0.8xfcu
.
Fcd (design strength of concrete) = fck እና fcu ላብራቶሪ ውስጥ የተገኙ ውጤቶች ናቸው ነው ነገር ግን በጥራት ችግር የተነሳ ሳይት ላይ ያንን እስትሬንግዝ ሙሉ ለሙሉ ማምጣት አስቸጋሪ ነው፡፡ ስለዚህም fck እና fcu በ Partial Safety Factor እናዳክማቸዋለን፡፡ [ fcd = 0.85fck/F.s ]……………. Design strength of concrete in compression 0.85 ያስገባንበት ምክንያት ቴስት ሳምፕሉ ከእውነተኛው የኮንክሪት እስትሬንግዝ ጋር ያለውን ልዩነት ግምት ውስጥ ለማስገባት ነው
.
Fyk (characteristic yield strength of reinforcement) = የብረቱ ካራክተርስቲክ እስትሬንግዝ ነው፡፡ የፌሮ ግሬድ የሚገለፀው ማለትም S-300, S-400, Fe -415 የምንለው ይሄንን ነው
.
Fyd ( design yield strength of reinforcement) = እንደ Fcd ሁሉ ጥርጣሬዎችን ለመቅረፍ fyd ላይ partial safety factor እንጠቀማለን፡፡ ለ class I እና Class II safety factor ይለያያል
.
Fctk (characteristic tensile strength of concrete) = ከ Split Cylinder test ወይም Flexure Test ላይ ካገኘናቸው ውጤቶች ውስጥ ካራክተርስቲክ ቴንሳይል እስትሬንግዝ ነው Fctk የምንለው፡፡ ይህንን ቴስት ማድረግ የማይቻልበት ሁኔታ ካለ ከ Fck ጋር የሚያገናኛቸው ፎርሙላ EBCS 2 ላይ ስላለ ያንን መጠቀም ይቻላል፡፡ Fctk የኮንክሪቱን ኮምፕረሲቭ እስትሬንግዝ ከ8 እስከ 15 ፐርሰንት ያክላል
.
Fctd (design tensile strength of concrete) = ለዲዛይን ሲባል fctk ላይ safety factor ሲደረግበት የምናገኘው ውጤት ነው፡፡ Fctd = fctk / f.s
.
.
.
🤔1
ѕнєαя ƒαιℓυяє
👉shear failure is sudden and brittle failure. The failure is with diagonal cracks occuring some distance from the face of support.
👉on any given section shear and flexure occur at the same time( except point with either shear or moment is zero). The interaction of the two stresses, if the principle of stress transformation is followed, develop tension and shear at an angle different from 0 or 90°.
👉The diagonal tension resulting from interaction of shear and flexure is responsible for shear failure.
👉beams without shear reinforcement faile in one of the five modes:
☑️diagonal tension
☑️shear compression
☑️shear tension
☑️web crushing and
☑️arch rib failure.
👉The failure mode likely to occur depends on:
☑️moment to shear ratio( M/V),
☑️ type of loading(concentrated or distributed)
☑️beam cross section.
👉 concrete without shear reinforcement resists shear by the contribution of:
☑️concrete uncracked section,
☑️aggregate interlock and
☑️due to dowel action of longitudinal reinforcement.
👉shear failure is sudden and brittle failure. The failure is with diagonal cracks occuring some distance from the face of support.
👉on any given section shear and flexure occur at the same time( except point with either shear or moment is zero). The interaction of the two stresses, if the principle of stress transformation is followed, develop tension and shear at an angle different from 0 or 90°.
👉The diagonal tension resulting from interaction of shear and flexure is responsible for shear failure.
👉beams without shear reinforcement faile in one of the five modes:
☑️diagonal tension
☑️shear compression
☑️shear tension
☑️web crushing and
☑️arch rib failure.
👉The failure mode likely to occur depends on:
☑️moment to shear ratio( M/V),
☑️ type of loading(concentrated or distributed)
☑️beam cross section.
👉 concrete without shear reinforcement resists shear by the contribution of:
☑️concrete uncracked section,
☑️aggregate interlock and
☑️due to dowel action of longitudinal reinforcement.
❤1👍1
CONCRETE

Plain concrete, commonly known as concrete, is an intimate mixture of binding material, fine aggregate, coarse aggregate and water. This can be easily moulded to desired shape and size before it looses plasticity and hardens. Plain concrete is strong in compression but very weak in tension.
The tensile property is introduced in concrete by inducting different materials and this attempt has given rise to RCC, RBC, PSC, FRC, cellular concrete and Ferro cement. In this chapter proportioning, mixing, curing, properties, tests and uses of plain concrete is dealt in detail. The other improved versions of concrete are explained and their special properties and uses are pointed out.
PLAIN CONCRETE
Major ingredients of concrete are:
1. Binding material (like cement, lime, polymer)
2. Fine aggregate (sand)
3. Coarse aggregates (crushed stone, jelly)
4. Water.
A small quantity of admixtures like air entraining agents, waterproofing agents, workability agents etc. may also be added to impart special properties to the plain concrete mixture. Depending upon the proportion of ingredient, strength of concrete varies.
It is possible to determine the proportion of the ingredients for a particular strength by mix design procedure. In the absence of mix design the ingredients are proportioned as 1:1:2, 1:1 ½ :3, 1:2:4, 1:3:6 and 1:4:8, which is the ratio of weights of cement to sand to coarse aggregate. In proportioning of concrete it is kept in mind that voids in coarse aggregates are filled with sand and the voids in sand are filled with cement paste.
Proportion of cement, sand and coarse aggregates in concrete
1:1:2 For machine foundation, footings for steel columns and concreting under water.
1:1 ½ : 3 Water tanks, shells and folded plates, for other water retaining structures.
1:2:4 Commonly used for reinforced concrete works like beams, slabs, tunnel lining, bridges
1:3:6 Piers, abutments, concrete walls, sill of windows, floors.
1:4:8 Mass concretes like dam, foundation course for walls, for making concrete blocks.
Functions of Various Ingredients
Cement is the binding material. After addition of water it hydrates and binds aggregates and the surrounding surfaces like stone and bricks. Generally richer mix (with more cement) gives more strength. Setting time starts after 30 minutes and ends after 6 hours. Hence concrete should be laid in its mould before 30 minutes of mixing of water and should not be subjected to any external forces till final setting takes place.
Coarse aggregate consists of crushed stones. It should be well graded and the stones should be of igneous origin. They should be clean, sharp, angular and hard. They give mass to the concrete and prevent shrinkage of cement. Fine aggregate consists of river sand. It prevents shrinkage of cement.
When surrounded by cement it gains mobility enters the voids in coarse aggregates and binding of ingredients takes place. It adds density to concrete, since it fills the voids. Denser the concrete higher is its strength. Water used for making concrete should be clean. It activates the hydration of cement and forms plastic mass. As it sets completely concrete becomes hard mass.
Water gives workability to concrete which means water makes it possible to mix the concrete with ease and place it in final position. More the water better is the workability. However excess water reduces the strength of concrete. To achieve required workability and at the same time good strength a water cement ratio of 0.4 to 0.45 is used, in case of machine mixing and water cement ratio of 0.5 to 0.6 is used for hand mixing.
Preparing and Placing of Concrete
The following steps are involved in the concreting:
1. Batching
2. Mixing
3. Transporting and placing and
4. Compacting.
1. Batching:
The measurement of materials for making concrete is known as batching. The
following two methods of batching is practiced:
(a) Volume batching
(b) Weight batching.
(a) Volume Batching:
In this method cement, sand and concrete are batched by volume. A gauge box is made with wooden plates, its volum

Plain concrete, commonly known as concrete, is an intimate mixture of binding material, fine aggregate, coarse aggregate and water. This can be easily moulded to desired shape and size before it looses plasticity and hardens. Plain concrete is strong in compression but very weak in tension.
The tensile property is introduced in concrete by inducting different materials and this attempt has given rise to RCC, RBC, PSC, FRC, cellular concrete and Ferro cement. In this chapter proportioning, mixing, curing, properties, tests and uses of plain concrete is dealt in detail. The other improved versions of concrete are explained and their special properties and uses are pointed out.
PLAIN CONCRETE
Major ingredients of concrete are:
1. Binding material (like cement, lime, polymer)
2. Fine aggregate (sand)
3. Coarse aggregates (crushed stone, jelly)
4. Water.
A small quantity of admixtures like air entraining agents, waterproofing agents, workability agents etc. may also be added to impart special properties to the plain concrete mixture. Depending upon the proportion of ingredient, strength of concrete varies.
It is possible to determine the proportion of the ingredients for a particular strength by mix design procedure. In the absence of mix design the ingredients are proportioned as 1:1:2, 1:1 ½ :3, 1:2:4, 1:3:6 and 1:4:8, which is the ratio of weights of cement to sand to coarse aggregate. In proportioning of concrete it is kept in mind that voids in coarse aggregates are filled with sand and the voids in sand are filled with cement paste.
Proportion of cement, sand and coarse aggregates in concrete
1:1:2 For machine foundation, footings for steel columns and concreting under water.
1:1 ½ : 3 Water tanks, shells and folded plates, for other water retaining structures.
1:2:4 Commonly used for reinforced concrete works like beams, slabs, tunnel lining, bridges
1:3:6 Piers, abutments, concrete walls, sill of windows, floors.
1:4:8 Mass concretes like dam, foundation course for walls, for making concrete blocks.
Functions of Various Ingredients
Cement is the binding material. After addition of water it hydrates and binds aggregates and the surrounding surfaces like stone and bricks. Generally richer mix (with more cement) gives more strength. Setting time starts after 30 minutes and ends after 6 hours. Hence concrete should be laid in its mould before 30 minutes of mixing of water and should not be subjected to any external forces till final setting takes place.
Coarse aggregate consists of crushed stones. It should be well graded and the stones should be of igneous origin. They should be clean, sharp, angular and hard. They give mass to the concrete and prevent shrinkage of cement. Fine aggregate consists of river sand. It prevents shrinkage of cement.
When surrounded by cement it gains mobility enters the voids in coarse aggregates and binding of ingredients takes place. It adds density to concrete, since it fills the voids. Denser the concrete higher is its strength. Water used for making concrete should be clean. It activates the hydration of cement and forms plastic mass. As it sets completely concrete becomes hard mass.
Water gives workability to concrete which means water makes it possible to mix the concrete with ease and place it in final position. More the water better is the workability. However excess water reduces the strength of concrete. To achieve required workability and at the same time good strength a water cement ratio of 0.4 to 0.45 is used, in case of machine mixing and water cement ratio of 0.5 to 0.6 is used for hand mixing.
Preparing and Placing of Concrete
The following steps are involved in the concreting:
1. Batching
2. Mixing
3. Transporting and placing and
4. Compacting.
1. Batching:
The measurement of materials for making concrete is known as batching. The
following two methods of batching is practiced:
(a) Volume batching
(b) Weight batching.
(a) Volume Batching:
In this method cement, sand and concrete are batched by volume. A gauge box is made with wooden plates, its volum
👍2❤1
e being equal to that of one bag of cement. One bag of cement has volume of 35 litres. The required amount of sand and coarse aggregate is added by measuring on to the gauge box. The quantity of water required for making concrete is found after deciding water cement ratio.
For example, if water cement ratio is 0.5, for one bag of cement (50 kg), water required is 0.5 × 50 = 25 kg, which is equal to 25 litres. Suitable measure is used to select required quantity of water.Volume batching is not ideal method of batching. Wet sand has higher volume for the same weight of dry sand. It is called bulking of sand. Hence it upsets the calculated volume required.
(b) Weight Batching:
This is the recommended method of batching. A weighing platform is
used in the field to pick up correct proportion of sand and coarse aggregates. Large weigh batching plants have automatic weighing equipments.
2. Mixing:
To produce uniform and good concrete, it is necessary to mix cement, sand and
coarse aggregate, first in dry condition and then in wet condition after adding water.
The following methods are practiced:
(a) Hand Mixing
(b) Machine Mixing.
(a) Hand Mixing:
Required amount of coarse aggregate for a batch is weighed and is spread on an impervious platform. Then the sand required for the batch is spread over coarse aggregate. They are mixed in dry condition by overturning the mix with shovels. Then the cement required for the batch is spread over the dry mix and mixed by shovels. After uniform texture is observed water is added gradually and mixing is continued. Full amount of water is added and mixing is completed when uniform colour and consistency is observed. The process of mixing is completed in 6–8 minutes of adding water. This method of mixing is not very good but for small works it is commonly adopted.
(b) Machine Mixing:
In large and important works machine mixing is preferred. Required quantities if sand and coarse aggregates are placed in the drum of the mixer. 4 to 5 rotations are made for dry mixing and then required quantity of cement is added and dry mixing is made with another 4 to 5 rotations. Water is gradually added and drum is rotated for 2 to 3 minutes during which period it makes about 50 rotations. At this stage uniform and homogeneous mix is obtained.
3. Transporting and Placing of Concrete.
After mixing concrete should be transported to the
final position. In small works it is transported in iron pans from hand to hand of a set of workers. Wheelbarrow and hand carts also may be employed. In large scale concreting chutes and belt conveyors or pipes with pumps are employed. In transporting care should be taken to see that segregation of aggregate from matrix of cement do not take place.Concrete is placed on form works. The form works should be cleaned and properly oiled. If concrete is to be placed for foundation, the soil bed should be compacted well and is made free from loose soil.Concrete should be dropped on its final position as closely as possible. If it is dropped from a height, the coarse aggregates fall early and then mortar matrix. This segregation results into weaker concrete.
4. Compaction of Concrete:
In the process of placing concrete, air is entrapped. The entrapped air reduces the strength of concrete up to 30%. Hence it is necessary to remove this entrapped air. This is achieved by compacting the concrete after placing it in its final position. Compaction can be carried out either by hand or with the help of vibrators.
(a) Hand Compaction:
In this method concrete is compacted by ramming, tamping, spading or
by slicing with tools. In intricate portions a pointed steel rod of 16 mm diameter and about a metre long is used for poking the concrete.
(b) Compaction by Vibrators:
Concrete can be compacted by using high frequency vibrators.
Vibration reduces the friction between the particles and set the motion of particles. As a result entrapped air is removed and the concrete is compacted. The use of vibrators reduces the compaction time. When vibrators are used for compaction, water cement ratio can
For example, if water cement ratio is 0.5, for one bag of cement (50 kg), water required is 0.5 × 50 = 25 kg, which is equal to 25 litres. Suitable measure is used to select required quantity of water.Volume batching is not ideal method of batching. Wet sand has higher volume for the same weight of dry sand. It is called bulking of sand. Hence it upsets the calculated volume required.
(b) Weight Batching:
This is the recommended method of batching. A weighing platform is
used in the field to pick up correct proportion of sand and coarse aggregates. Large weigh batching plants have automatic weighing equipments.
2. Mixing:
To produce uniform and good concrete, it is necessary to mix cement, sand and
coarse aggregate, first in dry condition and then in wet condition after adding water.
The following methods are practiced:
(a) Hand Mixing
(b) Machine Mixing.
(a) Hand Mixing:
Required amount of coarse aggregate for a batch is weighed and is spread on an impervious platform. Then the sand required for the batch is spread over coarse aggregate. They are mixed in dry condition by overturning the mix with shovels. Then the cement required for the batch is spread over the dry mix and mixed by shovels. After uniform texture is observed water is added gradually and mixing is continued. Full amount of water is added and mixing is completed when uniform colour and consistency is observed. The process of mixing is completed in 6–8 minutes of adding water. This method of mixing is not very good but for small works it is commonly adopted.
(b) Machine Mixing:
In large and important works machine mixing is preferred. Required quantities if sand and coarse aggregates are placed in the drum of the mixer. 4 to 5 rotations are made for dry mixing and then required quantity of cement is added and dry mixing is made with another 4 to 5 rotations. Water is gradually added and drum is rotated for 2 to 3 minutes during which period it makes about 50 rotations. At this stage uniform and homogeneous mix is obtained.
3. Transporting and Placing of Concrete.
After mixing concrete should be transported to the
final position. In small works it is transported in iron pans from hand to hand of a set of workers. Wheelbarrow and hand carts also may be employed. In large scale concreting chutes and belt conveyors or pipes with pumps are employed. In transporting care should be taken to see that segregation of aggregate from matrix of cement do not take place.Concrete is placed on form works. The form works should be cleaned and properly oiled. If concrete is to be placed for foundation, the soil bed should be compacted well and is made free from loose soil.Concrete should be dropped on its final position as closely as possible. If it is dropped from a height, the coarse aggregates fall early and then mortar matrix. This segregation results into weaker concrete.
4. Compaction of Concrete:
In the process of placing concrete, air is entrapped. The entrapped air reduces the strength of concrete up to 30%. Hence it is necessary to remove this entrapped air. This is achieved by compacting the concrete after placing it in its final position. Compaction can be carried out either by hand or with the help of vibrators.
(a) Hand Compaction:
In this method concrete is compacted by ramming, tamping, spading or
by slicing with tools. In intricate portions a pointed steel rod of 16 mm diameter and about a metre long is used for poking the concrete.
(b) Compaction by Vibrators:
Concrete can be compacted by using high frequency vibrators.
Vibration reduces the friction between the particles and set the motion of particles. As a result entrapped air is removed and the concrete is compacted. The use of vibrators reduces the compaction time. When vibrators are used for compaction, water cement ratio can
👍2