👉ውድ የ ethio construction ተከታዮች እንዴት ናችሁ ዛሬ ደሞ ስለ ካራክተርስቲክ እስትሬንግዝ እና ካራክተርስቲክ ሎድ ምንድንነው ኣብረን እንይ።
.
➡Characteristic Strength-ማለት የኮንክሪት ወይም የብረት ቴስት አድርገን ለእያንዳንዱ ቴስት ካገኘናቸው ውጤቶች ውስጥ አምስት ፐርሰንቱን ብቻ የሚበልጥ ውጤት ነው ካ - እስትሬንግዝ ማለት፡፡ ወይም ደግሞ 95 ፐርሰንቱ የቴስት ውጤቶች የሚበልጡት ውጤት ነው፡፡ ትንሹ እስትሬንግዝ ነው ማለትይቻላል፡፡
⏩ፎርሙላውም- [ fc = (mean strength)- 1.64(standard
deviation) ]
.
➡Characteristic Load-ማለት ህንፃው በዘመኑ ያጋጥመዋል ተብሎ ከሚታሰበው ውስጥ አምስት ፐርሰንቱ ብቻ የሚበልጡት load ነው፡፡
⏩ፎርሙላውም - [ fk = (mean load) + 1.64(standard
deviation) ]
.
*ካራክተርስቲክ ሎዱንም ሆነ እስትሬንግዙን ስንወስድ በሁለቱም በኩል ህንፃው ሴፍ ነው:: ምክንያቱም እስትሬንግዙን ስንወስድ ህንፃው ትንሽዬ እስትሬንግዝ አለው ብለን ነው የምንወስደው...
*ሎድ ስንወስድ ደግሞ ለትልቁ ሎድ ነው የምንደዝነው..
ፐሮባብሊቲ ፓራሜትሮቹን ( ሚንና ስታንዳርድ ዲቭዬሽን) የምንወስደው ከቴስት ሪዛልቶች ውስጥ ነው፡፡
.
❤1
👉Today Tip
.
➡ በ አንድ ሜትር ካሬ ምን ያህል ብሎኬት እንጠቀማለን??
⏩የብሎኬት👇
▶ ስፋት =0.4ሜ
▶ቁመት =0.2ሜ
=1/(0.4*0.2)
=12.5
=~13
🚩ስለዚህ በ አንድ ሜትር ካሬ 13 ፍሬ ብሎኬት እንጠቀማለን ማለት ነው።
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
❤2
👉Today Tip 2
.
➡ Question - አንድ G+22 የሆነ ህንፃ እንዴት ነው ምንም አይነት Column ሳንጠቀም መገንባት የምንችለው??
.
➡Answer - Shear wall በመጠቀም
.
➡ Question - ከ36 ሚ.ሜ በላይ ለሆኑ ፌሮዎች ለምንድነው Lapping የማይፈቀደው??
.
➡Answer - ፌሮዎቹ ሳይዛቸው ትልልቅ ስለሆነ Lap ብናደርጋቸው ሎድ ትራንስፈር እንዲኖር ላፕ ሌንግዙ ረጅም መሆን አለበት በተጨማሪም ሁለቱን አንድ ላይ ማሰሪያ ትልቅ ዲያሜትር ያለው ፌሮ/ ሽቦ ያስፈልገናል - አስቸጋሪ ነው::
.
➡ Question - ሊፍቶች ውስጥ ለምንድነው መስታወት የሚገጠመው??
.
➡Answer - በግድግዳ የተከበበ በጣም ጠባብ ቤት ውስጥ ዝም ብለን ብንቆም ምን ይሰማናል??
ሊፍቶች ከጥበታቸው በተጨማሪ እንቅስቃሴ ስለሚያደርጉ ሰዎች ይሰጋሉ ምን አልባት አደጋ ከተከሰተ ፤ መብራት ከጠፋ l ምናምን ብለው - እናም ሰዎች ፀጉራቸውን እያስተካከሉ ፤ l ውበታቸውን እያደነቁ ምናምን ፈታ
እንዲሉና ሃሳባቸውን እንዲሰረቅ ነው ሊፍት ውስጥ መስታወት የሚገጠመዉ
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
👉10 key terms of Project management and schedule
you should know.
.
1. WBS (Work Breakdown Structure): Is hierarchical that breaks down the work into manageable clods so that each level of WBS could be easily understood by the project team.
.
2. Milestone:
These are the significant points in time or an event
that mark important moments during the project.
These are mainly used for
● Starting phase
● Ending phase
● Fixed dates on plan
.
3. Baseline:
Is used to measure the performance of the project.
There are three baselines in project management.
These are –
● Schedule baseline
● Cost baseline
● Scope baseline
4. Gantt Chart:
Is a bar chart that displays the scheduled
.
information graphically.
5. Critical Path Method (CPM) Critical Path Method (CPM) is a step by step approach in which one can analyze critical and non- critical tasks.
6. Dummy Activity:
dummy activity is a simulated activity of sorts, one that is of a zero duration.
.
7. Float:
Float, also called slack, is the amount of time a
task can slip before it bumps into another task.
8. Chart Dependencies:
.
the predecessor is the first task; it controls the start
or end date for all related successor tasks. The
successor, by contrast, is the task whose start or
end date is controlled by the predecessor.
.
9. Types of relationship:
■ Finish to Start: Predecessor must finish before Successor can start.
■ Start to Start:Predecessor must start before Successor can start.
■ Finish to Finish: Predecessor must finish before Successor can finish.
■ Start to Finish: Predecessor must start before Successor can finish.
.
10. Lead time and Lag time: Lead time causes the successor task to begin
before its predecessor task concludes.
Lag time causes the successor task to begin some time after its predecessor task concludes.
Sketch...ትጠላለህ
❤1
👉 CURING OF CONCRETE
.
▶Curing may be defined as the process of maintaining satisfactory moisture and temperature conditions for freshly placed concrete for some specified time for proper hardening of concrete. Curing in the early ages of concrete is more important.
👉Curing for 14 days is very important. Better to continue it for 7 to 14 days more.
👉 If curing is not done properly, the strength of concrete reduces. Cracks develop due shrinkage.
The durability of concrete structure reduces.
.
⏩The following curing methods are employed 👇
.
▶Spraying of water
▶Covering the surface with wet gunny bags, straw etc.
▶Steam curing and
Application of curing compounds.
▶Spraying of water: Walls, columns, plastered surfaces are cured by sprinkling water.
▶Wet covering the surface: Columns and other vertical surfaces may be cured by covering the surfaces with wet gunny bags or straw.
▶Ponding: The horizontal surfaces like slab and floors are cured by stagnating the water to a height of 25 to 50 mm by providing temporary small hounds with mortar.
▶ Steam curing: In the manufacture of pre-fabricated concrete units steam is passed over the
units kept in closed chambers. It accelerates curing process, resulting into the reduction of curing period.
👉 Application of curing compounds: Compounds like calcium chloride may be applied on the curing surface. The compound shows affinity to the moisture and retains it on the surface. It keeps the concrete surface wet for a long time.
👍1
👉What is WORKABILITY OF CONCRETE?

.
➡Workability can be defined as the property of fresh concrete which describes the ease and homogeneity of the concrete to be mixed, fully compacted and finished.
*A workable concrete
should possess following two requirements:👇
1. The concrete should be compacted with minimum efforts.
2. The concrete should not form bleeding and segregation.
*Workability of concrete mainly depends on the mix
proportion and the properties of concreting materials (water, cement,
aggregates).
*The shape, size, and grades of aggregates also
play a great role in the variation of workability. For
better workability fine and coarse aggregates should be well graded. It
has been found that concrete made of round grain sand is more
workable than the concrete of crushed sand. If air
entraining admixture is used in the mix, it will also increase the workability
and decrease segregation and bleeding.
⏩FACTORS AFFECTING WORKABILITY OF CONCRETE:
*The factors affecting workability are as following:
1. Amount Of Water In The Mix:
2. Proportion Of Coarse And Fine Aggregates:
Workability can be
increased by decreasing the amount of coarse
aggregates in the
mix. Fine aggregates produce more wore workable concrete.
3. Shape Of aggregates: Round shaped aggregates
give better workability than angular shaped aggregates.
4. By expanding the cement content in the mix.
5. By including admixtures in the mix. Apparently, the necessity of workability differs as per the nature of the job and blockage in the full stream of concrete due to the spacing and nature of the reinforcement. The
workability of concrete is generally measured by one of the following three
tests.👇
1. Slump Test.
2. Compaction Factor Test.
3. Vee-Bee Test.
👉what is Honeycombs
.
⏩Honeycombs are hollow spaces and cavities left in
concrete mass on surface or inside the concrete mass where concrete could not reach. These look like honey bees nest.
.
⏩Honeycombs which are on sides are visible to naked eyes and can be detected easily as soon shuttering is removed. Honey combs which are inside mass of concrete can only be detected by advanced techniques which we will discuss another time.
.
⏩There are many reasons for Honeycombs the main reasons are:👇
1) Improper vibration during concrete.
2) Less cover to reinforcement bars.
3) Use of very stiff concrete (this can be avoided by controlling water as per slump test).
4) Places like junction of beam to beam to column
and to one or more beams are the typical spots where honey combs are observed.
*This is due to jumbling of reinforcement of beams and column rods at one place; special attention is required at such place during concreting and vibrating.
5) Presence of more percentage of bigger size of aggregate in concrete also prevents concrete to fill narrow spaces between the reinforcement rods.
.
⏩Honeycombs as a
defect not only reduces the load bearing capacity
but water finds an easy way to reinforcement rods
and rusting and corrosion starts. Corrosion is a process which continues through reinforcement rods even in good concrete, this result in loosing grip between rods and concrete, which is very dangerous to safety and life of concrete structures.
👉 What is MORTAR
.
➡Mortar is an intimate mixture of binding material, fine aggregate and water.
➡When water is added to the dry mixture of binding material and the inert material, binding material develops the property that binds not only the inert material but also the surrounding stones and bricks.
➡If the cement is the binding material, then the mortar is known as cement mortar. Other mortars commonly used are lime mortar and mud mortar.
👉The inert material used is sand.
⏩In this channel,we will consider each of material used in mortars one by one just like the inert material sand and then the proportioning, mixing, curing, properties and uses of different mortars is going to be explained be stay tuned Next Post.
.
▶USES OF CEMENT MORTAR
👉Mortar is used 👇
*to bind masonry units like stone, bricks, cement blocks.
*to plaster slab and walls make them impervious.
* to give neat finishing to walls and concrete works.
*for pointing masonry joints.
*for preparing building blocks.
* as a filler material in ferro cement works.
*to fill joints and cracks in walls.
*as a filler material in stone masonry ...
👉MAN POWER(LABOUR) WORK IN THE SITE WITH THEIR FUNCTION
.
▶Mason=to work masonry world
.
▶forman=the right hand than work the site for the execution.
.
▶site Engineer=control all activity in the effort
.
▶Office Engineer=paper payment,take off and report
.
▶Store keeper = to control the materials in the store
.
▶chisseler = a person who works chisel work for the electrical installation.
.
▶carpenter = a person works form works
.
▶plasterer = work plastering works .
.
▶data collector = to collect data in the site .
. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
👍2❤1
👉FIELD TESTS FOR AGGREGATE
.
1. SURFACE MOISTURE CONTENT & ABSORPTION
*The surface moisture in the aggregate, influences the water cement ratio, strength and durability of the mix.
To determine the surface moisture of moist or wet aggregate, method is as follows- FRYING PAN METHOD
*The following apparatus are required:
A frying pan or metal tray,
Gas stove or an electric hair dryer, A metal or glass stirring rod and Scales to measures. The following procedure is followed during the test
1. For coarse aggregate 2 kg sample is adequate and for fine aggregate 0.5 kg sample is adequate.
2. The wet/moist sample is then weighed wet weight (W)
3. Heated very gently on the frying pan or metal plate and stirred with a glass or metallic rod to maintain uniform distribution of heat, until the sheen disappears from the surface.
*The fine aggregates become surface dry when
it just starts showing free flowing characteristics.
4. The aggregates is then cooled and reweighed. The
surface dry aggregate weight (W ) is noted. The
surface moisture is then calculated as follows-
Surface moisture = [(W – W ) / W ] x 100%
5. Overheating must be avoided, as it will not give the correct surface moisture .
6. If heating is continued either on the fry pan or in the oven till the aggregate is bone dry aggregate weight is then noted (Wbd) after continuous heating. The absorption (absorbed water content) is then calculated as follows-
Absorption = [(W – W ) / W ] x 100%
Similarly, if the dry aggregates are received on site and absorption capacity is to be determined then the aggregates are first soaked in water and then the above methods are
deployed to determine the absorption capacity of
aggregates.
⏩TYPES OF PIPES COMMONLY USED IN WATER SUPPLY SYSTEM
⭕
▶TYPES OF PIPES:
The types of pipes commonly used in water
distribution system are described below.
.
⭕1. CAST IRON PIPES:
.
Cast iron pipes or CI pipes are broadly utilized for distribution of water because they are less
expensive, corrosion resistant, and long lasting.
CI pipes are mainly produced by following four techniques.
.
1. Horizontally cast ( MC ware pipes)
2. Vertically cast ( Pit cast in sand molds)
3. Centrifugally cast in sand lines molds spun
type.
4. Centrifugally cast in water cooled molds.

Uses of horizontally cast CI pipes are presently pretty much outdated, that’s why they are infrequently produced these days. Centrifugally cast pipes are most widely used because they have more grained dense structure and uniform thickness. Generally, CI pipes are 3-6 m long, so much heavy, and require extra care to avoid from damaging while transporting and creating connections.
.
⭕2. STEEL PIPES:
.
Steel pipes are utilized in water mains circumstances where the pipes are going through very high pressure ( More than 7 kg/cm2) and required large diameter pipes. These pipes have greater strength and less weight than CI pipes. Satisfactory treatments should be given to maintain antagonistic climatic conditions.
.
⭕3. GALVANIZED IRON PIPES:
.
Galvanized pipes are also known as GI pipes are fashioned steel pipes with zinc coating. GI pipes are mostly utilized for water supply and service connections.
.
⭕4. COPPER PIPES:
.
Copper pipes are most commonly utilized in hot water supply establishment. Some features of
this pipes are as following:
1. They possess high tensile strength.
2. They can be bent easily.
3. Copper pipes can be used in thin wall. Copper pipes are sometimes chromium plated to enhance their appearance and to match with the chromium plated water supply fittings.
.
⭕5. POLYTHENE PIPES:
.
Polythene and PVC pipes are being utilized progressively nowadays for cold water supply inside and outside works. These pipes are lightweight, cheaper, corrosion resistant, and require no threading for making any connections.

Besides these, there are other pipes commonly used for water distribution such as :

asbestos cement (AC) pipes,

reinforced concrete (RCC) pipes,

prestressed reinforced concrete (PSC) pipes etc.
.
The selection of the types of pipe for utilizing any purposes is adopted according to the design criteria, material availability, cost, and other comparative variables.
.
🔵⭕🔵 Thank you 🔵⭕🔵
🚩የ ዲዛይን ግዜ
.
👉አራት መአዘን ቅርፅ ያለው ለአነስተኛ ቤተሰብ የሚውል የውሃ ታንከር ዲዛይን እናርግ...
.
ዲዛይን ከማረጋችን በፊት ስለውሃ ምናልባትም ያልሳማችሁትን እውነታዎች ልጥቀስላችሁ
.
1)የሰውነታችን ሰባ ፐርሰንቱ (70%) ውሃ ነው። ይህ ቁጥር አዲስ ለተወለደ ህፃን ከፍ ይላል።
አዲስ የተወለደ ህፃን ሰውነት 80% ውሃ ነው።
.
2)አንድ ጤነኛ ሰው በቀን እስከ 3 gallon ውሃ ሊጠጣ ይችላል
.
3)በጣም ተጠምታችሁ ታውቃላችሁ? ይህ ከምን የመነጪ ይመስላችኋል በጣም የተጠማችሁት ሰውነታችሁ ውስጥ ያለው የውሃ መጠን በ 1% ሲቀንስ ነው።

4)በአንድ ግዜ ብዙ መጠን ያለው ውሃ መጠጣት ለ"ውሃ ስካር" (water intoxication ) ይዳርጋል።
ብዙ ውሃ ስንጠጣ ውሃ በደማችን ውስጥ የሚገኘውን ሶድየም መጠን በማሟሟት በአእምሮዋችን የሚገኘውን የውሃ መጠን እንዳይመጣጠን ያደርጋል ይህ ደሞ እራስን እስከመሳት ሊያደርስ ይችላል። ሲጠጡ መጠንዎን አይለፉ ውሃም ቢሆን :D
.
5)በቀን ልንጠጣው የሚገባው (recommended) የውሃ መጠን 8 ብርጭቆ ነው።
እንደ አለማቀፋዊው የIS ኮድ አንድ ሰው በቀን ውስጥ ለተለያየ አገልግሎቶች የሚጠቀመው የውሃ መጠን 135 liter ነው።
ይህ ኮድ
*ለመጠጥ - 5 ሊትር
*ለማብሰል- 5 ሊትር
*ለመታጠብ እና ፍሳሽ ለማስወገድ - 85 ሊትረ
*ልብስ እና እቃዎችን ለማጠብ - 30 ሊትር
*ቤት ለማፅዳት - 30 ሊትር ውሃ መጠቀም እንዳለብን ይጠቁማል።
.
▶ይህን የIS ኮድ ይዘን 4 አባላት ላሉት አንድ ቤተሰብ እንደ Hydraulic ኢንጂንየርነታችን አራት መአዘን ቅርፅ ያለው የውሃ ታንከር ዲዛይን እናርግ።
.
4 አባላት (ሰዎች) ላሉት የቤተሰብ አባል ተፈላጊ የውሃ መጠን በliter
135×4 = 650 liter (ለአንድ ሰው በቀን 135 liter )
የውሃ ታንከሩን መጠን ለማወቅ ከርዝመቱ (length ) ከየጎን ስፋት (width ) እና ከቁመቱ/ጥልቀቱ( depth) አንዱን ማወቅ አለብን ።
▶ከ Volume ቀመር እንደምንረዳው
1cu.m = 1000liters
1liter = 0.001 cu.m ነው ስለዚህ
650liter = 0.65 cu.m
.
የታንከራችንን ቁመት 0.6m ብናደርገው የታንከራችን ስፋት (area ) እንዲ ማግኘት እንችላለን
Area= 0.65÷0.6 = 1.083 sq.m ስፋት (area) ማለት ርዝመት (length) ሲባዛ የጎን ስፋት (width) ይሆናል ። ይህም
A=L×W= 1.083 sq.m
በ IS ተጠቃሽ (recommended) የርዝመት መጠን ከሁለት እጥፍ የጎን ርዝመት መጠን ጋር እኩል ነው ።
ይህም L= 2W
L×W=1.083 sq.m
2W×W = 1.083 sq.m
B^2 = 0.054 sq.m
B= 0.74
L= 2×0.74 = 1.48 m
.
▶ስለዚህ 650 liter የሚይዝ ታንከር ፦
ርዝመት (L) =1.48m
የጎን ርዝመት (W) = 0.74m
ቁመት/ጥልቀት= 0.6 m ይሆናል ማለት ነው ። ልንረሳው ማይገባ ነገር ለታንከሩ free flow provide ማረግ አለብን [125mm free flow ]
.
❤1👍1
👉 TYPES OF BUILDINGS:
.
▶Depending upon the character of occupancy or the type of use, building can be classified into different categories as follows:👇
1. RESIDENTIAL BUILDINGS:
These buildings include one or two private dwellings, apartment
houses (flats), hotels, dormitories etc.
.
2. EDUCATIONAL BUILDINGS:
These buildings include any building used for school, college or day
care purposes involving assembly for instruction, education or recreation.
.
3. INSTITUTIONAL BUILDINGS:
These buildings include any building or part which is used for medical treatment etc. Such as Hospitals, nursing homes,
orphanages, sanatoria, jails, prisons, mental hospitals etc.
.
4. ASSEMBLY BUILDINGS:
These buildings may include any building or part of a building where a group of people gathers for recreation, amusement, social, religious or such types of purposes such as theaters, assembly
halls, exhibition halls, restaurants, museum, club rooms, auditoria etc.
.
5. BUSINESS BUILDINGS:
These shall include any building or part of a building which is used for business transactions, keeping records of accounts, town halls,
city halls, court houses etc.
.
6. MERCANTILE BUILDINGS:
These shall include those buildings which are used for soap, market, stores, wholesale or retail.
.
7. INDUSTRIAL BUILDINGS:
This types of building mainly used for manufacturing purposes.
Here products or materials of all kinds and properties are fabricated, assembled or processed, for example, gas plants, refineries, mills, dairies etc.
.
8. STORAGE BUILDINGS:
These buildings are generally used for the storage or sheltering of
goods, wares, or merchandise like warehouses, cold storages,
garages, stables, transit sheds etc.
.
9. HAZARDOUS BUILDINGS:
These buildings include any building which is used for storage, handling, manufacture or processing of highly combustible
explosive materials or products which are liable to burn with extreme rapidly which may produce poisonous fumes, building
which is used for storage, handling or manufacturing highly corrosive, toxic, acid or other liquids or chemicals producing flame, fumes explosive etc.
. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
❤1👍1
Design Step 1: depth from deflection( deformation) control

👉Since C30/37 concrete is used the limiting span to depth ratio from table 7.4 N Is 14 ( the beam is assumed to be highly stressed with ρ=1.5 %).

👉The limiting depth to prevent excessive deformation is:

👉d=le/14 ....where le is effective length of beam.

👉d=6000 mm/14=428.57 mm

Design step 2:- cover to reinforcement

👉Exposure class is assumed to be XC 1 and the value of Cmin,dur becomes 15 mm.

👉 for separate bar, the value of Cmin,b is equals to the diameter of bar( φ). Assuming φ=20 mm, and Cmin,b=20 mm.

➡️Cₘᵢₙ= max {Cₘᵢₙ,b ; Cₘᵢₙ,dᵤᵣ; 10 mm }

➡️Cₘᵢₙ=max{20 mm,15 mm, 10 mm}

➡️Cₘᵢₙ=20 mm

And the nominal cover becomes

➡️Cnom=Cmin+10=20+10=30 mm cover.

Design step 3:- overall depth

For stirrup assume 8 mm bars.

👉D=d+cover +φₛ+φₗ/2

👉D=428.57mm+30mm+8+20/2=476.57 mm

For ease of construction take D=500 mm ( nearest 50 ).

Design step 4:- Load calculation

Dead load
👉 self weight of beam
Unit weight of concrete(γ)= 25 KN/m³
Weight per meter:-
➡️γ*b*D
➡️25*0.25 *0.5=3.125 KN/m
👉 total dead load

Superimposed+self weight=10KN/m+3.125 KN/m=13.125 KN/M.

Design Load

Pd=1.35Gk+1.5Qk
Pd=1.35*13.125+1.5*8=29.72 KN/m.
❤1
Design step 5:-design strength of material

Concrete(fcd)

👉fcd=αcc*fck/γc

👉for C30/37 concrete fck is 30 Mpa.

👉αcc=0.85

👉γc=1.5

👉fcd=(0.85*30/1.5)=17 Mpa

Steel (fyd)

👉fyd=fyk/γs

👉γs=1.15

👉fyd=500/1.15=434.78 Mpa

Design step 6:- design moment calculation

👉 for simply supported beam the maximum moment occurs at mid span and it's vale is

➡️Mmax=Msd=Pd*L²/8

➡️Mmax=Msd=(29.72)*(6²)/8=133.73 KN-m

Design step 6:- check depth for flexure

👉effective depth of beam in order to be singly reinforced is calculated from

✓d=sqrt(Msd/(μsd*fcd*b))

✓Sqrt...[square root of ]
For zero percent redistribution of moment the limiting μsd is 0.295.

d=sqrt({133.73*10⁶}/{0.295*17*250})=326.59 mm

And the provided effective depth:

d= 500 - 30 - 8 - 20/2 = 452 mm

Since the provided depth is greater than calculated from flexure, depth is ok!

Design step 7:- Reinforcement calculation

Using design chart method

✓μsd={Msd*10⁶}/{fcd*b*d²)

✓μsd={133.73*10⁶}/{17*250*452²}=0.154 <0.295 ok!

from design chart the value of kz is

✓kz=0.92

and z( moment arm , the distance between Cc and Ts)

✓Z=kz*d=0.92*452=415.84 mm

Now the amount of reinforcement

✓As={Msd}/{Z*fyd}

✓As={133.73*10⁶}/{415.84*434.77}=739.65 mm²
.
Design step 8:- check for minimum and maximum longitudinal reinforcement

Minimum reinforcement

✅As,min=0.26{fctm/fyk}bt*d. ( ES EN 1992-1-1:2015 equation 9.1 N)

✅From table 3.1 of ES EN 1992-1-1:2015 the value of fctm for C30/37 concrete is 2.9 Mpa.

👉As,min=0.26*{2.6/500}*250*452=152.776 mm²

👉As> As,min....provide As

Maximum reinforcement

ES EN 1992-1-1:2015 Article 9.2.1.1[3] " the cross sectional area of tension or compression reinforcement should not exceed 0.04Ac" and the national annex recommends the same value.

As,max=0.04*250*500=5000 mm²

As< As,max.....ok!

Design step 9:- calculate the number of bars

👉# of bars=As/as

Where
👉As calculated area of reinforcement

👉as is the area of one bar

👉as=(πφ²/4)=(π*20²/4)≈314 mm²

of bar=(739.65/314)=2.355≈3

🚩provide 3φ20 bars
.
... Finally 👇
👍1
👉 beam section detail

➡ All dimensions are in centimetres

➡ The two bars at the top are nominal reinforcement to hang the stirrups( the blue lines).
.
👏THANK YOU
👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆👆solution 👉ውድ ቤተሰቦች ለ ዛሬ ደሞ Beam design ኣዘጋጅተናል👇👇👇
.
✳️ Beam design( flexure) example according to ES EN 1992-1-1: 2015

➡️ Material Data

Concrete grade:- C30/37(fck=30 Mpa).

Steel grade:- S500 ( fyk=500 Mpa).

➡️ Beam geometry

Type:- Simply supported beam

Effective length of beam:- 6 m.

Beam width(b):- 250 mm.

➡️ Load

Dead load(Gk):- self weight of Beam plus 10 KN/m super imposed load.

Live Load(Qk):- 8 KN/m

Depth is not limited by any requirement( singly reinforced beam is possible).
👆👆👆👆👆👆👆👆👆solution !!!