Forwarded from SMH General Construction
👉ውድ የEthio construction ቤተሰቦች
.
▶️ይህ ቻናላቹ ለ እናንተ ተማሪዎች እና ባለሞያዎች ጠቃሚ የ ኮንስትራክሽን ሌክቸር ኖቶች እና የተመረጡ መፅሃፍቶች በማስተላለፍ እንዲሁም እርሰበርሳችን እየተማማርን እንዳለን ይታወቃል ከታች ያለዉን link በcivil ,cotm class group laye share በመረግ ከኛ ጋር መሆናቸውን አሳዩን
.
▶️ይህ ቻናላቹ ለ እናንተ ተማሪዎች እና ባለሞያዎች ጠቃሚ የ ኮንስትራክሽን ሌክቸር ኖቶች እና የተመረጡ መፅሃፍቶች በማስተላለፍ እንዲሁም እርሰበርሳችን እየተማማርን እንዳለን ይታወቃል ከታች ያለዉን link በcivil ,cotm class group laye share በመረግ ከኛ ጋር መሆናቸውን አሳዩን
👉እዚሁ Online ሁነው Construction መረጃ እና ትምህርታው note ማግኝት ይፈልጋሉ? @civil_Cotm_eng እንግዲያውስ ለ Civil፣Architecture እና COTM ተማሪዎች እና ባለሙያዎች በ ሙሉ በ አማርኛ እና ኢንግሊዘኛ የ ሌክቸር ትምርቶች፣ሶፍትዌሮችና ሴታፖችን እንዲሁም ጠቃሚ የ ኮንስትራክሽን እውቀቶች ለማግኝት ወደ ቻናላችን ይቀላቀሉ።
@civil_Cotm_eng
እናመሰግናለን።Ethio construction‼️💚💛❤️ የኛ የሁላችን
@civil_Cotm_eng
እናመሰግናለን።Ethio construction‼️💚💛❤️ የኛ የሁላችን
Forwarded from SMH General Construction (Pr (Ethio))
Ethio construction - @civil_Cotm_eng
👉 Types-of-Cracks-in-Concrete-Columns-
👉 Types-of-Cracks-in-Concrete-Columns-
Forwarded from SMH General Construction
👉What is standard box size?
.
▶width*length*depth
.
1. 40*50*20cm (mostly for cement mortar)
2. 40*50*18cm (for C-25 concrete)
3. 40*50*16cm (for C-30 concrete)
4. 40*50*14cm (for C-40 concrete but depend on mix design )
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
.
▶width*length*depth
.
1. 40*50*20cm (mostly for cement mortar)
2. 40*50*18cm (for C-25 concrete)
3. 40*50*16cm (for C-30 concrete)
4. 40*50*14cm (for C-40 concrete but depend on mix design )
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
If concrete compression test fails, should Schmidt
hammer test be adopted as an
alternative test to prove the concrete strength?
@civil_Cotm_eng
The Scmidt hammer test is based on the elastic
rebound of hammer which presses on
concrete surface and it measures the surface
hardness of concrete. Since the test is very
sensitive to the presence of aggregates and voids at
the concrete surface, it is necessary to
take more than 10 readings over the area of test.
@civil_Cotm_eng
However, it should be noted that Schmidt hammer test measures surface hardness only but not
the strength of concrete. Therefore, it
may not be considered a good substitute for concrete
compression test.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
hammer test be adopted as an
alternative test to prove the concrete strength?
@civil_Cotm_eng
The Scmidt hammer test is based on the elastic
rebound of hammer which presses on
concrete surface and it measures the surface
hardness of concrete. Since the test is very
sensitive to the presence of aggregates and voids at
the concrete surface, it is necessary to
take more than 10 readings over the area of test.
@civil_Cotm_eng
However, it should be noted that Schmidt hammer test measures surface hardness only but not
the strength of concrete. Therefore, it
may not be considered a good substitute for concrete
compression test.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
✅Function of foundation
@civil_Cotm_eng
➡️foundation distribute loads of super structure to large area so that the intensity of load at its base less than bearing capacity of subsoil.
➡️foundation also provide the level surface for the masonry work of which the superstructure can be built.
➡️foundation gives the lateral stability of the building against natural disturbances( wind, earthquake etc...)
➡️ foundation protects the structure against soil movements.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
@civil_Cotm_eng
➡️foundation distribute loads of super structure to large area so that the intensity of load at its base less than bearing capacity of subsoil.
➡️foundation also provide the level surface for the masonry work of which the superstructure can be built.
➡️foundation gives the lateral stability of the building against natural disturbances( wind, earthquake etc...)
➡️ foundation protects the structure against soil movements.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
Which type of bar reinforcement is more
corrosion resistant, epoxy-coated bars,
stainless steel bars or galvanized bars?
@civil_Cotm_eng
Based on the experiment conducted by the Building
Research Establishment, it was shown that the corrosion resistance of galvanized steel was
the worst among the three types of bar
reinforcement. For galvanized steel bars, corrosion
started to occur when a certain chloride
content in concrete (i.e. 0.4% by cement weight) was
exceeded. However, for epoxy-coated
bars, they extended the time taken for cracking to
occur when compared with galvanized
steel bars.
The best corrosion resistant reinforcement among all
is stainless steel. In particular,
austenitic stainless steel stayed uncorroded even
there was chloride contamination in
concrete in the experiment.
.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
corrosion resistant, epoxy-coated bars,
stainless steel bars or galvanized bars?
@civil_Cotm_eng
Based on the experiment conducted by the Building
Research Establishment, it was shown that the corrosion resistance of galvanized steel was
the worst among the three types of bar
reinforcement. For galvanized steel bars, corrosion
started to occur when a certain chloride
content in concrete (i.e. 0.4% by cement weight) was
exceeded. However, for epoxy-coated
bars, they extended the time taken for cracking to
occur when compared with galvanized
steel bars.
The best corrosion resistant reinforcement among all
is stainless steel. In particular,
austenitic stainless steel stayed uncorroded even
there was chloride contamination in
concrete in the experiment.
.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
For long slender structures like beams, propping
is required after removal of
formwork. Why?
@civil_Cotm_eng
After concreting, the time at which striking of
formworks should not be too long, otherwise
it would affect the colour of concreted structures. For
long span concrete structures, when
they have attained sufficient strength to support their
self-weight, creep deflection may
occur in these structures if propping is not provided
after the removal of formwork.
Therefore, re-propping is carried out after removing
formwork and these props should not
be allowed to stand too long because creep loads may
overstress them.
Note: Propping refers to provision of falsework to
support slabs and beams during their gain in
concrete
strength after concreting.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
is required after removal of
formwork. Why?
@civil_Cotm_eng
After concreting, the time at which striking of
formworks should not be too long, otherwise
it would affect the colour of concreted structures. For
long span concrete structures, when
they have attained sufficient strength to support their
self-weight, creep deflection may
occur in these structures if propping is not provided
after the removal of formwork.
Therefore, re-propping is carried out after removing
formwork and these props should not
be allowed to stand too long because creep loads may
overstress them.
Note: Propping refers to provision of falsework to
support slabs and beams during their gain in
concrete
strength after concreting.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
👉Staircase Design Princip
@civil_Cotm_eng
▶️A staircase is an integral part of a building. It is a series of steps arranged in an order so that people can go from one floor of a building to another . The stair should be as per standard design principles and constructed in a such a manner that people can negotiate the steps with ease.
.
▶️Staircase
.
▶️A staircase is an integral part of a building; residence, office or public utility. It is designed and built according to the local building codes. A staircase may be straight, circular, flared or spiral. Ergonomic design principles are to be followed in the planning and construction of stairs to avoid inconvenience to the users as well as to avoid accidents.
.
▶️Staircase Design Principles
.
▶️Stairs are a series of steps arranged in an order to provide access from one floor of a building to another floor. They should be provided in a convenient location of the building. In case of a multistory building, though elevators will be there for the normal movement from one floor to another, stairs are a must for emergency exit in case of fire or other calamities.
.
▶️Technical Terms
. @civil_Cotm_eng
👉The following are the technical terms associated with a stair.
1. Step: The portion of the stair where the foot lands during ascending/descending.
2. Tread: The horizontal portion of a step.
3. Riser: The vertical portion of a step.
4. Stringer: The inclined member which supports the steps.
5. Landing: It is the horizontal platform provided at the end of each flight.
6. Pitch: It is the slope of the stair.
7. Railing: It is the inclined member of a stair which is to support the hand.
8. while descending or ascending.
9. Baluster: It is the vertical intermediate support of the hand-rail.
▶️Characteristics of a Good Stair
👉 The following are the characteristics of a good stair.
10. It should have easy access from all sides of the building
11. It should be well ventilated
12. It should have wide landing at end of each flight
13. Normally there should not be more than 12 steps in a flight.
14. The rise and go of the steps should be so proportioned that the ascending and descending of the flight is easy.
15. Handrail must be provided at least on one side of the stair
16. The inclination of the stair should be between 30 to 45 degrees.
▶️Types of Stairs
.
👉The different types of stairs are:
.
*Straight stairs
*Quarter-turn stairs
*Dog-legged stairs
*Open-newel stairs
*Circular stairs
*Bifurcated stairs
*Geometrical stairs
*Spiral stairs
*Construction of Stairs
:
👉Stairs are constructed with any of the following materials.
.
▶️Brick masonry, Stone masonry, Timber, Steel, Reinforced Cement Concrete
.
▶️Summary of Staircase Design Principles
17. Type of Stair: The type of stair depends on the type of building, availability of space and the purpose of stair.
18. Rise and Going: The standard rise and tread is 15 x 25 cm. However the dimensions can be changed depending on the actual site conditions.
19. Number of rises: The number of rises is equal to the total height of the room divided by one rise.
20. Number of threads: This is equal to number of rises minus one.
@civil_Cotm_eng
▶️A staircase is an integral part of a building. It is a series of steps arranged in an order so that people can go from one floor of a building to another . The stair should be as per standard design principles and constructed in a such a manner that people can negotiate the steps with ease.
.
▶️Staircase
.
▶️A staircase is an integral part of a building; residence, office or public utility. It is designed and built according to the local building codes. A staircase may be straight, circular, flared or spiral. Ergonomic design principles are to be followed in the planning and construction of stairs to avoid inconvenience to the users as well as to avoid accidents.
.
▶️Staircase Design Principles
.
▶️Stairs are a series of steps arranged in an order to provide access from one floor of a building to another floor. They should be provided in a convenient location of the building. In case of a multistory building, though elevators will be there for the normal movement from one floor to another, stairs are a must for emergency exit in case of fire or other calamities.
.
▶️Technical Terms
. @civil_Cotm_eng
👉The following are the technical terms associated with a stair.
1. Step: The portion of the stair where the foot lands during ascending/descending.
2. Tread: The horizontal portion of a step.
3. Riser: The vertical portion of a step.
4. Stringer: The inclined member which supports the steps.
5. Landing: It is the horizontal platform provided at the end of each flight.
6. Pitch: It is the slope of the stair.
7. Railing: It is the inclined member of a stair which is to support the hand.
8. while descending or ascending.
9. Baluster: It is the vertical intermediate support of the hand-rail.
▶️Characteristics of a Good Stair
👉 The following are the characteristics of a good stair.
10. It should have easy access from all sides of the building
11. It should be well ventilated
12. It should have wide landing at end of each flight
13. Normally there should not be more than 12 steps in a flight.
14. The rise and go of the steps should be so proportioned that the ascending and descending of the flight is easy.
15. Handrail must be provided at least on one side of the stair
16. The inclination of the stair should be between 30 to 45 degrees.
▶️Types of Stairs
.
👉The different types of stairs are:
.
*Straight stairs
*Quarter-turn stairs
*Dog-legged stairs
*Open-newel stairs
*Circular stairs
*Bifurcated stairs
*Geometrical stairs
*Spiral stairs
*Construction of Stairs
:
👉Stairs are constructed with any of the following materials.
.
▶️Brick masonry, Stone masonry, Timber, Steel, Reinforced Cement Concrete
.
▶️Summary of Staircase Design Principles
17. Type of Stair: The type of stair depends on the type of building, availability of space and the purpose of stair.
18. Rise and Going: The standard rise and tread is 15 x 25 cm. However the dimensions can be changed depending on the actual site conditions.
19. Number of rises: The number of rises is equal to the total height of the room divided by one rise.
20. Number of threads: This is equal to number of rises minus one.
👍1
👉የ ዕለተ ዕሁድ ጠቃሚ ጉርሻ ከ @civil_Cotm_eng
.
▶️የፕረዘንቴሽን ፍርሀትን እንዴት ማስወገድ እንችላለን?
.
✍ፕረዘንቴሽን በትምህርት ሂወታችን ውስጥ ከሚያጋጥሙን ሂደቶችና የመፈተኛ መንገዶች ውስጥ አንዱ ነው፡፡
*በተለይ በከፍተኛ ትምህርት ላይ መምህራን አሳሳይንመንቶችን ፣ ፕሮጀክቶችን ፣ የምርምር ስራዎችን እና የመሳሰሉትን ተማሪዎች በክላስ ውስጥ ፕረዘንት እንዲያደርጉ ይጠይቃሉ፡፡
*ከትምህርት አለም ውጪም በተለያዮ የስራ ጉዳዮች ላይ ፕረዘንት እንድናደርግ ሊጠበቅብን ይችላል፡፡
*ታዲያ በፕረዘንቴሽን ጊዜ የብዙዎች ችግር ፍርሀት ነው፡፡ ሰው ፊት ቆሞ የመናገር ፍርሀት፡፡
*የፕረዘንቴሽን ፍርሀት የብዙ ሰዎች ችግር ነው፡፡ ጥናቶች እንደሚጠቁሙት እስከ 80 % የሚሆኑትን ሰዎች ጋር ያለ ችግር ነው፡፡ በእርግጥ ችግር ነው ተብሎም ሊነሳም አይችል ይሆናል፡፡ ምክንያቱም መምህራንን ጨምሮ የ public speaking ልምድ ያላቸው አርቲስቶች፣ ፓለቲከኞች፣ የሀይማኖት መሪዎች ሁሉ የሚጋሩት common ስሜት ስለሆነ ነው፡፡
*ይህ የፕረዘንቴሽን (public speaking) ፍርሀት ጤናማ ስሜት ነው፡፡ የሁሉም ሰው የጋራ ሰሜትና እንዲያውም የራሱ ጥቅሞችም ያሉት ስሜት ነው፡፡ ችግር የሚሆነው ፍርሀቱ በጣም ከበዛና ቅጥ ካጣ ነው፡፡
የሚከተሉት መንገዶች የፕረዘንቴሽንን ፍርሀት ለመቀነስና ውጤታማ ፕረዘንቴሽን ለማድረግ ያግዛሉ፡፡
1. የፕረዘንቴሽን ፍርሀት ጤናማና common ስሜት እንደሆነ መረዳት፡፡
Literally ሁሉም ሰው ይፈራል፡፡ ልዮነቱ፡አንዳንዶች ማኔጅ ያደርጉታል አንዳንዶች አያደርጉትም፡፡
*ይህ የፍርሀት ስሜት ሊያስደነግጠን ሳይሆን በደንብ እንድንዘጋጅ ሊያመላክተን ይገባል፡፡
*ፍርሀት ጥቅም አለው፡፡ ይሄውም ባዮሎጂካሊ በሰውነታችን ውስጥ የሆርሞንን መጠን ከፍ በማድረግ የበለጠ ኢነርጂ እንዲኖረን ያደርጋል፡፡
2. ፕረዘንቴሽን ልምምድ (rehearsal )
ፕረዘንቴሽን ልምምድ ይፈልጋል፡፡ ፕረዘንት የምናደርገውን ነገር በደንብ ማወቃችንን፣ ቋንቋችንን፣ ድምፃችንን እንዲሁም ሰአት አጠቃቀማችንን የምናስተካክለው በልምምድ ኀው፡፡
*ፕረዘንት የሚያደርግ ሰው ልክ እንደ መድረክ ተዋናይ ነው፡፡ ፕረዘንቴሽንም በራሱ በተወሰነ መንገድ ትወና ነው፡፡ በመሆኑም ማንም ተዋናይ በደንብ ሳይለማመድ መድረክ ላይ እንደማይወጣ ፕረዘንት የሚያደርግ ሰውም በበቂ ሁኔታ ልምምድ ማድረግ ይኖርበታል፡፡
*በምንለማመድበት ጊዜ ጓደኞቻችን ፊት ሊሇን ይችላል ወይም ብቻችንን ቆመን ሰው ፊት እንዳለን በማሰብ መለማመድ ይቻላል፡፡
" Practice makes perfect"
3. መረጋጋት፣ እራስን ማረጋጋት
4. በቂ አየር መውሰድ ፣ መተንፈስ
5. ፕረዘንት የምናደርግበትን ቦታና መምህራኑን ቀድሞ ማወቅ፡፡ ይህም ሲባል ፕረዘንት የምናደርግበት ቦታ ቀደም ብለን በመሄድ ማየትና የምንቆምበትን ቦታ ስሜቱን መረዳት ነው፡፡
6. አለባበስን ማስተካከል፡፡ ጥሩ አለባበስ በራስ መተማመንን ይጨምራል፡፡
7. ፕረዘንት የማድረግ ፍላጎትን ማዳበር፣ ይህም ሲባል ፕረዘንቴሽንን እንደ ግዴታ ሳይሆን የሰራነውን ነገር ለሰዎች እንደምናሳይበት እንደ ጥሩ አጋጣሚ መውሰድ፡፡
8. በቂ አረፍት ወስዶ መገኘት
9. ቀደም ብሎ መገኘት (አለማርፈድ)
10. ከመጀመሪያው ውጤታማ ስራ መስራት፡፡ ምክንያቱም የአንዳንዶች የፍርሀት ምንጭ በቂ ስራ ካለመስራትና ካለመዘጋጀት ነው፡፡
.
▶️የፕረዘንቴሽን ፍርሀትን እንዴት ማስወገድ እንችላለን?
.
✍ፕረዘንቴሽን በትምህርት ሂወታችን ውስጥ ከሚያጋጥሙን ሂደቶችና የመፈተኛ መንገዶች ውስጥ አንዱ ነው፡፡
*በተለይ በከፍተኛ ትምህርት ላይ መምህራን አሳሳይንመንቶችን ፣ ፕሮጀክቶችን ፣ የምርምር ስራዎችን እና የመሳሰሉትን ተማሪዎች በክላስ ውስጥ ፕረዘንት እንዲያደርጉ ይጠይቃሉ፡፡
*ከትምህርት አለም ውጪም በተለያዮ የስራ ጉዳዮች ላይ ፕረዘንት እንድናደርግ ሊጠበቅብን ይችላል፡፡
*ታዲያ በፕረዘንቴሽን ጊዜ የብዙዎች ችግር ፍርሀት ነው፡፡ ሰው ፊት ቆሞ የመናገር ፍርሀት፡፡
*የፕረዘንቴሽን ፍርሀት የብዙ ሰዎች ችግር ነው፡፡ ጥናቶች እንደሚጠቁሙት እስከ 80 % የሚሆኑትን ሰዎች ጋር ያለ ችግር ነው፡፡ በእርግጥ ችግር ነው ተብሎም ሊነሳም አይችል ይሆናል፡፡ ምክንያቱም መምህራንን ጨምሮ የ public speaking ልምድ ያላቸው አርቲስቶች፣ ፓለቲከኞች፣ የሀይማኖት መሪዎች ሁሉ የሚጋሩት common ስሜት ስለሆነ ነው፡፡
*ይህ የፕረዘንቴሽን (public speaking) ፍርሀት ጤናማ ስሜት ነው፡፡ የሁሉም ሰው የጋራ ሰሜትና እንዲያውም የራሱ ጥቅሞችም ያሉት ስሜት ነው፡፡ ችግር የሚሆነው ፍርሀቱ በጣም ከበዛና ቅጥ ካጣ ነው፡፡
የሚከተሉት መንገዶች የፕረዘንቴሽንን ፍርሀት ለመቀነስና ውጤታማ ፕረዘንቴሽን ለማድረግ ያግዛሉ፡፡
1. የፕረዘንቴሽን ፍርሀት ጤናማና common ስሜት እንደሆነ መረዳት፡፡
Literally ሁሉም ሰው ይፈራል፡፡ ልዮነቱ፡አንዳንዶች ማኔጅ ያደርጉታል አንዳንዶች አያደርጉትም፡፡
*ይህ የፍርሀት ስሜት ሊያስደነግጠን ሳይሆን በደንብ እንድንዘጋጅ ሊያመላክተን ይገባል፡፡
*ፍርሀት ጥቅም አለው፡፡ ይሄውም ባዮሎጂካሊ በሰውነታችን ውስጥ የሆርሞንን መጠን ከፍ በማድረግ የበለጠ ኢነርጂ እንዲኖረን ያደርጋል፡፡
2. ፕረዘንቴሽን ልምምድ (rehearsal )
ፕረዘንቴሽን ልምምድ ይፈልጋል፡፡ ፕረዘንት የምናደርገውን ነገር በደንብ ማወቃችንን፣ ቋንቋችንን፣ ድምፃችንን እንዲሁም ሰአት አጠቃቀማችንን የምናስተካክለው በልምምድ ኀው፡፡
*ፕረዘንት የሚያደርግ ሰው ልክ እንደ መድረክ ተዋናይ ነው፡፡ ፕረዘንቴሽንም በራሱ በተወሰነ መንገድ ትወና ነው፡፡ በመሆኑም ማንም ተዋናይ በደንብ ሳይለማመድ መድረክ ላይ እንደማይወጣ ፕረዘንት የሚያደርግ ሰውም በበቂ ሁኔታ ልምምድ ማድረግ ይኖርበታል፡፡
*በምንለማመድበት ጊዜ ጓደኞቻችን ፊት ሊሇን ይችላል ወይም ብቻችንን ቆመን ሰው ፊት እንዳለን በማሰብ መለማመድ ይቻላል፡፡
" Practice makes perfect"
3. መረጋጋት፣ እራስን ማረጋጋት
4. በቂ አየር መውሰድ ፣ መተንፈስ
5. ፕረዘንት የምናደርግበትን ቦታና መምህራኑን ቀድሞ ማወቅ፡፡ ይህም ሲባል ፕረዘንት የምናደርግበት ቦታ ቀደም ብለን በመሄድ ማየትና የምንቆምበትን ቦታ ስሜቱን መረዳት ነው፡፡
6. አለባበስን ማስተካከል፡፡ ጥሩ አለባበስ በራስ መተማመንን ይጨምራል፡፡
7. ፕረዘንት የማድረግ ፍላጎትን ማዳበር፣ ይህም ሲባል ፕረዘንቴሽንን እንደ ግዴታ ሳይሆን የሰራነውን ነገር ለሰዎች እንደምናሳይበት እንደ ጥሩ አጋጣሚ መውሰድ፡፡
8. በቂ አረፍት ወስዶ መገኘት
9. ቀደም ብሎ መገኘት (አለማርፈድ)
10. ከመጀመሪያው ውጤታማ ስራ መስራት፡፡ ምክንያቱም የአንዳንዶች የፍርሀት ምንጭ በቂ ስራ ካለመስራትና ካለመዘጋጀት ነው፡፡
👉Foundation Types
.
1. Shallow Foundations..
.
▶️Types: Strips, Pads, Rafts
.
*Shallow Foundations are common in construction and are inexpensive due to their lightweight properties. It is usually not required to employ heavy equipment for constructing shallow foundations.
Situations where they should be used in:
Shallow foundations are used when the strata at shallow depths is strong and has enough bearing capacity to support the above building loads, with respect to reasonable differential settlements. The strong strata must be consistent at the shallow depth, so that settlement can be relatively small.
● Rock or dense sand or gravel that goes towards great depths
○ However, it should be noted that shallow foundations should not be designed below GWT and when there are great uplift conditions. The more moisture content is in he soil, the less resistance the foundation gives to the above loads.
● Firm clays at shallow depths lying on top of soft clays that go towards great depths
● Uniform firm clays when there are no trees around the proximity of the foundation structure and around temporary works and where loads can be distributed on the surface area of the foundation
*Situations where they can be used in with ground improvement techniques:
● Loose sands and soft clays at great depths
○ Ground improvement should be used because towards the greater depths, groundwater level changes. Also, vibration of equipment can cause overall and differential settlement.
● Peat
○ Consider the acidity of soil when implementing ground improvement techniques
● Fill
○ More appropriate if the fill is well compacted which will create a higher bearing capacity
● Stiff or high density sand or clay on top of soft clay lying over compact clays at great depths
● Sloping site where sloping effects should be considered and support, such as ground improvement and temporary works, should be used to construct the foundation
● Site with high GWT where dewatering techniques should be used
2. Deep Foundations
.
▶️Types: Piles (Click to learn the different types of piles)
*Deep foundations are heavy foundation structures used to transmit heavy loads created from loading and self-weight of the superstructure into the soils of the deep stratum. They can prevent large differential settlements that will affect the strength and robustness of the building. Information that need to be included during scheme design consist of:
● Number of piles
● Diameter of piles
● Thickness of pile caps
*Situations where they should be used in:
Deep foundations are used when the strong strata is located at a depth and piles, caissons, or piers are driven or bored to the strong strata so that structural columns or walls can transmit loads directly to the rock strata. Deep foundations are also used when the soils between the surface and the rock strata has high settlement rate, such as peat and silt. Loads are transmitted and resisted by end-bearing and skin friction.
● Weak soil stratum or loose sand underneath strong or weak stratum
○ Driving piles can also help to increase the density of sand and stiffness of clay
● Uniform stiff and firm clays, with trees at the proximity of the foundation
○ Even though trees can affect the shrinkage and expansion of soil, trees will not affect the foundation negatively due to piling.
● Peat
○ Consider drag on piles and acidicity of soil when implementing ground improvement techniques
● Suitable for high water tables and uplift conditions
○ Deep foundations do not need as much dewatering as shallow foundations
○ Bored piles should be cased to prevent water damage to piles
○ Temporary works should be carefully designed for the stability of the foundation
● Stiff or high density sand or clay on top of soft clay lying over compact clays at great depth
● Soft clay on top to stiff clay at great depths
○ Use deep bored piles with casing
● Proposed foundation is close to adjacent building
.
1. Shallow Foundations..
.
▶️Types: Strips, Pads, Rafts
.
*Shallow Foundations are common in construction and are inexpensive due to their lightweight properties. It is usually not required to employ heavy equipment for constructing shallow foundations.
Situations where they should be used in:
Shallow foundations are used when the strata at shallow depths is strong and has enough bearing capacity to support the above building loads, with respect to reasonable differential settlements. The strong strata must be consistent at the shallow depth, so that settlement can be relatively small.
● Rock or dense sand or gravel that goes towards great depths
○ However, it should be noted that shallow foundations should not be designed below GWT and when there are great uplift conditions. The more moisture content is in he soil, the less resistance the foundation gives to the above loads.
● Firm clays at shallow depths lying on top of soft clays that go towards great depths
● Uniform firm clays when there are no trees around the proximity of the foundation structure and around temporary works and where loads can be distributed on the surface area of the foundation
*Situations where they can be used in with ground improvement techniques:
● Loose sands and soft clays at great depths
○ Ground improvement should be used because towards the greater depths, groundwater level changes. Also, vibration of equipment can cause overall and differential settlement.
● Peat
○ Consider the acidity of soil when implementing ground improvement techniques
● Fill
○ More appropriate if the fill is well compacted which will create a higher bearing capacity
● Stiff or high density sand or clay on top of soft clay lying over compact clays at great depths
● Sloping site where sloping effects should be considered and support, such as ground improvement and temporary works, should be used to construct the foundation
● Site with high GWT where dewatering techniques should be used
2. Deep Foundations
.
▶️Types: Piles (Click to learn the different types of piles)
*Deep foundations are heavy foundation structures used to transmit heavy loads created from loading and self-weight of the superstructure into the soils of the deep stratum. They can prevent large differential settlements that will affect the strength and robustness of the building. Information that need to be included during scheme design consist of:
● Number of piles
● Diameter of piles
● Thickness of pile caps
*Situations where they should be used in:
Deep foundations are used when the strong strata is located at a depth and piles, caissons, or piers are driven or bored to the strong strata so that structural columns or walls can transmit loads directly to the rock strata. Deep foundations are also used when the soils between the surface and the rock strata has high settlement rate, such as peat and silt. Loads are transmitted and resisted by end-bearing and skin friction.
● Weak soil stratum or loose sand underneath strong or weak stratum
○ Driving piles can also help to increase the density of sand and stiffness of clay
● Uniform stiff and firm clays, with trees at the proximity of the foundation
○ Even though trees can affect the shrinkage and expansion of soil, trees will not affect the foundation negatively due to piling.
● Peat
○ Consider drag on piles and acidicity of soil when implementing ground improvement techniques
● Suitable for high water tables and uplift conditions
○ Deep foundations do not need as much dewatering as shallow foundations
○ Bored piles should be cased to prevent water damage to piles
○ Temporary works should be carefully designed for the stability of the foundation
● Stiff or high density sand or clay on top of soft clay lying over compact clays at great depth
● Soft clay on top to stiff clay at great depths
○ Use deep bored piles with casing
● Proposed foundation is close to adjacent building
👍1
👉SHORT COLUMN VS LONG COLUMN
@civil_Cotm_eng
.
▶️SHORT COLUMN: Short column is defined as the column that contains very large lateral dimension with reference to its length or height is called as short column. Here, the proportion of effective length to its lateral dimension is under or equivalent to 12.
.
*The proportion of effective length of a short column to its radius of gyration remains under 40 or equivalent to 40.
.
*Bulking tendency is very poor. A column buckling analysis results in finding out the maximum load that a column can sustain prior to collapsing.
.
*The load bearing strength is high with reference to the long column of the similar cross-sectional area.
.
*The collapsing of short column occurs due to crushing.
:
▶️LONG COLUMN: Long column is defined as the column that contains small lateral dimension with reference to its length or height. Here, the proportion of effective length of column to its lowest lateral dimension surpasses 12.
.
*The proportion of effective length of a long column to its lowest radius of gyration surpasses 40.
.
*Column buckling easily occurs in long and slender column.
.
*The load bearing strength of a long column remains under with reference to short column with similar cross sectional area.
.
*The column normally collapses in buckling.
.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
@civil_Cotm_eng
.
▶️SHORT COLUMN: Short column is defined as the column that contains very large lateral dimension with reference to its length or height is called as short column. Here, the proportion of effective length to its lateral dimension is under or equivalent to 12.
.
*The proportion of effective length of a short column to its radius of gyration remains under 40 or equivalent to 40.
.
*Bulking tendency is very poor. A column buckling analysis results in finding out the maximum load that a column can sustain prior to collapsing.
.
*The load bearing strength is high with reference to the long column of the similar cross-sectional area.
.
*The collapsing of short column occurs due to crushing.
:
▶️LONG COLUMN: Long column is defined as the column that contains small lateral dimension with reference to its length or height. Here, the proportion of effective length of column to its lowest lateral dimension surpasses 12.
.
*The proportion of effective length of a long column to its lowest radius of gyration surpasses 40.
.
*Column buckling easily occurs in long and slender column.
.
*The load bearing strength of a long column remains under with reference to short column with similar cross sectional area.
.
*The column normally collapses in buckling.
.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
Forwarded from SMH General Construction
👇👇👇👇👇👇👇👇👇👇👇👇 @civil_Cotm_eng
FOOTINGS:- footings are mainly used to transmit the load from super structure to the underlying soil (substructure)
1 , Isolated footings
Isolated footings are provided under each column and may be rectangular, square or circular in plan.
It’s footing may be flat or tapered
2, Combined Footings :
Combined footing supports two or sometimes three columns in a row.
Combined footing is used when property lines, equipment locations, column spacing or other considerations limit the footing clearance at the column location
Combined footing can be rectangular in shape if both the columns carry equal loads or
Trapezoidal if there is a space limitation and they carry unequal loads
3, Strap footings
Consists of two individual footings connected by a beam called strap.
It’s used where the distance between the columns is so great that a trapezoidal combined footing becomes quite narrow, with resulting high bending moments.
The strap beam doesn’t remain in contact with soil so a strap doesn’t transfer any pressure to the soil.
4, Mat or raft foundation
Is Combined footing that covers the entire area beneath a structure and supports all the columns.
👉 Foundation Engineers often considers mats when dealing with any one of the following conditions
👉 The structural loads are so high or the soil conditions so poor that spread footings would be exceptionally large
👉 The soil is very erratic and prone to excessive differential settlement.
👉 The structural loads are erratic and thus increase the likelihood of excessive differential settlement.
5, Pile foundations
Pile foundations are the part of a structure used to carry and transfer the load of the structure to the bearing ground located at some depth below ground surface. The main components of the foundation are the pile cap and the piles.
Piles are relatively long and slender members used to transmit foundation loads through soil strata of low bearing capacity to deeper soil or rock having a higher bearing capacity .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
FOOTINGS:- footings are mainly used to transmit the load from super structure to the underlying soil (substructure)
1 , Isolated footings
Isolated footings are provided under each column and may be rectangular, square or circular in plan.
It’s footing may be flat or tapered
2, Combined Footings :
Combined footing supports two or sometimes three columns in a row.
Combined footing is used when property lines, equipment locations, column spacing or other considerations limit the footing clearance at the column location
Combined footing can be rectangular in shape if both the columns carry equal loads or
Trapezoidal if there is a space limitation and they carry unequal loads
3, Strap footings
Consists of two individual footings connected by a beam called strap.
It’s used where the distance between the columns is so great that a trapezoidal combined footing becomes quite narrow, with resulting high bending moments.
The strap beam doesn’t remain in contact with soil so a strap doesn’t transfer any pressure to the soil.
4, Mat or raft foundation
Is Combined footing that covers the entire area beneath a structure and supports all the columns.
👉 Foundation Engineers often considers mats when dealing with any one of the following conditions
👉 The structural loads are so high or the soil conditions so poor that spread footings would be exceptionally large
👉 The soil is very erratic and prone to excessive differential settlement.
👉 The structural loads are erratic and thus increase the likelihood of excessive differential settlement.
5, Pile foundations
Pile foundations are the part of a structure used to carry and transfer the load of the structure to the bearing ground located at some depth below ground surface. The main components of the foundation are the pile cap and the piles.
Piles are relatively long and slender members used to transmit foundation loads through soil strata of low bearing capacity to deeper soil or rock having a higher bearing capacity .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
Forwarded from SMH General Construction
👉የጨረታ ማስከበሪያ/bid bond/ @civil_Cotm_eng
፡
▶️የጨረታ ማስከበሪያ የዋስትና አይነት ነው፡፡አንድ ለግንባታ ጉዳይ ጨረታ ተሳታፊ የሚሆን ተጫራች ተቋራጭ የሚያቀርበውና ተጫራቹ እንደፈለገ ጨረታውን አቋርጦ እንዳይቀር ለማድረግ እና ምናልባት ተቋራጩ በጨረታው ቢያሸንፍ ውል እንዲገባ ማስገደጃና ዋስትና እንዲሆን ጨረታውን ባወጣው አካል የሚያዝ ዋስትና ነው፡፡
*ይህንኑ በሚደግፍ ሁኔታ በፌዴራል መንግስት ግዥና ንብረት አስተዳደር አዋጅ ቁጥር 649/2001ዓ.ም አንቀጽ 40 ላይ ተደንግጓል፡፡ የዚህ ድንጋጌ ይዘትም ተጫራቹ አሸናፊነቱ ከተገለጸለት በኋላ ውሉን ለመፈረም ፈቃደኛ ካልሆነ ወይም እንዲያቀርብ የተጠየቀውን የውል ማስከበሪያ ካላቀረበ ወይም የጨረታ ማስከበሪያው ጸንቶ በሚቆይበት ጊዜ ተጫራቹ ራሱን ከውድድሩ ያገለለ እንደሆነ የጨረታ ማስከበሪያው ጨረታውን ባወጣው የመንግስት መስሪያ ቤት የሚወረስ ስለመሆኑ የሚገልጽ ነው፡፡
*ጨረታ የሚያወጡ መስሪያ ቤቶችም በሚያዘጋጁት የጨረታ ሰነድ ላይ ተጫራቾች ከሚያቀርቡት የመጫረቻ ሰነድ ጋር የጨረታ ማስከበሪያ አብረው ማቅረብ እንዳለባቸው ሊገለጽ ይገባል፡፡የጨረታ ማስከበሪያው መጠንም ጤነኛ ባልሆነ እና ቅንነት በጎደለው ሁኔታ በጨረታው ለመሳተፍ የሚያስቡትን ተጫራቾች ወደጨረታው እንዳይገቡ ከወዲሁ ለማስቀረት የሚያስችል መሆን ይኖርበታል፡፡
*ለአሸናፊው ተጫራች አሸናፊነቱ በምን ሁኔታ መገለጽ አለበት?በህጉ አግባብ ያለመገለጽ ውጤትስ?(Announcing the successful bidder)
*ለአሸናፊ ተጫራች አሸናፊነቱ መገለጽ ያለበት እና ሊደርሰው የሚገባ በጽሁፍ በደብዳቤ መልክ ነው፡፡ የደብዳቤውም ይዘት የመንግስት መስሪያ ቤቱ ጨረታውን የተቀበለው ስለመሆኑ፣የአሸነፈበትን ዋጋ፣አሸናፊው ተጫራች ማቅረብ ያበትን የውል ማስከበሪያ መጠን(Amount of performance security) የሚገልጽ መሆን አለበት፡፡(Federal public procurement directive:አንቀጽ 16.24 እና አዋጅ ቁጥር 649/2001ዓ.ም አንቀጽ 46) ስለዚህ በህጉ አግባብ አሸናፊነቱ ያልተገለጸለትን አሸናፊ ተጫራች ውል አልተዋዋለም በማለት የውል ማስከበሪያ መውረስ የሚቻል አይሆንም ማለት ነው፡፡ .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
፡
▶️የጨረታ ማስከበሪያ የዋስትና አይነት ነው፡፡አንድ ለግንባታ ጉዳይ ጨረታ ተሳታፊ የሚሆን ተጫራች ተቋራጭ የሚያቀርበውና ተጫራቹ እንደፈለገ ጨረታውን አቋርጦ እንዳይቀር ለማድረግ እና ምናልባት ተቋራጩ በጨረታው ቢያሸንፍ ውል እንዲገባ ማስገደጃና ዋስትና እንዲሆን ጨረታውን ባወጣው አካል የሚያዝ ዋስትና ነው፡፡
*ይህንኑ በሚደግፍ ሁኔታ በፌዴራል መንግስት ግዥና ንብረት አስተዳደር አዋጅ ቁጥር 649/2001ዓ.ም አንቀጽ 40 ላይ ተደንግጓል፡፡ የዚህ ድንጋጌ ይዘትም ተጫራቹ አሸናፊነቱ ከተገለጸለት በኋላ ውሉን ለመፈረም ፈቃደኛ ካልሆነ ወይም እንዲያቀርብ የተጠየቀውን የውል ማስከበሪያ ካላቀረበ ወይም የጨረታ ማስከበሪያው ጸንቶ በሚቆይበት ጊዜ ተጫራቹ ራሱን ከውድድሩ ያገለለ እንደሆነ የጨረታ ማስከበሪያው ጨረታውን ባወጣው የመንግስት መስሪያ ቤት የሚወረስ ስለመሆኑ የሚገልጽ ነው፡፡
*ጨረታ የሚያወጡ መስሪያ ቤቶችም በሚያዘጋጁት የጨረታ ሰነድ ላይ ተጫራቾች ከሚያቀርቡት የመጫረቻ ሰነድ ጋር የጨረታ ማስከበሪያ አብረው ማቅረብ እንዳለባቸው ሊገለጽ ይገባል፡፡የጨረታ ማስከበሪያው መጠንም ጤነኛ ባልሆነ እና ቅንነት በጎደለው ሁኔታ በጨረታው ለመሳተፍ የሚያስቡትን ተጫራቾች ወደጨረታው እንዳይገቡ ከወዲሁ ለማስቀረት የሚያስችል መሆን ይኖርበታል፡፡
*ለአሸናፊው ተጫራች አሸናፊነቱ በምን ሁኔታ መገለጽ አለበት?በህጉ አግባብ ያለመገለጽ ውጤትስ?(Announcing the successful bidder)
*ለአሸናፊ ተጫራች አሸናፊነቱ መገለጽ ያለበት እና ሊደርሰው የሚገባ በጽሁፍ በደብዳቤ መልክ ነው፡፡ የደብዳቤውም ይዘት የመንግስት መስሪያ ቤቱ ጨረታውን የተቀበለው ስለመሆኑ፣የአሸነፈበትን ዋጋ፣አሸናፊው ተጫራች ማቅረብ ያበትን የውል ማስከበሪያ መጠን(Amount of performance security) የሚገልጽ መሆን አለበት፡፡(Federal public procurement directive:አንቀጽ 16.24 እና አዋጅ ቁጥር 649/2001ዓ.ም አንቀጽ 46) ስለዚህ በህጉ አግባብ አሸናፊነቱ ያልተገለጸለትን አሸናፊ ተጫራች ውል አልተዋዋለም በማለት የውል ማስከበሪያ መውረስ የሚቻል አይሆንም ማለት ነው፡፡ .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
👉8 CAUSES OF CRACKS IN CONCRETE YOU SHOULD KNOW
@civil_Cotm_eng
▶️Cracking is one of the most common problems in concrete and it should be avoided seriously.
*Different causes of cracks in concrete are described below:
.
1. SHRINKAGE:
*Shrinkage is one of the major causes of cracking in hardened concrete.
*In drying shrinkage, the volume of concrete is gradually decreased and if the component is restrained against free movement, tensile stresses are developed which causes cracks.
.
2. TEMPERATURE CHANGES:
The temperature variation in concrete results in the differential volume change.
*When the tensile strain capacity of concrete exceeds due to the differential volume change, it will crack.
.
3. CHEMICAL REACTION:
Due to the alkaline nature of cement, it reacts with the carbon dioxide (CO2) present in the atmosphere resulting in an appreciable increase in the volume of the materials which
finally leads to cracking.
.
4. POOR CONSTRUCTION PRACTICES:
Poor construction practices such as adding excessive water to the mix, lack of curing, poor compaction, using low-grade materials, unreasonable placements of construction joints etc. are also responsible for cracking in concrete.
.
5. ERRORS IN DESIGN & DETAILING:
Errors in design and detailing such as an inadequate amount of reinforcement, improper design of foundation, precast members and slabs, improper selection of materials, lack of sufficient contraction joints etc may result in excessive cracking.
.
6. CONSTRUCTION OVERLOADS & EARLY
FORMWORK REMOVAL:
The load induced in the structure during construction can also lead to cracking especially at the younger stage when the
formwork is removed earlier.
.
7. ELASTIC DEFORMATION AND CREEP:
The different components of the building such as wall, column, beam. slab etc undergo elastic deformation when loaded.
*The deformation of concrete depends on the type of building materials used in the constructio such as bricks, cement concrete blocks etc.
*This unusual deformation of concrete results
in cracking.
.
8. CORROSION OF CONCRETE:
The corrosion of steel develops a huge amount of iron oxides and hydroxide that have a much greater volume than the volume of metallic iron. Hence the volume is increased
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
@civil_Cotm_eng
▶️Cracking is one of the most common problems in concrete and it should be avoided seriously.
*Different causes of cracks in concrete are described below:
.
1. SHRINKAGE:
*Shrinkage is one of the major causes of cracking in hardened concrete.
*In drying shrinkage, the volume of concrete is gradually decreased and if the component is restrained against free movement, tensile stresses are developed which causes cracks.
.
2. TEMPERATURE CHANGES:
The temperature variation in concrete results in the differential volume change.
*When the tensile strain capacity of concrete exceeds due to the differential volume change, it will crack.
.
3. CHEMICAL REACTION:
Due to the alkaline nature of cement, it reacts with the carbon dioxide (CO2) present in the atmosphere resulting in an appreciable increase in the volume of the materials which
finally leads to cracking.
.
4. POOR CONSTRUCTION PRACTICES:
Poor construction practices such as adding excessive water to the mix, lack of curing, poor compaction, using low-grade materials, unreasonable placements of construction joints etc. are also responsible for cracking in concrete.
.
5. ERRORS IN DESIGN & DETAILING:
Errors in design and detailing such as an inadequate amount of reinforcement, improper design of foundation, precast members and slabs, improper selection of materials, lack of sufficient contraction joints etc may result in excessive cracking.
.
6. CONSTRUCTION OVERLOADS & EARLY
FORMWORK REMOVAL:
The load induced in the structure during construction can also lead to cracking especially at the younger stage when the
formwork is removed earlier.
.
7. ELASTIC DEFORMATION AND CREEP:
The different components of the building such as wall, column, beam. slab etc undergo elastic deformation when loaded.
*The deformation of concrete depends on the type of building materials used in the constructio such as bricks, cement concrete blocks etc.
*This unusual deformation of concrete results
in cracking.
.
8. CORROSION OF CONCRETE:
The corrosion of steel develops a huge amount of iron oxides and hydroxide that have a much greater volume than the volume of metallic iron. Hence the volume is increased
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
Forwarded from SMH General Construction
👉ከ ትላንት የቀጠለ ስለ Quantity Surveying
.
⏩ኳንቲቲ ስንሠራ ሁሌም የምንሠራው የኮንስትራክሽን እስቴፑን ተከትለን ነው፡፡ ለምሳሌ መጀመሪያ Substructure ነው
የምንሠራው እዛ ውስጥ site clearance, pit excavation,
trench excavation, bulk excavation, backfill, cartway, concrete
work ወዘተ ይኖራሉ፡፡ በመቀጠልም Superstructure ውስጥ ያሉትን ስራዎች ነው የምንሠራው፡፡
ብረትን በተመለከተ ደሞ ለምሳሌ የአንድን ኮለን concrete work ስንሠራ ለአሠራር እንዲቀለን ወዲያው Bar schedule ውስጥ ገብተን ለኮለኑ የሚያስፈልገውን ፌሮ እናስቀምጣለን፡፡
✌ለዛሬ እስቲ ለተለያዩ
ስራዎች የምንጠቀምባቸውን Units Of Measurement እንይ....
1)Site clearance = m2
2)Pit and Trench xcvn = m3
3)Bulk xcvn= ከ30 ሳንቲም በታች ከሆነ m2 በላይ ከሆነ m3
4)Backfill= m3
5)Cart away = m3
6)Lean concrete= m2
7)Reinforcement = kg
8)All Concrete Works (except Ribbed slab and
grouting) =m3
9)Ribbed slab = m2
10)Grouting & filling to holes = in number
11)Formwork= m2
12)Stone masonry= m3
13)Brick masonry= m2
14)Block masonry (HCB, SCB)= m2
15)Roof cover & side cladding = m2
16)Flashing & down pipes = m
17)Plastering & pointing = m2
18)Floor finish ( terrazzo, pvc, marble, etc.) = m2
19)Skirting= m
20)Glazing = m2
21)Painting = m2
22)Sanitary = in number
23)Electrical Installation = length/ number
.
.
⚡ከላይ የተዘረዘሩት በጠቅላላ ዩኒታቸውን ብቻ ነው የጠቀስነው
ከዚህ ጎን ለጎን ግን የስራዎቹ ዝርዝር ሊገለፅ ይገባዋል፡፡ ለምሳሌ
HCB በሜትር እስኩዌር ቢገለፅም ቲክነሱም አብሮ መጠቀስ አለበት፡፡
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇 https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
Join for more updates via
.
⏩ኳንቲቲ ስንሠራ ሁሌም የምንሠራው የኮንስትራክሽን እስቴፑን ተከትለን ነው፡፡ ለምሳሌ መጀመሪያ Substructure ነው
የምንሠራው እዛ ውስጥ site clearance, pit excavation,
trench excavation, bulk excavation, backfill, cartway, concrete
work ወዘተ ይኖራሉ፡፡ በመቀጠልም Superstructure ውስጥ ያሉትን ስራዎች ነው የምንሠራው፡፡
ብረትን በተመለከተ ደሞ ለምሳሌ የአንድን ኮለን concrete work ስንሠራ ለአሠራር እንዲቀለን ወዲያው Bar schedule ውስጥ ገብተን ለኮለኑ የሚያስፈልገውን ፌሮ እናስቀምጣለን፡፡
✌ለዛሬ እስቲ ለተለያዩ
ስራዎች የምንጠቀምባቸውን Units Of Measurement እንይ....
1)Site clearance = m2
2)Pit and Trench xcvn = m3
3)Bulk xcvn= ከ30 ሳንቲም በታች ከሆነ m2 በላይ ከሆነ m3
4)Backfill= m3
5)Cart away = m3
6)Lean concrete= m2
7)Reinforcement = kg
8)All Concrete Works (except Ribbed slab and
grouting) =m3
9)Ribbed slab = m2
10)Grouting & filling to holes = in number
11)Formwork= m2
12)Stone masonry= m3
13)Brick masonry= m2
14)Block masonry (HCB, SCB)= m2
15)Roof cover & side cladding = m2
16)Flashing & down pipes = m
17)Plastering & pointing = m2
18)Floor finish ( terrazzo, pvc, marble, etc.) = m2
19)Skirting= m
20)Glazing = m2
21)Painting = m2
22)Sanitary = in number
23)Electrical Installation = length/ number
.
.
⚡ከላይ የተዘረዘሩት በጠቅላላ ዩኒታቸውን ብቻ ነው የጠቀስነው
ከዚህ ጎን ለጎን ግን የስራዎቹ ዝርዝር ሊገለፅ ይገባዋል፡፡ ለምሳሌ
HCB በሜትር እስኩዌር ቢገለፅም ቲክነሱም አብሮ መጠቀስ አለበት፡፡
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇 https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
Join for more updates via
Rebound hammer test used for non destructive test of existing concrete member .. whole details of Rebound Hammer test
@civil_Cotm_eng
👇👇👇👇
@civil_Cotm_eng
👇👇👇👇
❤1👍1