🔹Difference between stirrups and ties -

The 'U' or 'box' shaped reinforcement which is perpendicular to the main reinforcement in a beam is termed as STIRRUP.

The reinforcement which is perpendicular to the main reinforcement in a column is termed as TIE.


Join 👉 @ethioengineers1
to know more about construction industry

#Ethioconstruction
ሀዋሳ ዩኒቨርሲቲ የተቋረጠውን ትምህርት ለማስቀጠል ማስታወቂያ አውጥቷል!

በሁሉም ደረጃ ያሉ ተማሪዎች ሳይሆን የድህረ ምረቃ ተማሪዎች ብቻ በ2012 ዓ.ም ያቋረጡትን ትምህርታቸውን ለመቀጠል እንዲመዘገቡ ጥሪ ተደርጎላቸዋል።

1. የመደበኛ ፕሮግራም (Regular) ተማሪዎች መስከረም 4-6/2012

2. የእረፍት ቀን ፕሮግራም (Weekend) ተማሪዎች መስከረም 7-8/2012 ዓ/ም

ምዝገባ የሚከናወን ሲሆን የመደበኛ ፕሮግራም ተማሪዎች መስከረም 7 እንዲሁም የእረፍት ቀን ተማሪዎች መስከረም 9/2013 ዓ/ም ትምህርት ይጀምራል ተብሏል።

Share 👇👇👇

@ethioengineers1
📌▪What is the standard size of a column for building?


The size of the columns depends on the total load on the columns.

The minimum size of the column should not be less than 9”x9”.

9”x9” columns are to be used for a single storey structure with M15 (1:2:4) (cement: sand: aggregate ) grade of concrete.

In case, 9”x9” column size is to be used for 1 and half storey structure, then it is advised to use M20 (1:1.5:3) (cement : sand : aggregate ) grade concrete.

A safe and structurally sound column size for a 1 and half storey structure should not be less than 12”x9” using M15 grade concrete. This should be in your most preferred and practical options list.

▪Distance between the columns

Try to maintain equal distance between the centres of two columns. Always plan a column layout on a grid.

The distance between two columns of size 9”x9” should not be more than 4m centre to centre of column.

If larger barrier free distances are required then going for larger column size is to be used.

The size of the columns increase because of two factors:

1 . Increase in the distance between two columns (This increases the dimensions of the columns as well the depth of the beam.)

2 . Height of the building (Increase in the number of floors is directly proportional to the dimensions of the columns.



▪Alignment of Columns

A rectangular grid is to be made for placing the columns. This helps in avoiding mistakes and placing in columns can be done in the right way.

The columns can preferably be arranged in two different fashions:

1 . In a straight line with the help of a grid.

2 . In a circular fashion for circular buildings.

Zigzag arrangement of columns is an absolutely wrong way of working out Structural design. It should be remembered that when columns are erected, beams are laid connecting the columns.

The Zigzag column placement causes three major issues:

1 . Unbalanced load transfer

2 . Problems in wall construction

3 . Problems in laying beams.


Join @ethioengineers1

#Ethioconstruction
*📌▪REINFORCEMENT DETAILS OF BEAM AND SLAB▪*

*Main straight bars:*

These bars are placed in tension zone. In simply supported beams the main bars placed at bottom and in case of cantilever beam these bars are placed at top.


*Main cranked bars:*

These are also main bars but the bar is cranked at 45 degrees. The main function of these bar is to eliminate shear in beams.

*Hanger bars:*

These bars are used for just support the stirrups. These bars are placed opposite to main bars.

*Stirrups:*

These are in shape of rectangular or square according to shape of structure . The main function of the stirrups is to hold all the bars together and also reduces the shear.


#ethioconstruction


@ethioengineers1
#Why crank bars are provided in slabs ?

1,To resist hogging (negative bending moment)at the support .

2,To counter the risk of failure of the slabs.

3,To encounter the shear force.the shear force is always greater at the end sections of supports.

4,By providing crank the strength of slab increased.

* The crank bars are very important in R.C.C beam or slab because without countering the hogging( Negative moment ) the structure will fail or the strength of the structure will reduce

#Ethioconstruction

Join @ethioengineers1
_*📌 ▪*PLASTERING, POINTING AND DIFFERENCE BETWEEN THEM*▪_


*▪WHAT IS PLASTERING?*

In civil engineering construction plaster is the process of covering the rough wall OR make the wall surface smooth.

but now a days in advance technology we able to use the different materials to make the wall surface smooth and attractive. And plaster Mortar is obtain from cement or Lime , Sand and water. We use the different ratio for plaster Like 1: 2 . 1:4 , 1:5 and 1:6 etc. Here 1 means Cement and 2 Mean Sand.

we have to keep the 1:3 ratio for plastering, because it is the standard ratio to give us the good quality for plastering construction. Therefor we have to use the standard ratio.

*▪WHAT IS POINTING?*

Instead of plastering we do the pointing for bricks masonry wall. For pointing we make the special mortar to exposed the joints of the wall. And the pointing can cover the joints from depth of 10mm to 20mm and filling it with richer mortar mix. We can use the different ratio for pointing of mortar like 1:2 or 1:3 etc. Pointing is just use to cover the space between two bricks. And that should be filled the the mortar gun with pressure than it will give us the good result of pointing. pointing we do on that time when we don’t want to do plaster, if we want to do plaster to wall than pointing is not requred. Becuase the plastering is already can filled the pointing place during plastering construction . therefore the pointing should be done for the simple wall. But most of the people do the pointing for wall at external side the wall that is why they do not plaster the external wall side. and for internal wall surface we have to used plastering.



📌 *_*DIFFERENT BETWEEN PLASTERING & POINTING_**

*PLASTERING*

▪1:Plastering is used to protect the exposed surface of the masonry.

▪2: Cement, sand and lime are used in plastering.

▪3: The plastering is done at both sides of surface (both inside and outside).

▪4: In plastering work, we use the large amount of materials.

▪5:After the plastering, the defects of the masonry are not visible.

▪6: When we plaster the wall, after the plastering work.

*POINTING*

▪1: However, in pointing only joints are properly filled with mortar.

▪2:In pointing, we use just cement mortar.

▪3:Pointing is done only at the outer side of the wall.

▪4:In pointing, we use less amount of mortar.

▪5:After the pointing, the surface does not become smooth and plain.

▪6:After pointing, the defects of masonry can be seen.



Join :- @ethioengineers1
👍1
ከዛሬዎቹ የ2012 "ዓ.ም. የበጎ ሰው" ተሸላሚዎች አንዱ ስለ እናት ሀገራችን ኢትዮጵያ የዓባይ ወንዝ ተጠቃሚነት በአረቡ አለም በመከራከር የሚታወቀው ከኢትዮጵያውያን ቤተሰቦቹ በሳውዲ አረቢያ ተወልዶ ያደገው መሐመድ አል አሩሲ!

መሐመድ ወደመድረክ ታጅቦ ሲሄድ እያለቀሰ ነበር።
❤️❤️❤️❤️ ethiopia
What is BIM (Building Information Modeling.

Across the world, BIM (Building Information Modeling) is becoming a crucial and even mandated process to ensure the planning, design, and construction of buildings is highly efficient and collaborative. Read on to discover what BIM is, how BIM is used, and what BIM levels mean.

What Is BIM?
BIM is an acronym for Building Information Modeling. It is a highly collaborative process that allows multiple stakeholders and AEC (architecture, engineering, construction) professionals to collaborate on the planning, design, and construction of a building within one 3D model. It can also span into the operation and management of buildings using data that owners have access to. This data allows owners and stakeholders to make decisions based on pertinent information derived from the model— even after the building is constructed.

From Blueprints to CAD to BIM
In the past, blueprints and drawings were used to express information about a particular building plan. This 2D approach made it very difficult to visualize dimensions and requirements. Next came CAD (Computer Aided Design), which helped drafters see the benefit of plans in a digital environment. Later on, CAD turned 3D, which brought more realistic visuals to blueprints. Now, BIM (Building Information Modeling) is the standard— but it’s more than just a 3D model.

BIM Objects
BIM objects, the components that make up a BIM model, are intelligent, have geometry, and store data. If any element is changed, BIM software updates the model to reflect that change. This allows the model to remain consistent and coordinated throughout the entire process so that structural engineers, architects, MEP engineers, designers, project managers, and contractors can work in a more collaborative environment.

The “I” in BIM
BIM, as a whole, refers to the process of all parties involved in the construction and lifecycle management of built assets, working collaboratively and sharing data. However, the true power of BIM lives in the “I” (information). All of the information gathered— from conception to completion— isn’t just stored, it’s actionable. The data can be used to improve accuracy, express design intent from the office to the field, improve knowledge transfer from stakeholder to stakeholder, reduce change orders and field coordination problems, and provide insight into existing buildings for renovation projects later on.

How Is BIM Information Shared?
This information in a BIM model is shared through a mutually accessible online space known as a Common Data Environment (CDE) and the data collected is referred to as an 'information model'. Information models can be used at all stages of a building’s life; from inception to operation— and even renovations and renewals

#BIM
#DigitalTransformation

@BIMDigital
@ethioengoneers1
👍2❤1
_*📌Rate Analysis- Civil works Elements, Factor Affecting & Requirement of Rate analysis*_

*What is analysis of rate or rate analysis?*

The process of determining rate of any work in civil Engineering project like earthwork, brickwork, plastering, painting etc. is known as analysis of rate or simply rate analysis. The rate of these works further helps in determining cost of particular work and in turn cost of the project. The rate of any process or works depends on various factors.

Rate analysis of Civil Works or Building Works is the determination of cost of each construction work per unit quantity. This cost includes the cost of materials, labours, machinery, contractors profit and other miscellaneous petty expenses required for the particular work to be complete in unit quantity.

*Factor affecting Rate analysis*

The various factors that are involved in determining rate of any process of work are mentioned below:

▪Specification of works and material about their quality, proportion and constructional operation method. Specification of the civil work and materials such as quality of materials, proportion of mortar or concrete, thickness of plastering, number of coats of painting, depth of excavation, type of soil etc.

▪Quantity of materials and their costs. Quantity of materials, number of different types of labours and rates of materials and labours influence the rate analysis.

▪Cost of labor and their wages different types of labours and rates of materials and labours influence the rate analysis.

▪ Location of the construction site – Distance of construction site from source of materials, availability of labours, availability of water, machinery etc. Overhead and establishment charges

*Why we need rate analysis.*

▪To determine the actual cost per unit.

▪To know the requirements of quantities of labours, materials, machineries and capital to complete the project.

▪ To work out the economical use of materials and processes in completing the particulars item.

▪To calculate the cost of extra items which are not provided in the contract bond, but are to
be executed as per the directions of the department.

▪To optimize the use of labour, materials and machineries and to know the alternatives to optimize the resources.

▪ To revise the schedule of rates due to increase in the cost of material and labour or due to change in technique.


*Elements of Rate Analysis*

Elements which constitute the rate analysis are:

a) Material cost inclusive of wastage
b) Labour cost
c) Plant & machinery owning and operating charges
d) Contractor’s overheads and profit
Main term on rate analysis

*Labour :*

The rate of labour is based on skill of the labour, such as skilled labour, semi-skilled and unskilled labour. The cost of materials and labours vary from place to place. Thus, the cost of each construction work varies from place to place. Labour may be classified into two types
a. Skilled
b. Unskilled

Labour Charges can be obtained from schedules of rate. 30% of the skilled labour in data should be taken 30% as Ist class and remaining 70% as IInd class

*Lead statement*

The distance between the source of availability of material and construction site is known as lead and is calculated in km. the conveyance cost of material depends on lead
The lead statement will give the total cost of materials per unit item including first cost, conveyance loading-unloading, stacking charges etc.

*Lift*

Similarly during the earthwork, the average height through which soil has to be lifted from sources to the place of spreading is known as lift
First lift is taken up to 2m
The extra lift is counted for up to 1 m after the first lift and so on


#Ethioconstruction

@ethioengineers1
*📌▪STRUCTURAL COMPONENTS OF BUILDING AND THEIR STANDARD DIMENSIONS▪*


The Structural components are essential elements of any building. Without this structural building not able to stand and sustain its position on the ground. This components systems provide strength, stability, support, and durability guarantee in structural components systems.

Structural Components
Building Components
Following is list of building components,

1▪Foundation

2▪Plinth

3▪Earth Filling

4▪DPC (Damp Proof Course)

5▪Flooring

6▪Walls

7▪RCC Column

8▪Sill Level

9▪Lintel

10▪Ceiling

11▪Chhajjas

12▪RCC Beam

13▪Roof or Slab

14▪Doors

15▪Windows

16▪Parapet Walls

17▪Waterproofing on Terrace

*1. Foundation:*

A Foundation is the lowest part of building structure rested on soil below ground level. All loads of building transferred to foundation through-beam and column arrangement. Its main function is to distribute the load evenly and safely to the ground.

structural components of Building
Building Foundation


In framed structure, Footings are generally used as foundation to support structural load of building.

Following are various types of foundations and footings used in construction:

#Shallow foundation

•Individual footing or isolated footing

•Combined footing

•Strip foundation

•Raft or mat foundation

#Deep Foundation

•Pile foundation

•Drilled Shafts or caissons

*Standard Dimensions:*

Foundation size, depth totally depends on the structural and site ground condition. So, there are no standard dimension recommendations for it.

But, For small structural like row houses depth of foundation should be at least 1.5 m from ground level.

@ethioengineers1

*Rest of the components we'll see later
👇👇👇👇
❤1
*2. Plinth Level:*

Plinth Height or Plinth level or Plinth is the offset created between ground level and superstructure of the ding. It is made by constructing a brick wall from ground level to the ring level of the building. Its main function is to prevent the entry of moisture from the nd surface to the building superstructure.

▪Standard Dimensions:

Plinth height of any building must be at least 45 cm from the ground level.

*3. Earth Filling:*

Earth Filling in Plinth
An Earth Filling or Soil Filling is done between the plinth wall. It is essential to fill the open space left between the ground level to the plinth level. Earth filling must be very well compacted, so that the flooring gets sufficient hard surface base.

▪ Standard Dimensions:

Earth must be filled to the top of the plinth level. Different materials can utilize as earth fill like soil, coarse aggregate, waste materials, Brick Bat, etc.

*4. DPC (Damp Proof Course):*

DPC is a layer of waterproofing material such as asphalt or waterproof cement at the plinth level. The superstructure walls are constructed above the DPC layer, so that no dampness rises from the ground surface into walls.

DPC ( Damp Proof Course)
In short, DPC present the rise of water to superstructure.

If dampness rises in the wall of the superstore it reduces the strength of the walls and creates unhealthy living conditions. Also it created many defects in paint and plaster and ultimately increase maintenance cost.

In the case of Plinth beams are provided above ground level DPC is not required. Because plinth Beam itself performs as a DPC layer to restrict the entry of dampness.

▪Standard Dimensions:

Generally, DPC is laid on brick masonry construction up to the plinth level. So the width of DPC is the same as the width of the Brick wall and thickness may vary from 2.5cm to 5cm.

*5. Flooring:*
Flooring is an important component of the home. It is one which provided an attractive and pleasant look to the house.

Flooring is made by laying tile on it. There are different designs and materials are available to make flooring.

1. Timber Flooring

2. Laminated Flooring

3. Vinyl Flooring

4. Porcelain or ceramic Tile Flooring

5. Natural Stone Flooring – Marble, Granite etc.

▪Standard Dimensions:

Flooring is provided above earth filling with base made of cement concrete (1:2:4). Flooring material should have sufficient thickness and strength.

*6. Walls:*

Walls are the vertical component in any structure. It can be constructed using stones, bricks, concrete blocks, etc. The different types of bonds are used for constructing walls. Bricks walls are essential to enclose the inside area and protect against wind, sunshine, rain, etc. Doors and Windows are provided in the walls for ventilation and access to the building.

▪Standard Dimensions:

Walls may be made single brick walls or double brick walls. The single brick wall has a thickness of 100 mm and the Double brick wall has a thickness of 230mm.

*7. RCC Column:*

Columns are vertical members constructed to support any structural frame. Load Coming from the Slab, Beam transferred to column and column transfer load to the footing safely.

Building structure may have two types of columns: Architectural columns and structural columns. Architectural columns primly used to increase the aesthetic appearance of building while a structural column takes the load coming from the slab above and transfers safely to the foundation.

▪Standard Dimensions:

Column may have various sizes as per the structural load requirements. But, for minimum dimension for any structural column is restricted to 9” x 9” or 225mmx225mm.

*8. Sill Level:*

It is the base point of any window in the house or it is a level where windows are placed. Sill level is very important to ensure evenness in all window level.
Sill is a height which is ensuring that the proper amount of light enters in the house. It also provides easy to habitant to look outside through the window without any discomfort. It provides a solid base for window installment.

@ethioengineers1
👍3
Quantity takeoff.
Taking of quantities from BIM is not as hard as it used to be.
So why aren't we all doing it? The answer includes one or more of the following reasons.

1. We don't have BIM model because the clients or architects don't want to share it with us.
2. We don't trust results because we can not easily check the dimensions and quantities in 3D.
3. We don't know how to takeoff quantities from.BIM because we are not familiar with Revit and other BIM authoring tools (software).
4. We have no access to Revit or other BIM authoring tools because they are expensive, difficult to learn and most importantly are not suitable for quantity takeoff.

The construction industry is fast moving on using BIM., with 12% more companies using BIM year on year. So we can't afford to be left behind. Whether we use BIM now for our cost estimation or not, it is soon going to be inevitable because more and more projects require BIM proficiency so let's get prepared.

In the UK, Europe, Australia USA and Canada, using BIM is now becoming business as usual.

#BIM
#DigitalTransformation
#EthiopianBIMSociety

@BIMDigital
@ethioengineers1
⏩⏯⏯🏙🏘የህንጻ ግንባታ የአካል ጉዳት ያለባቸውን ሰዎች ተገልጋይነት ታሳቢ ማድረግ ይኖርበታል
.

▶️በኢትዮጵያ የህንጻ አዋጅ አንቀጽ 36 ላይ "ማንኛውም የህዝብ መገልገያ ህንጻ ውስጥ በተሸከርካሪ ወንበር ለመንቀሳቀስ የሚገደዱትን እና መራመድ የሚችሉ ሆኖ ደረጃ መውጣት የሚሳናቸውን ጨምሮ የአካል ጉዳት ላለባቸው ሰዎች የሚመች መዳረሻ መዘጋጀት አለበት" በሚል በግልጽ ተደንግጓል፡፡

▶️ድንጋጌው በአስገዳጅ/obligatory/ ሁኔታ የተቀመጠ ነው፡፡

▶️በተጨማሪም በህንጻ ግንባታ ወቅት የሚሰሩ መጸዳጃ ቤቶች የአካል ጉዳት ላለባቸው ሰዎች የሚመቹ እና ሊደርሱባቸው የሚችሉ መሆን ይኖርባቸዋል፡፡ እነዚሁ መጸዳጃ ቤቶችም በበቂ መጠን/ቁጥር መኖር ይገባቸዋል፡፡

▶️ሌላው ከመሬት ወለል በላይ/above the ground floor/ ከ20(ሀያ) ሜትር
በላይ ከፍታ የሚኖራቸው የህንጻ ግንባታዎች ልዩ ግዴታ አለባቸው፡፡

▶️ይሄውም ህንጻው አሳንሰር ወይንም ተመሳሳይ አገልግሎት ሊኖረው እንደሚገባ እና አሳንሰሩም ያለማቋረጥ አገልግሎት መስጠት እንደሚገባው የህንጻ አዋጁ አንቀጽ 33(4) እና(5) ይደነግጋል፡፡
▶️ስለዚህ አሳንሰር ከግራውንድ ፍሎር ጀምሮ ወደላይ ከሀያ ሜትር በላይ ከፍታ ላላቸው ህንጻዎች የቅንጦት ሳይሆን በህግ የተቀመጠ ግዴታ ነው ማለት ነው፡፡

▶️ይህን የህንጻ ግንባታ ህግ መጣስ ደግሞ ከህንጻ አዋጁ አንቀጽ 47 ጀምሮ በተደነገገው አግባብ የወንጀል ተጠያቂነትን ያስከትላል፡፡

▶️ስለሆነም የህንጻ አዋጁ በሚያስቀምጠው አግባብ የህንጻ ግንባታዎችን እንዲከናወኑ ማድረግ ከተጠያቂነት የሚያድን ከመሆኑም ባሻገር የአካል ጉዳት ያለባቸው ሰዎች በህግ የተሰጣቸውን መብት እንዲገለገሉ ምቹ ሁኔታ መፍጠርም መሆኑን ለመጠቆም እንወዳለሁ፡፡
፡
በ ጉባኤ አሰፋ


#Ethioconstruction

@ethioengineers1
~የኮንስትራክሽን ውል አደጋዎች ~


🚧የኮንስትራክሽን ኮንትራትን መንደፍ ወይም ማርቀቅ በየደቂቃዎች ውስጥ
ከመፈራረም አንድ ሚሊየን ዕጥፍ አስቸጋሪ ነው፡፡
ምክንያቱም ከኮንትራት ውል
ውስጥ በስህተት የገባ ሀረግ ወይም ሳይፃፍ የቀረ አንድ አንቀጽ ወደ ፍርድ ቤት
የሚያመላልስ ከፍተኛ ጦስ ሊያስከትል ስለሚችል ነው፡፡
የኮንስትራክሽን ኮንትራትን መንደፍ ወይም ማርቀቅ፣ አደጋ ላይ የሚጥል መሆኑን
ባለመዘንጋት በተወሰነ ደረጃ ረቂቅ ከመዘጋጀቱ በፊት የሥራውን ሂደት በጀቱን እና
ኘላኑን በተመለከተ ፕሮጀክቱን እንዲያካሂድ ከተመረጠው ኮንትራከተር ጋር
መወያየት ጠቀሜታ ቢኖረውም፣ አንድ አስገንቢ የኮንትራት ውል ሲያረቅ
የሚከተሉትን አምሰት ዋና ነጥቦች ማስወገድ እንደሚኖርበት የዘርፉ
ባለሙያዎች ይመክራሉ፡፡
ለህግ አስቸጋሪ የሆኑ ቴክኒካል ዝርዝሮች
በረቂቅ ውስጥ በህግ አግባብ ለመፍታት አስቸጋሪ የሆኑ፣ በመደበኛ የህግ
አንቀጽ ውስጥ ያልተካተቱ ቴክኒካል ዝርዝሮችን በውሉ ላይ ማካተት በቀጣይ
ችግር ቢከሰት እንኳ ለመፍታት በጣም አስቸጋሪ ስለሚሆኑ ማስወገድ አስፈላጊ
ነው፡፡
ምከንያቱም አንዳንድ ቴክኒካል አሠራሮች እና ቃላቶች ለህግ ባለሞያዎች
አስቸጋሪ በመሆናቸው ነው፡፡
ስለዚህ በኮንትራክተሮች በቀላሉ የሚታወቁ እና
የዘርፉ ባለሙያዎች በህግ ፊት ቀርበው ሊመሰክሯቸው የሚችሏቸውን ቴክኒካዊ
ቃላት በውሉ ማካተት አይገባም፡፡
ረጃጅም አረፍተ ነገሮች
ዋናውን ነጥብ በቀጥታ ከመጥቀስ ባለፈ፣ ዝርዝር ሀተታ ማስቀመጥ ረጃጅም
አረፍተ ነገር መፃፍ አላስፈላጊ አይደለም::
ተደጋጋሚ ቃላትና አረፍተ ነገር መጠቀም
ቀደም ብሎ የሠፈሩ ቃላት እና አረፈተ ነገሮችን ልዩ አንቀጽ እየደጋገሙ ማስፈር
አያስፈልግም፡፡
አስፈላጊ ከሆነ የሠፈረበትን አንቀጽ መጥቀስ ብቻ በቂ ነው፡፡

የዲዛይን ለውጥን በቃል መፈጸም~

ማንኛውም የዲዛይን ወይም የአሠራር ለውጥ ሲደረግ በቃል ሥምምነት ብቻ
እንዲፈጸም ማድረግ ችግር ቢፈጠር በህግ አግባብ ለመፍታት እንዳይቻል
የሚያደርግ እንቅፋት ስለሚፈጥር ማንኛውንም የዲዛይን እና የለውጥ
ስምምነቶች በጽሑፍ መሥፈርት እና የእያንዳንዱ አባል ፊርማ፣ አሻራ ባረፈበት
የህግ አግባብ መፈጸም ይገባል፡፡
ሊለወጥ የማይችል ቋሚ ውል አለመፈራም~
በሥራ ሂደት በጊዜ ሁኔታ ሊፈጠር የሚችለውን ነገር ቀደም ብሎ መረዳት
አስቸጋሪ በሚሆንባቸው የሥራ ዘርፎች አንዱ የኮንስትራክሽን ዘርፍ ነው፡፡ ስለዚህ
የኮንትራት ውል ሲረቀቅ እና ሲፈረም ውሉ እንደአስፈላጊነቱ የሚለወጥበት እና
የሚታደስበትን የህግ አንቀፅ በውሉ ላይ ማስፈር ተገቢ ነው፡፡


#ethioconstruction

@ethioengineers1
🌼🌼 መልካም አዲስ ዓመት 🌼🌼

1 - 1 - 2013
#አዲሱ አመት በኮንስትራክሽን ኢንዱስትሪው በተለይ በህግ እና ፖሊሲ ጉዳይ
በሳል ውይይት በማድረግና በመሞገት የህግና ምህንድስና ባለሙያዎች
ተባብረን ስር ነቀል ለውጥ እንዲመጣ የምንሰራበት እንዲሆን ምኞታችን
ነው።መልካም አዲስ አመት።01/01/2013ዓ.ም።


https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
በዚህ ዓመት ብርቱ ሰራተኛ ሁን!

“ሕልምና ራእይ ወደ እውነታ የሚመጣው በምትሃት አይደለም፡፡ በላብ፣ በቆራጥነትና ጠንክሮ በመስራት ነው” - Colin Powell

መልካም ቀን 💚💛❤️
👉 PRE-STRESSED CONCRETE (PSC) VS REINFORCED CONCRETE (RC)
.
➡️ፕሪ እስትረስድ ኮንክሪት👇

▶️ኮንክሪቱ ላይ ሎድ ከመጫኑ በፊት Axial Compressive Stress አፕላይ ይደረግባቸል።

⏺ለምሳሌ አንድን ቢም ከጎንና ከጎን Compressive ፎርስ ስናደርግበት የ ‹‹ በ ›› ፊደል አይነት ቅርፅ ይኖረዋል (ሲጋነን) ኢሄ የታጠፈው ቢም እላዩ ላይ ሎድ ሲጫንበት ቢሙ ወደ ነበረበት ቦታው ይመለሳል።
🚩እንደዛ ነው pre-stressed ኮንክሪቶች act የሚያደርጉት

🚧PSC Vs RC

➡️1 RC beam ላይ ለዲዛይን assume ስናደርግ ኮንክሪቱ ምንም አይነት tensile stress አይሸከምም - tensile እስትረሱን የሚሸከመው ፌሮው ነው ብለን ነው ሌላው assumption ፌሮው ቴንሽኑን ይሸከማል ብንልም የፌሮውን አቅም fully utilize አናደርገውም ወይም ደሞ ሙሉ ለሙሉ አንጠቀምበትም የዚህም ምክንያቱ ኮንክሪቱ ቴንሽን ዞን ውስጥ የሚከሰተውን Crack width ለመገደብ ወይም limit ለማድረግ ነው።

⏹ከላይ በተገለፁት ሁለት ምክንያቶች ማለትም የኮንክሪቱንም የፌሮውንም አቅም ሙሉ ለሙሉ ባለመጠቀማችን የተነሳ ለትልልቅ ሎዶች RC ከ PSC አንፃር ኢኮኖሚካል አይደለም።

⏹የዚህም ምክንያቱ የ RCን አቅም ሙሉ ለሙሉ ስለማንጠቀምበት ነው በተጨማሪም RC ላይ ትልልቅ Grade ያላቸው ኮንክሪትና ፌሮ መጠቀማችን ብዙም ዋጋ የለውም ከ RC ድክመት ለመዳን Pre-Stressed ኮንክሪቶች ተፈጠሩ ከRC በተሻለ መልኩ የኮንክሪቱንና የብረቱን እስትሬንግዝ ይጠቀማሉና።

🚧Methods of Prestressing

➡️1) Pre tensioning👇

⏺ቢሙን ካስት ማድረጊያ mold እናዘጋጃለን።
⏺ሞልድ ውስጥም PSC ኬብሎች ወይም tendon
እናስቀምጣለን
⏺እነዚህ ኬብሎችም ላይ Tensile ፎርስ apply እናደርጋለን
⏺አፕላይ እንደተደረገ ኮንክሪቱን ሞልድ ውስጥ አስገብተን ኮንክሪቱን ካስት እናደርጋለን
⏺ኮንክሪቱ ሲደርቅ ፎርሶቹን remove እናደርጋለን ቢሙም ዝግጁ ሆነ ማለት ነው::

➡️2) Post tensioning👇

⏺እዚህ ላይ ኮንክሪቱ ከደረቀ በኋላ ነው Compressive force አፕላይ የምናደርገው
⏺Apply የሚደረጉት ፎርሶች ኮንክሪቱ ላይ compressive stress ሲፈጥሩ ብረቱ ላይ ደሞ tensile stress ይፈጥራሉ ማለት ነው::

#Structure


@ethioengineers1
ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) እና ዲዛይን ቢዩልድ(Design build)(DB)
ጉባኤ አሰፍ(በፌዴራልና በአማራ ክልል ጠበቃና የህግ አማካሪ:09-75-576924) (Construction Lawyer)

--------///---------////-----------

ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB)
#በኮንስትራክሽን ጉዳይ በአብዛኛው በሀገራችን የሚሰራበት የፕሮጀክት አይነት ዲዛይኑን አሰሪው በራሱ መንገድ እንዲዘጋጅ ካደረገ በኃላ ግንባታውን በተቋራጭ እንዲከናወን የሚያደርግበት ነው።ይሄውም ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) በመባል ይታወቃል፡፡በዚህ የፕሮጀክት አይነት የታቀደውን ግንባታ ዲዛይኑን አሰሪው በራሱ አርክቴክት ወይም በሌላ ሶስተኛ ወገን/ በሌላ አርክቴክት ድርጅት/ እንዲከናወን ያደርጋል፡፡በመቀጠልም በተዘጋጀው ዲዛይን መሰረት ግንባታውን የሚያከናውን ተቋራጭ ወደመምረጥ ሂደት ይገባል፡፡የግንባታው ባለቤት የመንግስት መስሪያ ቤት የሆነ እንደሆነ ግንባታውን የሚያከናውን ተቋራጭ የመምረጡ ስራ የሚከናወነው በግዥ ህግ መሰረት ይሆናል፡፡ይሄ አይነቱ ፕሮጀክት በሀገራችን የተለመደ ነው፡፡
============/////================

ዲዛይን ቢዩልድ(Design build)(DB)
#በሌላ በኩል ደግሞ ተቋራጩ ዲዛይኑን እና ግንባታውን በራሱ የሚያከናውንበት የፕሮጀክት አይነትም አለ።ይሄውም ዲዛይን ቢዩልድ(Design build)(DB) ይባላል፡፡በዚህ የፕሮጀክት አይነት ተቋራጩ የታቀደውን ግንባታ ዲዛይኑን በራሱ አርክቴክት ወይም በሌላ የአርክቴክት ድርጅት አማካይነት ያከናውናል፡፡የአርክቴክት ስራው የሚያስከትለው ሀላፊነት የተቋራጩ ይሆናል፡፡ከዲዛይን ስራው ጋር የተያያዘ ችግር የሚያስከትለው ሀላፊነት አሰሪውን/የግንባታውን ባለቤት አይነካውም፡፡ሆኖም ተቋራጩ ዲዛይኑን ያሰራው በሌላ የአርክቴክት ድርጅት አማካይነት የሆነ እንደሆነ ከአርክቴክቸር ስራው ጋር በተያያዘ ተቋራጩ ለአሰሪው የሚኖርበት ሀላፊነት እንደተጠበቀ ሆኖ አርክቴክቱም ለተቋራጩ በፍትሀብሄር ህጉ ስለእውቀት ስራ ውል በተደነገገው አግባብ ሀላፊነት ይኖርበታል ማለት ነው፡፡በዚህ አይነት ፕሮጀክት የግንባታው ባለቤት/አሰሪው ሙሉ በሙሉ የኮንስትራክሽን ስጋቶችን/risks/ ወደ ተቋራጩ ያስተላልፋል፡፡ይህ ማለት አሰሪው ውጤቱን ማለትም ግንባታውን በመጀመሪያ በቀረበለት ዲዛይን አግባብ በጥራት ተከናውኖለት ከመረከብና በውሉ የተቀመጠውን የግንባታ ዋጋ ከመክፈል ባለፈ ማናቸውም አይነት ሀላፊነት አይኖርበትም ማለት ነው፡፡ለአብነት ለመጥቀስ ያህል የኢትዮጽያ መንገዶች ባለስልጣን(ERA) ዲዛይን ቢዩልድ የመንገድ ፕሮጀክት ሲኖረው ተወዳዳሪ ተቋራጮች የሰርቨየይንግና ዲዛይን ስራዎችን በራሳቸው ከሰሩ በኋላ በዋጋ ይወዳደራሉ፡፡ተቋራጮቹ ዲዛይኑን ሲሰሩ አሮጌ ድልድዮች ካሉ እና ተጠግነው በአዲስ ድልድይ የጥራት ደረጃ መድረስ የሚችሉ ከሆነ ተቋራጮች እንደየፍላጐታቸውና ሙያዊ ምርመራቸው/ምክንያታቸው ተጠጋኝ ድልድይ እና በአዲስ የሚገነባ ድልድይ እያሉ በዝርዝር በዲዛይን አካተው የሚያቀርቡ ሲሆን ምንም ሆነ ምን በውጤት ደረጃ አሰሪው በሚፈልገው የጥራት ደረጃ/ስታንዳርድ መገንባቱ እና ይሄውም በአማካሪው መረጋገጡ ግን የግድ ነው፡፡ምናልባት ተጠግኖ በሚፈለገው የጥራት ደረጃ ይደርሳል የተባለው አሮጌ ድልድይ በጥገና ወቅት ቢፈርስ እንኳ አሰሪውን ክፍያ የመጨመር ሀላፊነት አያስከትልበትም፡፡ስለዚህ ዲዛይን ቢዩልድ ፕሮጀክት ለአሰሪዎች ሪስክ ፍሪ/ከስጋት ነጻ የሆነ የፕሮጀክት አይነት ነው፡፡
=======///==============//=====
#ሌላው ሁለቱም የፕሮጀክት አይነቶች ለኮንስትራክሽን ውላቸው የሚጠቀሙት ጀኔራል ኮንዲሽን የተለያየ ነው።FIDIC በዚህ ረገድ የግንባታ ውል ዝግጅትን በማቅለል ለአለማችን ትልቅ ስጦታ ነው። አለበለዚያ አሰሪና ተቋራጭ በየአንዳንዱ ውል ዝግጅት ወቅት በሁሉም የውል ሁኔታወች ላይ መደራደርን ይጠይቃቸው ነበር።ዛሬ ላይ ግን ለውሉ ጥቅም ላይ የሚውለውን ጀኔራል ኮንዲሽን አስመልክቶ FIDIC ቨርሽን መረጣ እና በስፔሻል ኮንዲሽን ኦፍ ኮንትራክት በሚካተቱ ነጥቦች ላይ ብቻ መወያየት በቂ ነው።
#በተጨማሪም በዲዛይን ቢዩልድ ፕሮጀክት የኮንስትራክሽን ስጋት/ሪስክ ሙሉ በሙሉ ወደ ተቋራጩ የሚተላለፍ በመሆኑ ልዩ የዋስትና ሽፋን ያስፈልገዋል፡፡ስለዚሁም ተቋራጩ በግንባታው ዋጋ ልክ All risk insurance እንዲገባ እና ለዲዛይን ስህተት፣ለስራው ብልሽትና በተቋራጩ ባለሙያወች የስራ ስህተት ለሚከሰት ጉዳትና ኪሳራ ደግሞ professional indemenity insurance እንዲገባ FIDIC ዲዛይን ቢዩልድ ፕሮጀክት ኮምፖቴብል የሆነው ተርንኪ ጀኔራል ኮንዲሽን ግዴታ ያስቀምጣል።
#በሀገራችን ዲዛይን ቢዩልድ የኮንስትራክሽን ፕሮጀክት ብዙም የተለመደ አይደለም።ሆኖም በመንገድ ግንባታ ውሎች የኢትዮጵያ መንገዶች ባለስልጣን አልፎ አልፎ ይጠቀምበታል።
#በአጠቃላይ በሀገራችን በኮንሰትራክሽን ዲዛይኒንግ እና የውል አስተዳደር ረገድ ሰፊ የእውቀት ክፍተት ያለ በመሆኑ እና ፕሮጀክቶች በተያዘላቸው ጊዜና ገንዘብ የማይጠናቀቁበት ሁኔታ በሰፊው የሚስተዋል እንደመሆኑ ሙሉ የኮንስትራክሽን ሪስክ/ስጋት ወደ ተቋራጩ በማስተላለፍ መንግስታዊ ግንባታዎችን በዲዛይን ቢዩልድ የፕሮጀክት አይነት እንዲከናወኑ ማድረግ የተሻለ አማራጭ ሊሆን እንደሚችል ለመጠቆም እወዳለሁ።
አመሰግናለሁ