SMH General Construction
22.4K subscribers
1.48K photos
45 videos
294 files
1.18K links
በኮንስትራክሽን ዘርፍ ላይ ከዲዛይን ,ቅየሳ ጀምሮ እስከ ፊኒሺንግ ሁሉንም

👷‍♂እናማክራለን
🏢ዲዛይን እናደርጋለን
📚ሙያዊ ድጋፍ እና እገዛ እናደርጋለን
🏗በጥራት እና በጊዜ ፍጥነት እንገነባለን
📲 0953138434(Eng sintayehu melese)

tiktok
https://www.tiktok.com/@ethiocons

ለሃሳብ እና ኣስተያየት
@Ethiocon143bot ይጠቀሙ
Download Telegram
A Scottish lesson in BIM

When it comes to BIM, the chasm between contractors and their clients doesn’t seem to narrow. The building team complain there is little interest from the building owners receiving a digital model to aid asset management. Clients retort that they are deluged with information, most of which they don’t need.

Read more click on the link.
https://www.bimplus.co.uk/analysis/scottish-lesson-bim/

#BIM
#DigitalTransformation
#EthiopianBIMSociety

@BIMDigital
@ethioengineers1
Please open Telegram to view this post
VIEW IN TELEGRAM
Please open Telegram to view this post
VIEW IN TELEGRAM
🔹Important concept -

▪️ Column - It is the vertical member subjected to axial compression.

▪️ Classification of columns on the basis of shape -

1.Square section
2. Rectangular section
3. Circular section
4. L- section
5. T - section

@ethioengineers1
*▪Some Important Questions*

*1: what is Development Length?*

*Ans:* Development length is an extera length of steel, which transter the load from one steel bar to other.

*2: What is Hydration?*

*Ans:* Hydration is reaction b/w cement and water.

*3: What is M20 Grad Concrete?*

*Ans:* “M” Stands for Mix and No (20) is the Compressive strength of concrete in 20N/mm2 after 28 days after laboratory test. and M20 grad concrete we have to use in the RCC slab.

*4: What is Water Cement ratio?*

*Ans:* water–cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

*5: What is Bearing Capacity of Soil?*

*Ans:* Bearing Capacity is the capacity of soil to support the load applied to the ground.

*6: Time to removal of Fromwork for different RCC structures?*

*Ans:* For column/walls, vertical form works should be detached after 16 to 24 hours.

Soffit formwork to slab (formwork is located under the slab), the form works can be removed after 3 days. (props should be reaffixed once the removal is done).

Soffit formwork to beam, the form works can be removed after 7 days. (props should be reaffixed once the removal is done.)

Beam that spans up to 4.5 m (length), the form works can be removed after 7 days.

Beam that spans surpassing 4.5 m (length), the form works can be removed after 14 days.
For footing, the formworks can be removed after 16 to 24 hours.
For staircase, the form works can be removed after 5 days.


@ethioengineers1
👍1
🔹Formwork details of column.


@ethioengineers1
👉Deep Foundation

➡️Most common types are

1. Piles
2. Cofferdams
3. Caisson

1.Pile Foundation

⏺Depending upon their function or use

1. Bearing piles
2. Friction piles
3. Sheet piles
4. Anchor piles
5. Batter piles
6. Fender piles
7. Compaction piles

⏺Depending upon the material used

1. Timber piles
2. Concrete piles
3. Composite piles
4. Steel piles

🏷Concrete piles

▶️Concrete piles may be classified as

1. Pre - cast piles
2. Cast - in - situ piles or Cast in place piles
3. Prestressed concrete piles

*⃣Various types of cast-in situ concrete piles are

1. Simplex pile
2. Franki pile
3. Vibro pile
4. Vibro - expanded pile
5. Raymond pile
6. Mac Arthur pile

🏷Steel piles

*⃣Types of steel piles commonly used are

1. H - piles
2. Pipe - piles
3. Screw piles
4. Disc piles
Sheet piles

*⃣These piles are driven side by side into the ground to form a continuous vertical wall.


🏷Sheet piles can be divided into three categories

1. Straight-web type
2. Shallow or deep arched- web type
3. Z web type


*⃣Depending upon the material used, sheet piles can be divided into

1. Wooden sheet piles
2. Precast concrete sheet piles
3. Prestressed concrete sheet piles
4. Steel sheet piles


🏷Pile driving Piles are driven in the ground by the following method

1. By drop hammer
2. By steam hammer ( single acting or double acting type )
3. By water jets
4. By boring


⏺2.Coffer dams

▶️These are temporary structure constructed in a river or a lake for excluding water from a given site to enable the building operation to be performed on dry surface.


▶️Cofferdams may be divided into

1. Earthen cofferdams
2. Rock - fill cofferdams
3. Single- walled cofferdams
4. Double-walled cofferdams
5. Crib cofferdams
6. Cellular cofferdams ( Circular or diaphragm type)

⏺3.Caissons

▶️A watertight structure made up of wood, steel or RCC constructed for the excavation for foundation in rivers or lakes.

▶️They remain in position and become integral part of the permanent structure.

▶️Caisson may be classified as

1. Open caisson ( open at top and bottom )
2. Box caisson ( closed at bottom and open at top)
3. Pneumatic caisson ( closed at top and open at bottom)

#Foundation

@ethioengineers1
👍1
Please open Telegram to view this post
VIEW IN TELEGRAM
👉 ድጋም የቀረበ

🏷ስለ የ Foundation (መሠረት) ኣይነቶች ትንሽ እንበል...

🚧1)Shallow Foundation

➡️እነዚህን ፋውንዴሽኖች የምንጠቀመው አፈሩ ብዙም ሳይቆፈር በቅርብ ጥልቀት ጠንካራ የአፈር ሁኔታ ካለ ነው፡፡

➡️ለመገንባት ትልልቅ ማሺኖች አያስፈልጉም ብዙ ችሎታም አይጠይቁም::

▶️1.1) Spread/ Pad/Isolated Footing

➡️አንድ ኮለን ብቻ ነው support የሚያደርጉትእንዲሁም የሚመጣውን ፎርስ eccentricity መሰረት በማድረግ circular/ rectangular or square የሆነ ቅርፅ ሊኖራቸው ይችላል፡፡

▶️1.2)Combined Footing

➡️ሁለትና ከዛ በላይ ኮለኖችን በአንድ ፓድ support ለማድረግ ነው የምንጠቀምባቸው፡፡

➡️እነዚህን የምንጠቀመው ሁለት ተቀራራቢ Isolated Footing ካሉ ሁለቱን አንድ ላይ combine በማድረግ ኮንክሪትም ፌሮም ሴቭ ማድረግ እንችላለን፡፡

➡️በተጨማሪም isolated ለመጠቀም property limit ካለ እነዚህን መጠቀም እንችላለን::

➡️2 አይነት Combined Footing አሉፐእነርሱም

▶️1.2.1) Rectangular Combined Footing

➡️ይህንን የምንጠቀመው ሁለቱም ኮለኖች የሚሸከሙት ሎድ ተቀራራቢ ወይም እኩል ከሆከሆነይም ትራፖዞይዳል ለመጠቀም የስፋት ገደብ ካለ ነው።

▶️1.2.2. Trapezoidal Combined Footing

➡️ሁለቱ ኮለኖች የሚሸከሙት ሎድ ልዩነት የተጋነነ ከሆነ ነው።

▶️1.3) Strap/ Cantilever Footing

➡️ሁለት ፓዶችን በቢም በማያያዝ ሎድ ከአንዱ ፓድ ወደሌላው እንዲተላለፍ ማድረግ እንችላለን፡፡

➡️ቢሙ በራሱ ሎድ አይሸከምም ሎድ ያስተላልፋል እንጂ እነዚህን የምንጠቀመው ኮለኖቹ ከ7 ሜትር በላይ ከተራራቁ combined footing ብንጠቀም ኢኮኖሚካል ስለማንሆን ፓዶቹን በቢም በማያያዝ እንደ combined footing ልንጠቀምባቸው እንችላለን፡፡

▶️1.4) Mat/ Raft foundation

➡️እነዚህን የምንጠቀመው መሬቱ የመሸከም አቅሙ ትንሽ ከሆነና spread footing ስንጠቀም የህንጸውን ስፋት ከ50 ፐርሰንት በላይ ከሸፈኑት ነው።

➡️አንዳንዴ ግን spread footing ከ 50 ፐርሰንት በላይ ቢሸፍኑትም ለ spread footing negative reinforcement ስለማንጠቀም ከ Mat ይልቅ ኢኮኖሚካል ሊሆኑ ይችላሉ ምክንያቱም Mat negative & positive reinforcement ይጠቀማሉ፡፡

➡️ማን ኢኮኖሚካል እንደሆነ ቼክ ማድረግ የኢንጅነሩ ድርሻ ነው፡፡

@ethioengineers1
👍1
🚧የግንባታ ምልክቶች (Construction Symbols):-

🚧የግንባታ ሌይኣዉት ድራዊንግ (Construction Layout Drawing) ለመስራት አርክቲክቱ የሚጠቀምባቸው ምልክቶች/Symbols የተወሰኑት የሚከተሉት ናቸው።
🔘መስኮት(Window)
🔘በር(Door)
🔘ግድግዳ(Wall)
🔘ምሰሶ/ቋሚ(Pillar&Column)
🔘አግዳሚ(Beam)
🔘ጪስ ማውጫ(Chimney)

ወዘተ ሲሆኑ የኤሌክትሪክ ፖይንቶችን ለማስቀመጥ የነዚህን ዲያሜንሽን ማወቅ ጠቃሚ ነው።
🔹የምሰራው ማብሪያ ማጥፊያ ወይም ሶኬትም በር ላይ ወይም መሰኮት ላይ ወይም ሌላ አላስፈላጊ ቦታ ላይ እንዳያርፍ ይረዱናል።


@ethioengineers1
👍1
Please open Telegram to view this post
VIEW IN TELEGRAM
🔹Important concept -

▪️ Development length
-

Development length is an extera length of steel, which transfer the load from one steel bar to other.

Join 👉 @ethioengineers1
to know more about Civil Engineering.
🔹Important concept by interview point of view.

🚧 what is Raveling ?

👉 it is the progressive loosening or separation of aggregate in a pavement surface coarse from the surface downward or from the edge inward.

@ethioengineers1
👍2
🚧 5Ways to Terminate a
Contract


➡️A contract is a legal document that binds at least two parties to one another and requires them to meet certain obligations detailed in the contract.

➡️In some instances, contract termination can occur that will make the contract void of legal binding.

▶️Only the parties involved in the agreement may terminate a contract.

1 ,Impossibility of Performance


⏺A contract typically requires one or more parties to do something, which is called performance.

*⃣For example, a company may hire and sign a contract to have a public speaker talk at a company event Once the public speaker fulfills his duties agreed upon in the contract, it is called performance.

*⃣If for some reason it is impossible for the public speaker to fulfill his duties, it is called impossibility of performance or sometimes "frustration."

*⃣For example, if the speaker were seriously injured and no one could replace him, that would be impossibility of performance.

*⃣The company has the right to terminate the contract in this scenario.

2 ,Breach of Contract

➡️When a contract is intentionally not honored by one party, it is called a breach of contract and is grounds for contract termination.

▶️A breach of contract may exist because one party failed to meet his obligations at all or did not meet his obligations fully.

*⃣For example, if you purchased a product that did not arrive until a day after the agreed upon delivery date, that is an immaterial breach of contract.

▶️However, if your order did not come until two weeks after the delivery date and it affected your business, then that is a material breach of contract.

▶️Generally, with a material breach of contract, the injured party has the right to seek monetary damages for his losses as well as cancel the agreement.

3 ,Termination By Prior Agreement

➡️You may terminate a contract if you and the other party have a prior written agreement that calls for a contract termination because of a specific reason.

▶️The usual name for this type of provision is a break clause.

▶️The agreement must give the details of what qualifies as a reason for contract termination.

▶️It should also state what actions need to take place for one of the parties to terminate the contract.

▶️In most cases, one party must submit a written notice to the other party to terminate the contract.

4 ,Rescission of the Contract

➡️A rescission of a contract is when a contract is terminated because an individual misrepresented themselves, acted illegally fraud for example or made a mistake.

*⃣For example, if you bought a house but after further inspection you discover that the seller intentionally hid the poor physical condition of the home, you may possibly rescind the contract.

▶️A contract rescission may take place if one party is not old enough to enter a contract or if a elderly person is not able to make legal decisions because of incapacity.

5 ,Completion of the Contract

➡️A contract is essentially terminated once the obligations outlined in the contract are completed.

▶️Parties should keep documentation showing that they fulfilled their contract duties.

▶️Documentation is helpful if the other party tries to later dispute the fulfillment of your contract obligations.

▶️A court of law will require proof of contract fulfillment if a dispute occurs.

#ConstructionLaw

@ethioengineers1
🔹What is Rutting
( የመኪና ጎማ የሄደበት ምልክት) ?

🚧A rut is a depression or groove worn into a road or path by the travel of wheels or skids.

🚧Ruts can be formed by wear, as from studded snow tires common in cold climate areas, or they can form through the deformation of the asphalt concrete, pavement or subbase material.

Join 👉 @ethioengineers1
👉Are you supervisor/Inspector/Resident Engineer??

▶What are good quality of You

♡ supervision is important to ensure the structure
being executed are constructed according to Design, Specification, code requirement as well as accepted practice.

♡ these are quality of Good supervisor


🚧1. Observation Skill

🚧2. Technical skill

➡️Familiar with current technology and code standard

🚧3. Communication Skill

➡️Written and oral, Listening
and speaking.

🚧4. Negotiating

➡️about Scope, cost or schedule objective, resource assignment.

🚧5. Problem solving skill

➡️decision making at the
right time

🚧6. Analytical skills

➡️looking at the big picture while at the same time separately understanding critical elements.


@ethioengineers1
📚MATERIALS FOR DAMP PROOFING📚

The materials used for damp proofing are:

1. Bitumen: In hot condition it is highly flexible and can be applied with brush to the bedding of concrete or mortar. Thickness of coat provided is about 3 mm.

2. Mastic asphalt: It is a semirigid material. It is obtained by heating asphalt with sand and mineral fillers. It is perfectly impervious. It should be laid very carefully.

3. Bituminous or asphaltic felt
: It is a flexible material which is available in rolls. It is provided on roof slabs and parapet walls with an overlap of 100 mm on sides. The laps are sealed with bitumen. They do not withstand heavy movements.

4. Bricks: Good bricks with water absorption less than 5 per cent are sometimes used to make damp proof courses. The bricks are laid in two to four courses in cement mortar.

5. Stones: Stones like granite, trap and slates may be laid over wall to its full width as damp-proof course.

6. Mortar: Cement mortar of proportion 1 : 3 with small quantity of lime and water proofing agents are used to make a water proofing course to foundation.

@ethioengineers1
በኢትዮጵያ የኮንስትራክሽን ኢንዱስትሪ ውስጥ ተጠቃሽ ከነበሩት የግል የኮንስትራክሽን ኩባንያዎች ውስጥ አንዱ የሆነው አኪር ኮንስትራክሽን ኩባንያ ንብረት የነበረው የዋና መሥሪያ ቤት ሕንፃ በነበረበት የባንክ ዕዳ ምክንያት ከ203 ሚሊዮን ብር በላይ በሆነ ዋጋ በጨረታ ተሸጠ፡፡

@ethioengineers1
👉ደረጃ(Stair case)
.
🏗ደረጃ አንድ የህንፃ ወሳኝ አካል ነው፡፡
*ሰዎች ከአንድ ፎቅ ወደ ሌላ ፎቅ መሄድ እንዲችሉ በቅደም ተከተል የተቀመጡ ቅደም ተከተሎች ነው።
*ደረጃው በመደበኛ ዲዛይን መርሆዎች መሆን ያለበት እና ሰዎች ደረጃዎቹን በቀላል ሁኔታ ለመደራደር እንዲችሉ በእኩል ደረጃ መሆን አለበት፡፡
.
🚧ደረጃ አንድ የሕንፃ ግንባታ ዋና አካል ነው ፣ መኖሪያ ፣ ቢሮ ወይም የህዝብ መገልገያ።
*የግንባታ ኮዶች መሠረት የተነደፈ እና የተሠራ ነው።
*ደረጃ straight ፣ circular ወይም spiral ሊሆን ይችላል። *ለተጠቃሚዎች ችግር እንዳይፈጥር እና አደጋዎችን ለማስወገድ ታሣቢ መሆን አለበት፡፡
.
⚡️stair design principle
.
ደረጃዎች ከአንድ ፎቅ ወደ ሌላው ወለል ተደራሽነት ለመስጠት ቅደም ተከተል የተደረደሩ way ናቸው፡፡
*እነሱ በህንፃው ምቹ ቦታ መቅረብ አለባቸው፡፡
*ባለብዙ ፎቅ ግንባታ ፣ ምንም እንኳን ከፍ ወዳሉ ፎቆች ለመደበኛ እንቅስቃሴ ከአንድ ፎቅ ወደ ሌላ ቦታ ቢኖሩም፣ እሳት ወይም ሌሎች አደጋዎች ካሉ ደደረጃዎች ለአስቸኳይ መውጣት አስፈላጊ ናቸው ፡፡
.
🙌Technical terms
.
የሚከተሉት ከደረጃ ጋር የተዛመዱ ቴክኒካዊ ቃላት ወይም trminologies ናቸው
.
1. step /እርምጃ-ወደ ላይ ሲወርድ/ ሲወርድ እግሩ የሚቀመጥበት የደረጃ ክፍል ፡፡
.
2. tread - የደረጃው አግድም ክፍል።
.
3. Riser-የደረጃ አንድ ቀጥ ያለ ክፍል ፡፡
.
4. String -ደረጃዎቹን የሚደግፍ ዝንባሌ ያለው አባል ፡፡
.
5. Landing-በእያንዳንዱ በረራ መጨረሻ ላይ የቀረበው አግድም መድረክ ነው ፡፡
.
6. pitch(ማስገቢያ) - የደረጃው ቁመት ነው ፡፡
.
7. Hand railing-እጅን የሚደግፍ ደረጃ ያለው አዝማሚያ አባል ነው ፡፡
.
8 . baluster:- የ hand rail መደገፍያ ቀጥ ያለ መካከለኛ ድጋፍ ነው ፡፡
.
⚡️የሚከተሉት ጥሩ የ ደረጃ ባህሪዎች ናቸው:-

1. ከህንፃው ከሁሉም ጎኖች በቀላሉ መድረስ አለበት

2. አየር መኖር አለበት

3. በእያንዳንዱ flight መጨረሻ ሰፊ landing ሊኖረው ይገባል

4. በመደበኛነት flight ውስጥ ከ 12 ደረጃዎች በላይ መሆን የለበትም።

5. የደረጃዎቹ መነሳት እና መሄዳቸው የተመጣጠነ መሆን ያለበት እና የflight መውጣት እና መውረድ ቀላል ነው ፡፡

6. የእጅ ጣውላ ቢያንስ በደረጃው በአንዱ በኩል መሰጠት አለበት

7. የደረጃው angle ከ 30 እስከ 45 ዲግሪዎች መሆን አለበት ፡፡

🚧(የ ደረጃ ኣይነቶች) Stair types...👇

*Straight stairs
*Quarter-turn stairs
*Dog-legged stairs
*Open-newel stairs
*Circular stairs
*Bifurcated stairs
*Geometrical stairs
*Spiral stairs
.
👉ደረጃዎች ከሚከተሉት ማናቸውም ቁሳቁሶች ይገነባሉ ፡፡
.
*የጡብ ማሳዎች ፣ የድንጋይ ንጣፍ ፣ ጣውላዎች ፣ ብረት ፣ በተጠናከረ የሲሚንቶ ኮንክሪት ሊሰሩ ይችላሉ።
.
#Stair

@ethioengineers1