👆This kind of reinforcement is used to prevent punching shear failure.
I hope u are all familiar with punching shear. #Punching shear is a type of failure of reinforced concrete slabs subjected to high localized forces.
https://t.me/ethioengineers1
I hope u are all familiar with punching shear. #Punching shear is a type of failure of reinforced concrete slabs subjected to high localized forces.
https://t.me/ethioengineers1
➡️Wind load is the ‘’load’’ placed by the wind speed and its air density on to a building.
With high velocity winds,low pressure areas are created on the building which creates suction pressure.
Some are so strong that they can pull of the corner of a home’s roof.
*️⃣Wind load has 3 components:
▶️Uplift load
▶️Shear load
▶️Lateral load
https://t.me/ethioengineers1
With high velocity winds,low pressure areas are created on the building which creates suction pressure.
Some are so strong that they can pull of the corner of a home’s roof.
*️⃣Wind load has 3 components:
▶️Uplift load
▶️Shear load
▶️Lateral load
https://t.me/ethioengineers1
*📌
*Main straight bars:*
These bars are placed in tension zone. In simply supported beams the main bars placed at bottom and in case of cantilever beam these bars are placed at top.
*Main cranked bars:*
These are also main bars but the bar is cranked at 45 degrees. The main function of these bar is to eliminate shear in beams.
*Hanger bars:*
These bars are used for just support the stirrups. These bars are placed opposite to main bars.
*Stirrups:*
These are in shape of rectangular or square according to shape of structure . The main function of the stirrups is to hold all the bars together and also reduces the shear.
#ethioconstruction
@ethioengineers1
▪REINFORCEMENT DETAILS OF BEAM AND SLAB▪**Main straight bars:*
These bars are placed in tension zone. In simply supported beams the main bars placed at bottom and in case of cantilever beam these bars are placed at top.
*Main cranked bars:*
These are also main bars but the bar is cranked at 45 degrees. The main function of these bar is to eliminate shear in beams.
*Hanger bars:*
These bars are used for just support the stirrups. These bars are placed opposite to main bars.
*Stirrups:*
These are in shape of rectangular or square according to shape of structure . The main function of the stirrups is to hold all the bars together and also reduces the shear.
#ethioconstruction
@ethioengineers1
➡️Haunch bar
1. If a haunch bar is used in the bottom of the tank and other load-bearing structure from the side,then it will provide extra strength or retain shear from on the wall because the wall work like a cantilever
2.if haunch bar is used in corner of the tank and other structure I.e retaining wall then it’s will reduce the stress developed in the corner portion and carry more shear force
*⃣Haunch bar is used for :-
1. Improve share resistance
2. Avoid leakage
3.improve load caring capacity of side
4. Decrease pressure
*⃣Application of haunch bar
.Haunch bars in water tanks
.Retaining wall
.Box culverts
.Swimming pool
.Retaining structure elements in the dam
@ethioengineers1
Haunch bar purpose is wider section but I can try to simple for you in short description 1. If a haunch bar is used in the bottom of the tank and other load-bearing structure from the side,then it will provide extra strength or retain shear from on the wall because the wall work like a cantilever
2.if haunch bar is used in corner of the tank and other structure I.e retaining wall then it’s will reduce the stress developed in the corner portion and carry more shear force
*⃣Haunch bar is used for :-
1. Improve share resistance
2. Avoid leakage
3.improve load caring capacity of side
4. Decrease pressure
*⃣Application of haunch bar
.Haunch bars in water tanks
.Retaining wall
.Box culverts
.Swimming pool
.Retaining structure elements in the dam
@ethioengineers1
In this Image'' A'' is correct because near the joint shear wall be more
therefore ties should be provided with less spacing.
https://t.me/ethioengineers1
therefore ties should be provided with less spacing.
https://t.me/ethioengineers1
👍1
Reinforced Concrete(RC):
Reinforced concrete is a strong durable building material that can be formed into many varied shapes and sizes ranging from a simple rectangular column to a slender curved dome or shell.
Its utility and versatility are achieved by combining the best features of concrete and steel.
#concept tip
@ethioengineers1
Reinforced concrete is a strong durable building material that can be formed into many varied shapes and sizes ranging from a simple rectangular column to a slender curved dome or shell.
Its utility and versatility are achieved by combining the best features of concrete and steel.
#concept tip
@ethioengineers1
👍1
⏹Sheet piles
➡️Sheet piles are generally thin piles.
They make plates of concrete ,timber, and steel .
These piles are driven in to the ground for either separating members or for Stopping the seepage of water,they are not meant for carrying the vertical load
Generally, the sheet piles are made of steel or timber .
However , sometimes R.C.C sheet piles also adopt .
steel piles are suitable for permanent structure in which the depth of driving exceeds 3m.
➡️Types of sheet piles wall
*⃣Cantilever sheet pile
*⃣Anchored sheet pile
➡️Use of sheet piles
.Light in weight
.Can reuse again and again
.Easier to raise the pile length
.Long service
.Lesser deformation of joints when wedged full with soil stones during driving
@ethioengineers1
➡️Sheet piles are generally thin piles.
They make plates of concrete ,timber, and steel .
These piles are driven in to the ground for either separating members or for Stopping the seepage of water,they are not meant for carrying the vertical load
Generally, the sheet piles are made of steel or timber .
However , sometimes R.C.C sheet piles also adopt .
steel piles are suitable for permanent structure in which the depth of driving exceeds 3m.
➡️Types of sheet piles wall
*⃣Cantilever sheet pile
*⃣Anchored sheet pile
➡️Use of sheet piles
.Light in weight
.Can reuse again and again
.Easier to raise the pile length
.Long service
.Lesser deformation of joints when wedged full with soil stones during driving
@ethioengineers1
#Why crank bars are provided in slabs ?
1,To resist hogging (negative bending moment)at the support .
2,To counter the risk of failure of the slabs.
3,To encounter the shear force.the shear force is always greater at the end sections of supports.
4,By providing crank the strength of slab increased.
* The crank bars are very important in R.C.C beam or slab because without countering the hogging( Negative moment ) the structure will fail or the strength of the structure will reduce
#Ethioconstruction
Join @ethioengineers1
1,To resist hogging (negative bending moment)at the support .
2,To counter the risk of failure of the slabs.
3,To encounter the shear force.the shear force is always greater at the end sections of supports.
4,By providing crank the strength of slab increased.
* The crank bars are very important in R.C.C beam or slab because without countering the hogging( Negative moment ) the structure will fail or the strength of the structure will reduce
#Ethioconstruction
Join @ethioengineers1
*pedestals or plots used to support raised floors which provides an elevated structural floor above the concrete slab/floor to create a hidden void/space for the passage of mechanical, plumbing and electrical services/fittings ,Raised floors are widely used in modern offices*
@ethioengineers1
@ethioengineers1
Forwarded from BeGet Engineering Plc [CENGG]
SUMMARY
በቀላሉ ለመምረጥና ማየት እንዲመቻቹ ከስራናቸው ማስተማሪያ አማርኛ ቪዲዮዎች መካከል በተደጋጋሚ ከምንጠየቃቸው ዉስጥ የተወሰኑ የመረጥናቸውን የዩቲዩብ ሊንክ አስቀምጠናል።
1.Gravity Loading Calculations
https://youtu.be/t-WFwP2FWos
2. Ribbed Slab Concept, Analysis , Design & Quantity Calculations
https://youtu.be/3SoW8vdVwKQ
3.ConMIS introduction , A program which helps to work quantity ,planning & payment certeficate
https://youtu.be/1TWavJhnKyk
4. Introduction to Structural Design
https://youtu.be/nXnqz8lW0_4
5. Non Uniform Loading on ETABS & SAP
https://youtu.be/FGqrkc524c0
6. Bar Spacing Conversion
https://youtu.be/53c2u9FAw0M
7. Stair Detailing presentation
https://youtu.be/kXJm0UbeJxI
8. Mat Foundation on SAFE
https://youtu.be/UDEVA0OcvDI
9. Ribbed Slab Analysis & Design Hand Calculation
https://youtu.be/EsEPq2qIof4
10. Highway Design Introduction
https://www.youtube.com/watch?v=TVmEuigLzV8&t=11s
@CENGGsoftwaresolution
በቀላሉ ለመምረጥና ማየት እንዲመቻቹ ከስራናቸው ማስተማሪያ አማርኛ ቪዲዮዎች መካከል በተደጋጋሚ ከምንጠየቃቸው ዉስጥ የተወሰኑ የመረጥናቸውን የዩቲዩብ ሊንክ አስቀምጠናል።
1.Gravity Loading Calculations
https://youtu.be/t-WFwP2FWos
2. Ribbed Slab Concept, Analysis , Design & Quantity Calculations
https://youtu.be/3SoW8vdVwKQ
3.ConMIS introduction , A program which helps to work quantity ,planning & payment certeficate
https://youtu.be/1TWavJhnKyk
4. Introduction to Structural Design
https://youtu.be/nXnqz8lW0_4
5. Non Uniform Loading on ETABS & SAP
https://youtu.be/FGqrkc524c0
6. Bar Spacing Conversion
https://youtu.be/53c2u9FAw0M
7. Stair Detailing presentation
https://youtu.be/kXJm0UbeJxI
8. Mat Foundation on SAFE
https://youtu.be/UDEVA0OcvDI
9. Ribbed Slab Analysis & Design Hand Calculation
https://youtu.be/EsEPq2qIof4
10. Highway Design Introduction
https://www.youtube.com/watch?v=TVmEuigLzV8&t=11s
@CENGGsoftwaresolution
➡️COMMON CONCRETE PROBLEMS AND THEIR
PREVENTION
⏩There are many problems we might be facing during and after concreting.
*To produce high quality
concrete we must take some precautions to avoid
those common problems during concreting. In this
article, we will discuss on common concrete
problems and how to prevent them.
A) BLEEDING:
Bleeding refers to as a tendency of water to appear on the top surface of concrete after finishing. Due to bleeding some measure of water (with sand particles and other cementing materials) appears at the surface of the concrete.
*Following precautions should be taken to reduce
bleeding in concrete.
1. Design the mix appropriately.
2. Include least water content in the mix.
3. Use greater amount of cement content.
4. Use greater amount of fine particles.
5. Utilize a little measure of air entraining
admixture.
B) SEGREGATION:
Segregation means separation of coarse aggregates from the concrete surface due to poor compaction.
It is generally seen in the plastic stage of concrete.
As a result honeycomb, laitance, scaling, porous
layer, bond failure etc. can be formed in concrete.
Following precautions should be adopted to prevent segregation in concrete.
1. Design the mix appropriately.
2. Never use excessive water content.
3. Take care of handling, placing, and proper
compaction of concrete.
4. Do not allow the concrete to be dropped from more heights.
5. Use air entraining admixture.
6. Keep the formwork to be watertight.
C) LAITANCE:
The appearance of cement-sand particles on the
surface of freshly placed concrete is known as
laitance. It is mainly occurred due to the bad effect of bleeding and segregation of concrete. The bond between subsequent layers of concrete becomes
weaker and as a result, laitance is developed.
Following precautions can be taken to stop the
occurrence of laitance in concrete.
1. Clay, dust, silt content etc should be removed
before mixing the concrete.
2. Water-cement ratio should be maintained
properly.
3. Water should not be sprayed on the concrete
surface during finishing work.
4. Use well graded fine aggregates in the mix.
5. Add little amount of water reducing admixture in the concrete mix.
D) SCALING:
Scaling is the physical deterioration of concrete in
which the surface layer of concrete broke down,
pitted or flaked away. Due to this effect concrete
surface becomes worse. Scaling can be prevented
by taking same precautions adopted for laitance.
E) PLASTIC SHRINKAGE CRACKS:
When the evaporation rate of water mixed in the
concrete is greater than the bleed water of concrete,
plastic shrinkage cracks are developed on the
surface of the concrete. Basically, this type of
cracks occurs in very hot climate.
F) DUSTING:
Dusting can be prevented by taking following
precautions.
1. Maintain a suitable water/cement ratio in the
concrete.
2. Utilize dust free aggregates in the mix.
3. Guarantee appropriate hydration of concrete.
4. Avoid early surface finishing of concrete.
@ethioengineers1
PREVENTION
⏩There are many problems we might be facing during and after concreting.
*To produce high quality
concrete we must take some precautions to avoid
those common problems during concreting. In this
article, we will discuss on common concrete
problems and how to prevent them.
A) BLEEDING:
Bleeding refers to as a tendency of water to appear on the top surface of concrete after finishing. Due to bleeding some measure of water (with sand particles and other cementing materials) appears at the surface of the concrete.
*Following precautions should be taken to reduce
bleeding in concrete.
1. Design the mix appropriately.
2. Include least water content in the mix.
3. Use greater amount of cement content.
4. Use greater amount of fine particles.
5. Utilize a little measure of air entraining
admixture.
B) SEGREGATION:
Segregation means separation of coarse aggregates from the concrete surface due to poor compaction.
It is generally seen in the plastic stage of concrete.
As a result honeycomb, laitance, scaling, porous
layer, bond failure etc. can be formed in concrete.
Following precautions should be adopted to prevent segregation in concrete.
1. Design the mix appropriately.
2. Never use excessive water content.
3. Take care of handling, placing, and proper
compaction of concrete.
4. Do not allow the concrete to be dropped from more heights.
5. Use air entraining admixture.
6. Keep the formwork to be watertight.
C) LAITANCE:
The appearance of cement-sand particles on the
surface of freshly placed concrete is known as
laitance. It is mainly occurred due to the bad effect of bleeding and segregation of concrete. The bond between subsequent layers of concrete becomes
weaker and as a result, laitance is developed.
Following precautions can be taken to stop the
occurrence of laitance in concrete.
1. Clay, dust, silt content etc should be removed
before mixing the concrete.
2. Water-cement ratio should be maintained
properly.
3. Water should not be sprayed on the concrete
surface during finishing work.
4. Use well graded fine aggregates in the mix.
5. Add little amount of water reducing admixture in the concrete mix.
D) SCALING:
Scaling is the physical deterioration of concrete in
which the surface layer of concrete broke down,
pitted or flaked away. Due to this effect concrete
surface becomes worse. Scaling can be prevented
by taking same precautions adopted for laitance.
E) PLASTIC SHRINKAGE CRACKS:
When the evaporation rate of water mixed in the
concrete is greater than the bleed water of concrete,
plastic shrinkage cracks are developed on the
surface of the concrete. Basically, this type of
cracks occurs in very hot climate.
F) DUSTING:
Dusting can be prevented by taking following
precautions.
1. Maintain a suitable water/cement ratio in the
concrete.
2. Utilize dust free aggregates in the mix.
3. Guarantee appropriate hydration of concrete.
4. Avoid early surface finishing of concrete.
@ethioengineers1
👍1
☑️difference between king post and queen post
➡️A queen post is a tension member in a truss that can span longer openings than a king post truss.
A queen post truss is typically a vertical upright with two triangles either side.
➡️A king post uses one central supporting post, whereas the queen post truss uses two. Even though it is a tension member, rather than a compression member, they are commonly still called a post.
A king post truss is typically used for short spans. ...
@ethioengineers1
➡️A queen post is a tension member in a truss that can span longer openings than a king post truss.
A queen post truss is typically a vertical upright with two triangles either side.
➡️A king post uses one central supporting post, whereas the queen post truss uses two. Even though it is a tension member, rather than a compression member, they are commonly still called a post.
A king post truss is typically used for short spans. ...
@ethioengineers1
➡️ስለ Load Combination በ ኣዲሱ የ EBCS ኮድ ኣብረን እንይ
.
Combo 1= DL + LL
Combo 2= 1.35DL + 1.5LL
Combo 3= DL + 0.3LL + EQx
Combo 4= DL + 0.3LL - EQx
Combo 5= DL + 0.3LL + EQy
Combo 6= DL + 0.3LL - EQy
Combo 7= max( Combo 2 up to 6)
.
.
ሁሌ ግን ኢሄ ነው ማለት አይደለም፡፡ ለምሳሌ 0.3LL የሚለው
ህንፃውን የምንጠቀመው ለDomestic/residential purpose
ከሆነ ነው፡፡ Shop ከሆነ 0.6LL storage ከሆነ ደሞ 0.8LL
ይሆናል፡፡ ከዚህም በተጨማሪ ሁሉም ፎርሙላ ላይ የተለያዩ
ኮንዲሽኖች ስላሉ እነሱን ማየት ያስፈልጋል፡፡ መገኛቸውም EBCS
EN 1990: 2014 ከ Equation 6.9 እስከ 6.16 ነው፡፡
ፎርሙላዎቹ ውስጥ የሚገቡትን variable ለማግኘት ደሞ
check the Annex part እዩት።
.
combination ሰባት ነው ዘጠኝ ነው ስላልኩት ደሞ ብዙዎች
Earth Quakeም እያለ በሁለትና በሶስት Combination ሲሰሩ
ስላየው ነው፡፡ እንጂ ግዴታ 7 ወይ ምናምን መሆን የለበትም፡፡
ለምሳሌ Serviceability ብቻ ኮንሲደር ካደረግን አንድ ኮምቦ //
ማለትም DL+LL// ሊበቃ ይችላል፡፡ ፅሁፉ ግልፅ ስላልሆነና
ወዳልሆነ አቅጣጫ እንዳይወሰድ አንስቼዋለው፡፡
@ethioengineers1
.
Combo 1= DL + LL
Combo 2= 1.35DL + 1.5LL
Combo 3= DL + 0.3LL + EQx
Combo 4= DL + 0.3LL - EQx
Combo 5= DL + 0.3LL + EQy
Combo 6= DL + 0.3LL - EQy
Combo 7= max( Combo 2 up to 6)
.
.
ሁሌ ግን ኢሄ ነው ማለት አይደለም፡፡ ለምሳሌ 0.3LL የሚለው
ህንፃውን የምንጠቀመው ለDomestic/residential purpose
ከሆነ ነው፡፡ Shop ከሆነ 0.6LL storage ከሆነ ደሞ 0.8LL
ይሆናል፡፡ ከዚህም በተጨማሪ ሁሉም ፎርሙላ ላይ የተለያዩ
ኮንዲሽኖች ስላሉ እነሱን ማየት ያስፈልጋል፡፡ መገኛቸውም EBCS
EN 1990: 2014 ከ Equation 6.9 እስከ 6.16 ነው፡፡
ፎርሙላዎቹ ውስጥ የሚገቡትን variable ለማግኘት ደሞ
check the Annex part እዩት።
.
combination ሰባት ነው ዘጠኝ ነው ስላልኩት ደሞ ብዙዎች
Earth Quakeም እያለ በሁለትና በሶስት Combination ሲሰሩ
ስላየው ነው፡፡ እንጂ ግዴታ 7 ወይ ምናምን መሆን የለበትም፡፡
ለምሳሌ Serviceability ብቻ ኮንሲደር ካደረግን አንድ ኮምቦ //
ማለትም DL+LL// ሊበቃ ይችላል፡፡ ፅሁፉ ግልፅ ስላልሆነና
ወዳልሆነ አቅጣጫ እንዳይወሰድ አንስቼዋለው፡፡
@ethioengineers1
🚧በ 1 ሜ ^ 3 ውስጥ የአሸዋ ፣ኮንክሪት እና የሲሚንቶ መጠን እንዴት calculate እናደርጋለን ? take C-20 ኮንክሪት
መልስ፨
*⃣ 1 ሜ ^ 3 ኮንክሪት ከተሰጠን ምሳሌ የ C-20 ድብልቅ ዲዛይን (1 :2 :3) ነው
➡️በመጀመሪያ add up 1 + 2 + 3 = 6
🚧1 ሲሚንቶ,2 አሸዋ,3 ጠጠር ማለት ነው
☑️የአሸዋውን መጠን ለማስላት
1 * 2/6 = 2/6 ሜትር ^ 3 = 0.33 ሜ^ 3
☑️የጠጠር መጠን ለማስላት
1 * 3/6 = 0.5 ሜትር ^ 3
☑️የሲሚንቶውን መጠን ለማስላት
1 * 1/6 = 0.167m ^ 3
*⃣ሲሚንትን በቁጥር ለማስላት
የአንድ ሲሚንቶ bag 0.036m ^ 3 ነው ስለሆነም የሲሚንቶውን ብዛት በሲሚንቶ ከረጢት መጠን እናካፍላለን።
የሲሚንቶ bag = 0.167 / 0.036 = 4.6
ስለዚህ 5 bag ሲሚንቶ እንጠቀማለን
@ethioengineers1
መልስ፨
*⃣ 1 ሜ ^ 3 ኮንክሪት ከተሰጠን ምሳሌ የ C-20 ድብልቅ ዲዛይን (1 :2 :3) ነው
➡️በመጀመሪያ add up 1 + 2 + 3 = 6
🚧1 ሲሚንቶ,2 አሸዋ,3 ጠጠር ማለት ነው
☑️የአሸዋውን መጠን ለማስላት
1 * 2/6 = 2/6 ሜትር ^ 3 = 0.33 ሜ^ 3
☑️የጠጠር መጠን ለማስላት
1 * 3/6 = 0.5 ሜትር ^ 3
☑️የሲሚንቶውን መጠን ለማስላት
1 * 1/6 = 0.167m ^ 3
*⃣ሲሚንትን በቁጥር ለማስላት
የአንድ ሲሚንቶ bag 0.036m ^ 3 ነው ስለሆነም የሲሚንቶውን ብዛት በሲሚንቶ ከረጢት መጠን እናካፍላለን።
የሲሚንቶ bag = 0.167 / 0.036 = 4.6
ስለዚህ 5 bag ሲሚንቶ እንጠቀማለን
@ethioengineers1
👍2
👁🗨# 300 ካሬ ሜትር × 1 ሜትር ግድግዳ ለመገንባት ስንት hollow blocks ያስፈልጋል??
hint-ሁለት ዓይነት ብሎኮች ጥቅም ላይ ይውላሉ (400 × 200 × 200 ሚሜ) እና (200 × 100 × 100 ሚሜ)
⬇️ባለ 400 * 200 * 200 ሚሜ የሚጠቀሙ ከሆነ
= 300 ÷ (0.4 * 0.1)
= 3750 ብሎኬት ብዛት ያስፈልጋል
[እነዚህ ሀለ 20 ብሎኬቶች ለውጫዊ ግድግዳ ጥቅም ለይ ይውላሉ ].
⏬ባለ 200 * 100 * 100 ሚሜ የሚጠቀሙ ከሆነ
= 300 ÷ (0.2 * 0.1)
= 15000 የብሎኬት ብዛት ያስፈልጋል
( እነዚህ ሀለ 10 ብሎኬቶች ለፓርትሽን ጥቅም ለይ ይውላሉ)
@ethioengineers1
hint-ሁለት ዓይነት ብሎኮች ጥቅም ላይ ይውላሉ (400 × 200 × 200 ሚሜ) እና (200 × 100 × 100 ሚሜ)
⬇️ባለ 400 * 200 * 200 ሚሜ የሚጠቀሙ ከሆነ
= 300 ÷ (0.4 * 0.1)
= 3750 ብሎኬት ብዛት ያስፈልጋል
[እነዚህ ሀለ 20 ብሎኬቶች ለውጫዊ ግድግዳ ጥቅም ለይ ይውላሉ ].
⏬ባለ 200 * 100 * 100 ሚሜ የሚጠቀሙ ከሆነ
= 300 ÷ (0.2 * 0.1)
= 15000 የብሎኬት ብዛት ያስፈልጋል
( እነዚህ ሀለ 10 ብሎኬቶች ለፓርትሽን ጥቅም ለይ ይውላሉ)
@ethioengineers1
🚧ስለ lap length , Development length,Anchorage length ትንሽ እንይ ።
👉ላፕ ሌንግዝ (lap length) - ተፈላጊ የብረት (ፌሮ) ርዝመት ውጥረትን (stresses) ከአንድ ብረት ወደሌላ ብረት የሚተላለፍበት ነው
*⃣የሚፈለገው የንድፍ ርዝመት የሚሰጥ የሁለት አሞሌዎች ተደራራቢ ርዝመት ነው። በ RCC መዋቅር ውስጥ የንድፍ ርዝመትን ለመሥራት የአንድ አሞሌ ርዝመት በቂ ካልሆነ ፣ መታጠፍ ይከናወናል።
20 ሜትር ከፍታ ያለው ሕንፃ መገንባት ያስፈልገናል እንበል። ግን 20 ሜትር ነጠላ አሞሌ የለም
በገበያ ውስጥ። የሬባሬ ከፍተኛው ርዝመት
በገበያው ውስጥ ብዙውን ጊዜ 12 ሜትር ነው ፣ ስለሆነም 20 ሜትር ባር ለማግኘት ሁለት የ 12 ሜትር አሞሌዎችን መቀላቀል አለብን።
👉ደቨሎፕመንት ሌንግዝ (Development length) -ተፈላጊ
የብረት ርዝመት ውጥረትን (stresses) ከብረቱ ወደ ኮንክሪቱ የሚተላለፍበት
👉አንኮሬጅ ሌንግዝ (Anchorage length) - ይህ ርዝመት
አይነት በቂ የሆነ ደቨሎፕመንት ሌንግዝ (development
length ) በሌለባቸው በ Support / fixed ends ላይ provide የምናረገው ርዝመት ነው:: .
@ethioengineers1
👉ላፕ ሌንግዝ (lap length) - ተፈላጊ የብረት (ፌሮ) ርዝመት ውጥረትን (stresses) ከአንድ ብረት ወደሌላ ብረት የሚተላለፍበት ነው
*⃣የሚፈለገው የንድፍ ርዝመት የሚሰጥ የሁለት አሞሌዎች ተደራራቢ ርዝመት ነው። በ RCC መዋቅር ውስጥ የንድፍ ርዝመትን ለመሥራት የአንድ አሞሌ ርዝመት በቂ ካልሆነ ፣ መታጠፍ ይከናወናል።
20 ሜትር ከፍታ ያለው ሕንፃ መገንባት ያስፈልገናል እንበል። ግን 20 ሜትር ነጠላ አሞሌ የለም
በገበያ ውስጥ። የሬባሬ ከፍተኛው ርዝመት
በገበያው ውስጥ ብዙውን ጊዜ 12 ሜትር ነው ፣ ስለሆነም 20 ሜትር ባር ለማግኘት ሁለት የ 12 ሜትር አሞሌዎችን መቀላቀል አለብን።
👉ደቨሎፕመንት ሌንግዝ (Development length) -ተፈላጊ
የብረት ርዝመት ውጥረትን (stresses) ከብረቱ ወደ ኮንክሪቱ የሚተላለፍበት
👉አንኮሬጅ ሌንግዝ (Anchorage length) - ይህ ርዝመት
አይነት በቂ የሆነ ደቨሎፕመንት ሌንግዝ (development
length ) በሌለባቸው በ Support / fixed ends ላይ provide የምናረገው ርዝመት ነው:: .
@ethioengineers1
👍1