There are four types of cover block or Spacers!
1. Slab Cover
2. Column & Beam Cover
3. Foundation Cover
4. Piling Cover
Various Photographs of Cover Blocks according to it’s type, ⬇️⬇️⬇️⬇️⬇️
1. Slab Cover
2. Column & Beam Cover
3. Foundation Cover
4. Piling Cover
Various Photographs of Cover Blocks according to it’s type, ⬇️⬇️⬇️⬇️⬇️
👍1
👉 List of Drawings in order of Priority
=================
★ Conceptual Drawings
• Plans
• Elevations
• Sections
• Views
★ Site Plans
• Site Analysis
★ Architectural Drawings
• Plans
• Sections
• Elevations
• Working Drawings
★ Structural Drawings
• Pits
• Footings
• Columns
• Beams
• Slabs
★ Electrical Drawings
• Electrical Layout
• Fire Alarms
★ Mechanical Drawings
• Mechanical layout
• HVAC (Heating Ventilation and Air conditioning) Layout
• Fire Sprinklers Layout
• Power Generation Layout
★ Plumbing Drawings
• Water Supply Layout (Hot and Cold Water supply)
• Water Sprinklers
★ Utility Drawings
• Drainage Layout
• Toilets
• Kitchen
★ Landscape Drawings
• Landscape Plans
• Type of Trees
• Shrubs
• Bushes
• Size of Canopy, seasons etc.
★ Interior Drawings
• Interior Design/Decoration
• Floor Plans
• Wall Elevations
• Ceiling Plan
• Electrical Layout
• Mechanical Layout
• Plumbing Layout
• Detailing
=================
★ Conceptual Drawings
• Plans
• Elevations
• Sections
• Views
★ Site Plans
• Site Analysis
★ Architectural Drawings
• Plans
• Sections
• Elevations
• Working Drawings
★ Structural Drawings
• Pits
• Footings
• Columns
• Beams
• Slabs
★ Electrical Drawings
• Electrical Layout
• Fire Alarms
★ Mechanical Drawings
• Mechanical layout
• HVAC (Heating Ventilation and Air conditioning) Layout
• Fire Sprinklers Layout
• Power Generation Layout
★ Plumbing Drawings
• Water Supply Layout (Hot and Cold Water supply)
• Water Sprinklers
★ Utility Drawings
• Drainage Layout
• Toilets
• Kitchen
★ Landscape Drawings
• Landscape Plans
• Type of Trees
• Shrubs
• Bushes
• Size of Canopy, seasons etc.
★ Interior Drawings
• Interior Design/Decoration
• Floor Plans
• Wall Elevations
• Ceiling Plan
• Electrical Layout
• Mechanical Layout
• Plumbing Layout
• Detailing
👉 ኣሁን ደሞ ስለ Foundation (መሠረት) ትንሽ እንበል...
.
✔Shallow Foundation-እነዚህን ፋውንዴሽኖች የምንጠቀመው አፈሩ ብዙም ሳይቆፈር በቅርብ ጥልቀት ጠንካራ የአፈር ሁኔታ ካለ ነው፡፡ ለመገንባት ትልልቅ ማሺኖች አያስፈልጉም ብዙ ችሎታም አይጠይቁም::
.
Spread/ Pad/ Isolated Footing - አንድ ኮለን ብቻ ነው
support የሚያደርጉት- የሚመጣውን ፎርስ eccentricity መሰረት በማድረግ circular/ rectangular or square የሆነ ቅርፅ ሊኖራቸው ይችላል፡፡ ያለፌሮ ሊገነቡ ይችላሉ ለምሳሌ ፓዱን slopped በማድረግ::
.
Combined Footing - ሁለትና ከዛ በላይ ኮለኖችን በአንድ ፓድ
support ለማድረግ ነው የምንጠቀምባቸው፡፡ እነዚህን
የምንጠቀመው ሁለት ተቀራራቢ Isolated Footing ካሉ ሁለቱን
አንድ ላይ combine በማድረግ ኮንክሪትም ፌሮም ሴቭ ማድረግ
እንችላለን፡፡ በተጨማሪም isolated ለመጠቀም property
limit ካለ እነዚህን መጠቀም እንችላለን:: 2 አይነት Combined
Footing አሉ- እነርሱም ፡-
.
1. Rectangular Combined Footing – ይህንን የምንጠቀመው ሁለቱም ኮለኖች የሚሸከሙት ሎድ ተቀራራቢ
ወይም እኩል ከሆነ ወይም ትራፖዞይዳል ለመጠቀም የስፋት
ገደብ ካለ ነው።
.
2. Trapezoidal Combined Footing - ሁለቱ ኮለኖች የሚሸከሙት ሎድ ልዩነት የተጋነነ ከሆነ ነው።
.
Strap/ Cantilever Footing - ሁለት ፓዶችን በቢም በማያያዝ
ሎድ ከአንዱ ፓድ ወደሌላው እንዲተላለፍ ማድረግ እንችላለን፡፡
ቢሙ በራሱ ሎድ አይሸከምም ሎድ ያስተላልፋል
እንጂ…….እነዚህን የምንጠቀመው ኮለኖቹ ከ7 ሜትር በላይ ከተራራቁ combined footing ብንጠቀም ኢኮኖሚካል ስለማንሆን ፓዶቹን በቢም በማያያዝ እንደ combined footing
ልንጠቀምባቸው እንችላለን፡፡
.
Mat/ Raft foundation - እነዚህን የምንጠቀመው መሬቱ
የመሸከም አቅሙ ትንሽ ከሆነና spread footing ስንጠቀም
የህንጸውን ስፋት ከ50 ፐርሰንት በላይ ከሸፈኑት ነው ….. አንዳንዴ
ግን spread footing ከ50 ፐርሰንት በላይ ቢሸፍኑትም ለ
spread footing negative reinforcement ስለማንጠቀም ከ Mat ይልቅ ኢኮኖሚካል ሊሆኑ ይችላሉ - ምክንያቱም Mat
negative & positive reinforcement ይጠቀማሉ፡፡ ማን ኢኮኖሚካል እንደሆነ ቼክ ማድረግ የኢንጅነሩ ድርሻ ነው፡፡
.
👉ሼር በማድረግ ለሁሉም ያጋሩ።
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
.
✔Shallow Foundation-እነዚህን ፋውንዴሽኖች የምንጠቀመው አፈሩ ብዙም ሳይቆፈር በቅርብ ጥልቀት ጠንካራ የአፈር ሁኔታ ካለ ነው፡፡ ለመገንባት ትልልቅ ማሺኖች አያስፈልጉም ብዙ ችሎታም አይጠይቁም::
.
Spread/ Pad/ Isolated Footing - አንድ ኮለን ብቻ ነው
support የሚያደርጉት- የሚመጣውን ፎርስ eccentricity መሰረት በማድረግ circular/ rectangular or square የሆነ ቅርፅ ሊኖራቸው ይችላል፡፡ ያለፌሮ ሊገነቡ ይችላሉ ለምሳሌ ፓዱን slopped በማድረግ::
.
Combined Footing - ሁለትና ከዛ በላይ ኮለኖችን በአንድ ፓድ
support ለማድረግ ነው የምንጠቀምባቸው፡፡ እነዚህን
የምንጠቀመው ሁለት ተቀራራቢ Isolated Footing ካሉ ሁለቱን
አንድ ላይ combine በማድረግ ኮንክሪትም ፌሮም ሴቭ ማድረግ
እንችላለን፡፡ በተጨማሪም isolated ለመጠቀም property
limit ካለ እነዚህን መጠቀም እንችላለን:: 2 አይነት Combined
Footing አሉ- እነርሱም ፡-
.
1. Rectangular Combined Footing – ይህንን የምንጠቀመው ሁለቱም ኮለኖች የሚሸከሙት ሎድ ተቀራራቢ
ወይም እኩል ከሆነ ወይም ትራፖዞይዳል ለመጠቀም የስፋት
ገደብ ካለ ነው።
.
2. Trapezoidal Combined Footing - ሁለቱ ኮለኖች የሚሸከሙት ሎድ ልዩነት የተጋነነ ከሆነ ነው።
.
Strap/ Cantilever Footing - ሁለት ፓዶችን በቢም በማያያዝ
ሎድ ከአንዱ ፓድ ወደሌላው እንዲተላለፍ ማድረግ እንችላለን፡፡
ቢሙ በራሱ ሎድ አይሸከምም ሎድ ያስተላልፋል
እንጂ…….እነዚህን የምንጠቀመው ኮለኖቹ ከ7 ሜትር በላይ ከተራራቁ combined footing ብንጠቀም ኢኮኖሚካል ስለማንሆን ፓዶቹን በቢም በማያያዝ እንደ combined footing
ልንጠቀምባቸው እንችላለን፡፡
.
Mat/ Raft foundation - እነዚህን የምንጠቀመው መሬቱ
የመሸከም አቅሙ ትንሽ ከሆነና spread footing ስንጠቀም
የህንጸውን ስፋት ከ50 ፐርሰንት በላይ ከሸፈኑት ነው ….. አንዳንዴ
ግን spread footing ከ50 ፐርሰንት በላይ ቢሸፍኑትም ለ
spread footing negative reinforcement ስለማንጠቀም ከ Mat ይልቅ ኢኮኖሚካል ሊሆኑ ይችላሉ - ምክንያቱም Mat
negative & positive reinforcement ይጠቀማሉ፡፡ ማን ኢኮኖሚካል እንደሆነ ቼክ ማድረግ የኢንጅነሩ ድርሻ ነው፡፡
.
👉ሼር በማድረግ ለሁሉም ያጋሩ።
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
👍1
👉አስቲ ዛሬ ደሞ ስለ Cohesion ትንሽ ልበል....
.
Cohesion – soil ፓርቲክሎች አንድ ላይ እንዲጣበቁ የሚያደርግ ፎርስ ነው የሚገለፀውም በ Kilo Newton ነው::
.
Angle of Internal friction - አንድ soil ፓርቲክልን ብንወስድ
በራሱ ክብደት ወይም በሌሎች ፓርቲክሎች ምክንያት በሚፈጠር
ፍትጊያ (friction) ምክንያት Horizontal (H) እና Vertical
(V) ሎድ ተፅእኖ ውስጥ ይወድቃል - እነዚህን ሎዶች
የሚቋቋመው በአካባቢው ያሉት ፓርቲክሎች Normal እና
Shear (T) react ስለሚያደርጉ ነው… የነዚህ ፎርሶች
Resultant (R) ከ ‘N’ ጋር የሚሰራው አንግል ነው Angle of
internal friction.
.
Angle of Wall friction – እንደ angle of internal friction
ሆኖ ነገር ግን soil ፓርቲክሉና Slip ፕሌኑ ከተለያዩ ማቴሪያሎች
ከተሰሩ angle of wall friction ይባላል፡፡ Lateral Earth
Pressure ላይ Coulomb Method ይህንን የአንግል አይነት
ይጠቀማል::
.
Cohesion እና Angle of internal friction ትልቅ ነው ማለት Bearing capacity ትልቅ ነው ማለት ነው::
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
.
Cohesion – soil ፓርቲክሎች አንድ ላይ እንዲጣበቁ የሚያደርግ ፎርስ ነው የሚገለፀውም በ Kilo Newton ነው::
.
Angle of Internal friction - አንድ soil ፓርቲክልን ብንወስድ
በራሱ ክብደት ወይም በሌሎች ፓርቲክሎች ምክንያት በሚፈጠር
ፍትጊያ (friction) ምክንያት Horizontal (H) እና Vertical
(V) ሎድ ተፅእኖ ውስጥ ይወድቃል - እነዚህን ሎዶች
የሚቋቋመው በአካባቢው ያሉት ፓርቲክሎች Normal እና
Shear (T) react ስለሚያደርጉ ነው… የነዚህ ፎርሶች
Resultant (R) ከ ‘N’ ጋር የሚሰራው አንግል ነው Angle of
internal friction.
.
Angle of Wall friction – እንደ angle of internal friction
ሆኖ ነገር ግን soil ፓርቲክሉና Slip ፕሌኑ ከተለያዩ ማቴሪያሎች
ከተሰሩ angle of wall friction ይባላል፡፡ Lateral Earth
Pressure ላይ Coulomb Method ይህንን የአንግል አይነት
ይጠቀማል::
.
Cohesion እና Angle of internal friction ትልቅ ነው ማለት Bearing capacity ትልቅ ነው ማለት ነው::
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
👉የኢሊቬሽን አለመንትቶች...
.
ከርቮች ላይ ያለውን super elevation ፐርሰንት ካወቅን በኋላ ሱፐር ኢሊቬሽኑን ሙሉ ከርቩ ላይ ስለማናደርግ የት Station ላይ እንደሚገባና እንደሚወጣ ማወቅ አለብን፡፡ በተጨማሪም ሙሉውን
ያገኘነውን ፐርሰንት አንጠቀምም - መጀመሪያ ከዜሮ ይጀምርና ቀስ
እያለ ሄዶ ሙሉ ሱፐር ኢሊቬሽን ይሆናል - የተወሰነ ርቀት
ሙሉውን ከቀጠለ በኋላ እንደገና ቀሰ እያለ ወደ ዜሮ ይመለስና
የኖርማል አስፓልቱን slope ይይዛል፡፡ ካልኩሌት አድርገን ወይም ኤግል ፖይንት እራሱ ካልኩሌት አድርጎ እስቴሽኖቹን ማወቅ እንችላለን፡፡ ያገኘናቸውንም እስቴሽኖች ሳይት ላይ ሱፐር
ኢሊቬሽኑን ስናስቀምጥ እንጠቀምባቸዋለን፡፡
.
*ኢለመንቶቹ በዛ ስለሚሉ እነዚህን እዚ ላይ መዘርዘር አስቸጋሪ
ስለሆነ የተወሰኑትን በፎቶ አስቀምጠናቸዋል ቀሪዎቹን ከERA – Geometric Design Manual ላይ አንብቧቸው፡፡
ኤግል ፖይንት ላይ የምናስገባቸው SR, TR, X, Y ናቸው፡፡
.
ከርቮች ላይ ያለውን super elevation ፐርሰንት ካወቅን በኋላ ሱፐር ኢሊቬሽኑን ሙሉ ከርቩ ላይ ስለማናደርግ የት Station ላይ እንደሚገባና እንደሚወጣ ማወቅ አለብን፡፡ በተጨማሪም ሙሉውን
ያገኘነውን ፐርሰንት አንጠቀምም - መጀመሪያ ከዜሮ ይጀምርና ቀስ
እያለ ሄዶ ሙሉ ሱፐር ኢሊቬሽን ይሆናል - የተወሰነ ርቀት
ሙሉውን ከቀጠለ በኋላ እንደገና ቀሰ እያለ ወደ ዜሮ ይመለስና
የኖርማል አስፓልቱን slope ይይዛል፡፡ ካልኩሌት አድርገን ወይም ኤግል ፖይንት እራሱ ካልኩሌት አድርጎ እስቴሽኖቹን ማወቅ እንችላለን፡፡ ያገኘናቸውንም እስቴሽኖች ሳይት ላይ ሱፐር
ኢሊቬሽኑን ስናስቀምጥ እንጠቀምባቸዋለን፡፡
.
*ኢለመንቶቹ በዛ ስለሚሉ እነዚህን እዚ ላይ መዘርዘር አስቸጋሪ
ስለሆነ የተወሰኑትን በፎቶ አስቀምጠናቸዋል ቀሪዎቹን ከERA – Geometric Design Manual ላይ አንብቧቸው፡፡
ኤግል ፖይንት ላይ የምናስገባቸው SR, TR, X, Y ናቸው፡፡
❤2
✔Points...
The d/n b/n spacer and concrete cover is that,,
Spacer is used to know the thickness of concrete cover It produced before concrete work of column,beam or slab starts or during reinforcements work.
No more attention given to Quality and mix ratio.
Care only given to thickness of the spacer.
But concrete cover is amass of concrete used to cover the reinforcement bar.
Quality, mix ratio and other important considerable measures taken during concrete covering work.
The d/n b/n spacer and concrete cover is that,,
Spacer is used to know the thickness of concrete cover It produced before concrete work of column,beam or slab starts or during reinforcements work.
No more attention given to Quality and mix ratio.
Care only given to thickness of the spacer.
But concrete cover is amass of concrete used to cover the reinforcement bar.
Quality, mix ratio and other important considerable measures taken during concrete covering work.
❤1👍1
እስቲ ኣሁን ደሞ ስለ Support ትንሽ ልበላቹ....
.
፩) FIXED Support = በፎርስ ምክንያት የሚመጡ Moment, Shear እና Horizontal Force support የሚያደርግ supporting system ነው፡፡ ስለዚህ Analyze ስናረግ የምንፈልጋቸው Reaction ብዛት 3 ነው (M,V & Fh) Reactive ፎርሶቹ Displacement ስለሚከላከሉ Displacement = 0…. Reactive ሞመንቱ Rotation ስለሚከላከል Rotation = 0
.
፪) PIN Support = Shear እና Horizontal Force የሚከላከል ሲስተም ነው፡፡ ሞመንት አይቋቋሙም ሰለዚህ Roation አለ - ግን Displacement ዜሮ ነው፡፡
.
፫) ROLLER Support
Vertical Force ብቻ ነው የሚሸከመው፡፡ Rotation አለ but Displacement = 0
👉 PLEASE SHARE
.
፩) FIXED Support = በፎርስ ምክንያት የሚመጡ Moment, Shear እና Horizontal Force support የሚያደርግ supporting system ነው፡፡ ስለዚህ Analyze ስናረግ የምንፈልጋቸው Reaction ብዛት 3 ነው (M,V & Fh) Reactive ፎርሶቹ Displacement ስለሚከላከሉ Displacement = 0…. Reactive ሞመንቱ Rotation ስለሚከላከል Rotation = 0
.
፪) PIN Support = Shear እና Horizontal Force የሚከላከል ሲስተም ነው፡፡ ሞመንት አይቋቋሙም ሰለዚህ Roation አለ - ግን Displacement ዜሮ ነው፡፡
.
፫) ROLLER Support
Vertical Force ብቻ ነው የሚሸከመው፡፡ Rotation አለ but Displacement = 0
👉 PLEASE SHARE
Bearing strength of mtrl
.
🏤 bearing failure occurs when z load causes bearing stress in z mtrl to exced its bearing strength.
🏤 compressibe failure is sudden and catastropic
🏤 buckling failure occur in long and slender member subjected to axial compressive
🏤 crushing failures occurs in non slender members
.
🏤 bearing failure occurs when z load causes bearing stress in z mtrl to exced its bearing strength.
🏤 compressibe failure is sudden and catastropic
🏤 buckling failure occur in long and slender member subjected to axial compressive
🏤 crushing failures occurs in non slender members
.....con't
1. Linearly plastic analysis is based on Robert Hooks law which states zat zer is a linear relationship between stress and strain of a material. Modules of elasticity is equal to stress divided by strain.
2. Linear elastic analysis with moment redistribution states zat X-section can't yield simply by implying z maximum moment but zey distribute z moment beyond z first yield or after first plastic hinge formation towards less loaded x-sections.
3. Plastic analysis is based on z plastic stage of moment or it is similar with zat of linear elastic analysis but zis is after a formation of plastic hinge. In indeterminate structures zer will be more zan two plastic hinge zat can form collapse mechanism.
4. Non linear analysis can be categorized as geometric non linearity and material non linearity.
4.1 geometric non linearity is a property which is related to deformation of material with load. E.g
p - delta effect or second order effect
4.2 material non linearity is due to non uniform or non linear relationship of stress and strain of material
.
What is Plastic hing?
Ans.. Plastic hinge is a yielded zone which is yielded by an application of higher stress beyond its elastic limit( after first yielding)
1. Linearly plastic analysis is based on Robert Hooks law which states zat zer is a linear relationship between stress and strain of a material. Modules of elasticity is equal to stress divided by strain.
2. Linear elastic analysis with moment redistribution states zat X-section can't yield simply by implying z maximum moment but zey distribute z moment beyond z first yield or after first plastic hinge formation towards less loaded x-sections.
3. Plastic analysis is based on z plastic stage of moment or it is similar with zat of linear elastic analysis but zis is after a formation of plastic hinge. In indeterminate structures zer will be more zan two plastic hinge zat can form collapse mechanism.
4. Non linear analysis can be categorized as geometric non linearity and material non linearity.
4.1 geometric non linearity is a property which is related to deformation of material with load. E.g
p - delta effect or second order effect
4.2 material non linearity is due to non uniform or non linear relationship of stress and strain of material
.
What is Plastic hing?
Ans.. Plastic hinge is a yielded zone which is yielded by an application of higher stress beyond its elastic limit( after first yielding)
👉ቅደመ ክፍያ
▶ADVANCE PAYMENT
.
➡በልዩ ሁኔታ ለፕሮጀክቱ የተዘጋጀው የኮንትራት ውል ቅድሚያ ክፍያ/advance payment/ የሚፈቅድ ከሆነ ስራ ተቌራጩ ስራውን ለማሰጀመር ማሽነሪ እና የግንባታ ግብአት ለማስገባት በሚጠየቅ ግዜ የሚከፈል ክፍያ ሲሆን ከዚህ በታች የተጠቀሱትን ቅድመ ሁኔታዎች መሟላት ይኖርባቸዋል
1) ቅድመ ክፍያው ስራ ተቋራጩን የሰራ ውሉን ተፈፃሚ የሚያደርግበትን የጠቅላላ ግምት ነው።
2)በልዩ ሁኔታ የተዘጋጀው የኮንትራት ውል(Special condition of contract) የቅድሚያ ክፍያውን መጠን መግለፅ ሲኖርበት ነገር ግን ከጠቅላላ ፕሮጀክት ወጪ ሰላሳ (30%)ፐርሰንት መብለጥ የለበትም።
3) ውል ተፈፅሞ ፕሮጀክት ሳይት ርክክብ ሳይደረግ ቅድሚያ ክፍያ አይሰጠውም።
4) ስራ ተቋራጩ ለሚወስደው ክፍያ ዋስትና ቦንድ ሊያቀርብ ይገባል።
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
▶ADVANCE PAYMENT
.
➡በልዩ ሁኔታ ለፕሮጀክቱ የተዘጋጀው የኮንትራት ውል ቅድሚያ ክፍያ/advance payment/ የሚፈቅድ ከሆነ ስራ ተቌራጩ ስራውን ለማሰጀመር ማሽነሪ እና የግንባታ ግብአት ለማስገባት በሚጠየቅ ግዜ የሚከፈል ክፍያ ሲሆን ከዚህ በታች የተጠቀሱትን ቅድመ ሁኔታዎች መሟላት ይኖርባቸዋል
1) ቅድመ ክፍያው ስራ ተቋራጩን የሰራ ውሉን ተፈፃሚ የሚያደርግበትን የጠቅላላ ግምት ነው።
2)በልዩ ሁኔታ የተዘጋጀው የኮንትራት ውል(Special condition of contract) የቅድሚያ ክፍያውን መጠን መግለፅ ሲኖርበት ነገር ግን ከጠቅላላ ፕሮጀክት ወጪ ሰላሳ (30%)ፐርሰንት መብለጥ የለበትም።
3) ውል ተፈፅሞ ፕሮጀክት ሳይት ርክክብ ሳይደረግ ቅድሚያ ክፍያ አይሰጠውም።
4) ስራ ተቋራጩ ለሚወስደው ክፍያ ዋስትና ቦንድ ሊያቀርብ ይገባል።
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
COLUMN
column is a vertical compression member zar used to transfer z loads from intermediate floors and roofs towards z foundation.
TYPES OF COLUMN
A. Based on shape of cross section
1.L shaped
2.square
3.circular
B.based on lateral load resisting system ( bracing)
1.braced column:.able to carry horizontal or lateral loading like earth quick and wind load. Zer r different bracing like K bracing, X bracing, diagonal bracing....
2.unbraced column
C.based on sensitivity of P delta effect (second order effect)
1.sway column:. Is a column which shows a significant horizontal displacement. Mostly zis type of column has no bracing system
2. Non sway column:. Is a column having a lateral load resisting system and shows no lateral displacement
D. Based on load on z column
1.axially loaded column:. Carry pure axial load. Zey r columns with out eccentricity.
2.uniaxially loaded column:. Carry an axial load having eccentricity only in one axis (either along x or y)
3.biaxially loaded column:. Carry axial load having eccentricity in both direction.
E. Based on lateral support of bar
1.tied column:are column with longitudinal or main reinforcement supported by a ties having a particular spacing.
2. Spiral column:.a column with longitudinal or main reinforcement bar supported in a manner of helical spring
F. Based on length (slenderness)
1.short column:. a column with small or less slenderness ration. E.g pedestal column
2.long or slender column:. a column with hign slenderness ration.
G. based on material composition
1. Composit column:.a column cross sections in which composed of concrete and steel. In zis case steel is incased by concrete.
2. Infilled column:.a column type when concrete is poured in steel.
.
.
. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
column is a vertical compression member zar used to transfer z loads from intermediate floors and roofs towards z foundation.
TYPES OF COLUMN
A. Based on shape of cross section
1.L shaped
2.square
3.circular
B.based on lateral load resisting system ( bracing)
1.braced column:.able to carry horizontal or lateral loading like earth quick and wind load. Zer r different bracing like K bracing, X bracing, diagonal bracing....
2.unbraced column
C.based on sensitivity of P delta effect (second order effect)
1.sway column:. Is a column which shows a significant horizontal displacement. Mostly zis type of column has no bracing system
2. Non sway column:. Is a column having a lateral load resisting system and shows no lateral displacement
D. Based on load on z column
1.axially loaded column:. Carry pure axial load. Zey r columns with out eccentricity.
2.uniaxially loaded column:. Carry an axial load having eccentricity only in one axis (either along x or y)
3.biaxially loaded column:. Carry axial load having eccentricity in both direction.
E. Based on lateral support of bar
1.tied column:are column with longitudinal or main reinforcement supported by a ties having a particular spacing.
2. Spiral column:.a column with longitudinal or main reinforcement bar supported in a manner of helical spring
F. Based on length (slenderness)
1.short column:. a column with small or less slenderness ration. E.g pedestal column
2.long or slender column:. a column with hign slenderness ration.
G. based on material composition
1. Composit column:.a column cross sections in which composed of concrete and steel. In zis case steel is incased by concrete.
2. Infilled column:.a column type when concrete is poured in steel.
.
.
. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
....con't
Behaviour of tied and spiral column
Tied columns r mostly used column type of column in non seismic region( non earth quick area). In zis region occasionally we use spiral column if higher strength( ductility is required). In another case zis means we use spiral column in seismic zones mostly and zey can carry higher load before failure.
Advantages of lateral rebates
👉 tieng or supporting of longitudinal bar from buckling out or in ward.
👉 to support core of z concrete
👉 used as shear reinforcement for lateral loads.
👉 for the ductility of z column etc.
Behaviour of tied and spiral column
Tied columns r mostly used column type of column in non seismic region( non earth quick area). In zis region occasionally we use spiral column if higher strength( ductility is required). In another case zis means we use spiral column in seismic zones mostly and zey can carry higher load before failure.
Advantages of lateral rebates
👉 tieng or supporting of longitudinal bar from buckling out or in ward.
👉 to support core of z concrete
👉 used as shear reinforcement for lateral loads.
👉 for the ductility of z column etc.
Master Schedule vs Milestone Schedule
Project schedule, baseline schedule, master schedule, milestone schedule and work schedule are widely used concepts in the field of time management. Project teams create work schedules in order to understand what work will be completed in which period.
Basically, a project cannot be performed without a proper work schedule. Because scheduling establishes a system to manage the activities, resources, deliverables and the project goals in a timeline.
In project management, master schedule, project schedule and milestone schedule are three different schedules used for coordinating and tracking all of the different components of a project. Although each type of schedule plays an important role in completing a project on time and budget, they are different concepts.
In this article, we will discuss important time management concepts and their key differences.
For better understanding, let’s take a glance at the definitions.
Master Schedule, Milestone Schedule, Project Schedule
Before to start, let’s discuss the basic terms used in time management.
Milestone
According to PMBOK Guide, a milestone is “a significant event in the project usually completion of a major deliverable.”
∴Milestones have a fixed date but no duration.
Below are some examples of milestones in a project
Project Start and End
Start and Completion of each phase and/or discipline
Kick of Meeting
Site Handover
Sign of Contract
Schedule
A schedule represents the planned dates for performing activities and for meeting deliverables.
A schedule is a communication tool used to discuss what work needs to be done in order to complete the project.
Schedules are typically created at the beginning of a project and updated and reported regularly.
Project Scheduling Steps
An executable schedule can be created by following the project scheduling steps given below;
Creating and developing the Work Breakdown Structure (WBS) of the project
Defining work packages and major project deliverables
Defining the tasks
Defining relationships
Defining and assigning resources
Analyzing the critical path of the project
Development of the work breakdown structure (WBS) is one of the most important steps in scheduling. Because it creates a framework for a proper schedule.
Work packages are represented as the lowest level of detail within the WBS and the activities are grouped and listed under the work packages.
Activities are the actions which have a specific start date, end date, and duration. Relationships are the logic ties between the activities. They determine which activity will start or finish first in what type of logic.
Resources are materials, labor, and machinery required to perform the activities. Once they are estimated, they are assigned to the activities.
The last step is analyzing the schedule if it is realistic or not. You analyze and control the critical path of the schedule.
1. Milestone Schedule
A Milestone Schedule is a summary level schedule, which identifies the major project milestones.
Milestone planning focuses on milestones instead of activities. Major deliverables, significant events, contractual obligations, and the company’s strategic goals are demonstrated in milestone schedules.
Milestone schedules are one of the most important schedules that must be maintained and referred through the project life cycle. Simply put, a milestone schedule is a summary level schedule that helps the project team to review and track all the major project milestones that may exist during the execution of the project.
2. Master Schedule & Why is a Master Schedule Important?
A project manager’s primary responsibility is to complete the project on time and budget along with meeting the client’s requirements. Therefore scheduling the activities and resources efficiently plays a key role in any project’s success. The project master schedule is one of the most effective tools that help the project manager to perform his business.
Master Schedule is a summary level project schedule which includes the major p
Project schedule, baseline schedule, master schedule, milestone schedule and work schedule are widely used concepts in the field of time management. Project teams create work schedules in order to understand what work will be completed in which period.
Basically, a project cannot be performed without a proper work schedule. Because scheduling establishes a system to manage the activities, resources, deliverables and the project goals in a timeline.
In project management, master schedule, project schedule and milestone schedule are three different schedules used for coordinating and tracking all of the different components of a project. Although each type of schedule plays an important role in completing a project on time and budget, they are different concepts.
In this article, we will discuss important time management concepts and their key differences.
For better understanding, let’s take a glance at the definitions.
Master Schedule, Milestone Schedule, Project Schedule
Before to start, let’s discuss the basic terms used in time management.
Milestone
According to PMBOK Guide, a milestone is “a significant event in the project usually completion of a major deliverable.”
∴Milestones have a fixed date but no duration.
Below are some examples of milestones in a project
Project Start and End
Start and Completion of each phase and/or discipline
Kick of Meeting
Site Handover
Sign of Contract
Schedule
A schedule represents the planned dates for performing activities and for meeting deliverables.
A schedule is a communication tool used to discuss what work needs to be done in order to complete the project.
Schedules are typically created at the beginning of a project and updated and reported regularly.
Project Scheduling Steps
An executable schedule can be created by following the project scheduling steps given below;
Creating and developing the Work Breakdown Structure (WBS) of the project
Defining work packages and major project deliverables
Defining the tasks
Defining relationships
Defining and assigning resources
Analyzing the critical path of the project
Development of the work breakdown structure (WBS) is one of the most important steps in scheduling. Because it creates a framework for a proper schedule.
Work packages are represented as the lowest level of detail within the WBS and the activities are grouped and listed under the work packages.
Activities are the actions which have a specific start date, end date, and duration. Relationships are the logic ties between the activities. They determine which activity will start or finish first in what type of logic.
Resources are materials, labor, and machinery required to perform the activities. Once they are estimated, they are assigned to the activities.
The last step is analyzing the schedule if it is realistic or not. You analyze and control the critical path of the schedule.
1. Milestone Schedule
A Milestone Schedule is a summary level schedule, which identifies the major project milestones.
Milestone planning focuses on milestones instead of activities. Major deliverables, significant events, contractual obligations, and the company’s strategic goals are demonstrated in milestone schedules.
Milestone schedules are one of the most important schedules that must be maintained and referred through the project life cycle. Simply put, a milestone schedule is a summary level schedule that helps the project team to review and track all the major project milestones that may exist during the execution of the project.
2. Master Schedule & Why is a Master Schedule Important?
A project manager’s primary responsibility is to complete the project on time and budget along with meeting the client’s requirements. Therefore scheduling the activities and resources efficiently plays a key role in any project’s success. The project master schedule is one of the most effective tools that help the project manager to perform his business.
Master Schedule is a summary level project schedule which includes the major p
roject deliverables, work breakdown structure components, and key project milestones.
A project master schedule is an early communication tool among stakeholders which shows the major deliverables, key milestones, and summary of work breakdown structure activities.
Simply put, a master schedule is prepared for tracking the project at a summary level.
3. Project Schedule
A Project Schedule represents the planned dates for performing activities and the planned dates for meeting milestones.
The project schedule details what work needs to be done and which resources must be assigned in order to perform the tasks in a given time period. Engineering, Procurement, and Execution parts are detailed in Project Schedules.
The project schedule should be updated regularly in order to monitor the project’s performance.
Master Schedule vs Milestone Schedule
The detail level of a milestone schedule is lower than the detail level of a master schedule.
A milestone schedule includes major project milestones. On the other hand, a master schedule is a summary level project schedule which includes milestones, major deliverables, and work breakdown schedule components.
Summary
In order to keep track of all of the different components of a project, project teams create a number of schedules in different detail levels. Milestone Schedules and Master Schedules are summary level schedules prepared for early communication among stakeholders. These schedules are used to demonstrate the main strategy of the project. On the other hand, a project schedule is a detailed schedule which is prepared to show the detailed tasks required to complete the project and updated regularly to monitor the project’s performance.
In this article, we discuss the concept; master schedule vs milestone schedule. We hope that it will be useful for professionals and team members working in the field of time managem
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
A project master schedule is an early communication tool among stakeholders which shows the major deliverables, key milestones, and summary of work breakdown structure activities.
Simply put, a master schedule is prepared for tracking the project at a summary level.
3. Project Schedule
A Project Schedule represents the planned dates for performing activities and the planned dates for meeting milestones.
The project schedule details what work needs to be done and which resources must be assigned in order to perform the tasks in a given time period. Engineering, Procurement, and Execution parts are detailed in Project Schedules.
The project schedule should be updated regularly in order to monitor the project’s performance.
Master Schedule vs Milestone Schedule
The detail level of a milestone schedule is lower than the detail level of a master schedule.
A milestone schedule includes major project milestones. On the other hand, a master schedule is a summary level project schedule which includes milestones, major deliverables, and work breakdown schedule components.
Summary
In order to keep track of all of the different components of a project, project teams create a number of schedules in different detail levels. Milestone Schedules and Master Schedules are summary level schedules prepared for early communication among stakeholders. These schedules are used to demonstrate the main strategy of the project. On the other hand, a project schedule is a detailed schedule which is prepared to show the detailed tasks required to complete the project and updated regularly to monitor the project’s performance.
In this article, we discuss the concept; master schedule vs milestone schedule. We hope that it will be useful for professionals and team members working in the field of time managem
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;