SMH General Construction
22.4K subscribers
1.48K photos
45 videos
294 files
1.18K links
በኮንስትራክሽን ዘርፍ ላይ ከዲዛይን ,ቅየሳ ጀምሮ እስከ ፊኒሺንግ ሁሉንም

👷‍♂እናማክራለን
🏢ዲዛይን እናደርጋለን
📚ሙያዊ ድጋፍ እና እገዛ እናደርጋለን
🏗በጥራት እና በጊዜ ፍጥነት እንገነባለን
📲 0953138434(Eng sintayehu melese)

tiktok
https://www.tiktok.com/@ethiocons

ለሃሳብ እና ኣስተያየት
@Ethiocon143bot ይጠቀሙ
Download Telegram
👉ውድ የ ቤተሰቦች ዛሬ ደሞ በጠየቃችሁን መሰረት ስለ ቢም ዲዛይን ማለትም ኣንድ የተሰራ ( Example Of Beam Design) ኣዘጋጅተናል።እናመሰግናለን።
.
⚡SHARE SHARE SHARE
👉Morning Tip
.
➡Postive bars are provided to resist positive moments, and they are provided at the bottom of the two way slab
.
whereas...
.
➡ negative bars are provided to resist negative moments and they are provided on the top of
the two way slab.
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
👉ELEMENTS OF AN ASPHALT CONCRETE
PAVEMENT
.
➡Asphalt concrete pavements also called flexible pavements are pavements built from asphalt- concrete (asphalt, coarse aggregate, filler (optional) , and fine aggregate).
They transmit loads imposed on the surface through lateral distribution of the applied loads over depth.
.
➡The elements of an asphalt concrete pavement are:👇
.
▶Surfacing: This is the uppermost layer of the
pavement. The primary function of the surfacing is
to provide a safe and comfortable riding surface for the traffic. It is also expected to protect the layers underneath from the effects of natural elements
(wind, rain, ice etc.) as well as the disintegrating
effects from vehicles skidding and braking on the roadway. In this regard, it should be impervious so
as to waterproof the underlying layers. In higher
types of roads, it may consist of two distinct sub
layers known as a wearing course and a base
course.
.
▶ Base: this is the most important and normally the thickest layer of an asphalt concrete pavement on which the surfacing rests. It is the main load
spreading layer of the pavement. It bears the burden of distributing the applied surface loads in such a manner that the bearing Capacity of the subgrade is not exceeded. It should therefore be built from high quality materials capable of withstanding the applied loads on the surface. It consist of either: crushed stone or gravel, gravelly soils, decomposed rocks, sands or sand-clays stabilized with cement, lime or bitumen.
.
▶Sub-base: The sub-base is the secondary load
spreading layer of the pavement underlying the
base. It may or may not be present in a pavement
depending on the purpose for which it is to be
used. It helps to distribute the applied loads to the
subgrade. Its stresses are less than those of the
base. Therefore its materials can be of lower quality than those of the base but must always be stronger than those of the subgrade. It is usually coarse grained or granular to act as a drainage layer for passage of any moisture which falls during
construction or after construction to the highway drainage system.
.
▶Subgrade: this is the upper layer of the natural soil over which the pavement is being built. It may be undisturbed local material exposed by excavation or soil excavated elsewhere and placed into an embankment. It is usually compacted during
construction to give added stability.
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
❤1
እንኳን ለ ኢሬቻ በዓል አደረሳችሁ
Bega Geessan
👉The major steps involved in the process of
concreting are as follows:👇
1. Batching
2. Mixing
3. Transporting and placing of concrete
4. Compacting.
.
▶Batching: The process of measurement of the
different materials for the making of concrete is
known as batching. batching is usually done in two ways: volume batching and weight batching. In case of volume batching the measurement is done in the form of volume whereas in the case of weight batching it is done by the weight.
.
▶Mixing: In order to create good concrete the
mixing of the materials should be first done in dry
condition and after it wet condition. The two general
methods of mixing are: hand mixing and machine
mixing.
.
▶Transportation and placing of concrete: Once the concrete mixture is created it must be transported to its final location. The concrete is placed on form works and should always be dropped on its final location as closely as possible.
.
▶Compaction of concrete: When concrete is placed
it can have air bubbles entrapped in it which can
lead to the reduction of the strength by 30%. In
order to reduce the air bubbles the process of
compaction is performed. Compaction is generally
performed in two ways: by hand or by the use of
vibration. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
👍1😍1
👉MIXING OF CONCRETE
.
▶HAND MIXING AND
MACHINE MIXING MIXING OF CONCRETE:
.
*After proportioning all concrete ingredients their
mixing is done. The mixing process should ensure
homogeneous mass uniform color. Segregation
should not take place during the mixing operation. Mixing is done by two following methods:
1. Hand Mixing
2. Machine Mixing
.
1. HAND MIXING:
This method is adopted where the quantity of
concrete is very small or where mixing machine is
not available. Cement and sand are first of all mixed dry on a clean hard impermeable platform. Dry mixing is continued until the mixture attains uniform color.
*Now, this mix is spread on the measured stock of
coarse aggregate in required amount and these are mixed again to have uniform color. Shovels are
used for this mixing purpose.
*Make hollow in the middle of the mixed pile and add 75% of the required amount of water. Mixing is done and the remaining quantity of water is added to acquire the uniform workability. In this method of mixing, about 10% more cement is used to make good the cement lost due to possible water flowing
out of the mix and also to make good strength
characteristic to inferior result of hand mixing.
.
2. MACHINE MIXING:
On large works where concreting work is quite
large, machine mixing of concrete proves economical. Concrete produced by machine mixing is more homogeneous and can be prepared with comparatively less w/c ratio.
*The concrete mixers may either be batch type or
continuous type. Batch mixers mix and discharge
each load of materials separately, whereas
continuous mixers produce steady stream of
concrete so long as it is in operation. Latter type
mixers are not in common use. Batch type mixers
are mostly adopted. These may be rotary o non-
tiling type or tilting type.
A) ROTARY OR NON-TILTING TYPE MIXER:
This mixer has a cylindrical drum fitted with a number of inclined blades in it. It revolves about horizontal axis and has two openings. Charge is admitted in the drum through one opening and
mixed charge is discharged through the second one. This mixer is available in following capacities. (Concrete produced in a batch in liters) 140 NT, 200 NT, 280 NT, 400 NT and 800NT. (NT
indicates Non-tilting).
B) TILTING TYPE MIXER:
This mixer has conical-shaped drum which revolves about inclined axis.
*The drum is tiltable in different positions of charging, mixing, and discharging. Blades are fitted inside the drum to affect through mixing of materials. The materials are charged into the drum by loading skip. These are available in the following capacities:
100 T, 140 T, and 200 T.
In capacity figures 100, 140 200 etc. indicate
capacity in liters of one batch. The most common
size of mixer is 200 T. It is a convenient size and
permits a full bag batch of concrete of 1:2:4 ratio.
Speed of revolution/minute of mixers is 15 to 35.
. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
👉ROLES OF A QUANTITY SURVEYOR
~~~~~~~~~~~~~~~
▶Quantity surveyor calculates the cost by calculating the quantity of material required for any and every activity involved in construction.
He/She is also involved:in planning and contracting related job which is
mainly involved in the construction cost calculation.
➡The role of a quantity surveyor are listed below:👇
1. Estimating.
2. Cost planning.
3. Preparing, negotiating and analyzing costs for
tenders and contracts.
4. Procurement advice.
5. Preparing Bill of Quantities (BOQ).
6. Monitoring Budget.
7. Preparation of Payment Invoice and certification.
8. Assessment of variations
9. Dispute resolution.
10. Preparing feasibility studies.
11. Cost control.
12. Value engineering.
13. Advice on cost limits and budgets
14. Whole life cycle costing.
15. Valuation for insurance purposes.
16. Project management.
17. Advice on contractual disputes.
18. Preparation of final account.
19. Site visits, assessments, and projections for
future work.
20. Analysing completed work and arranging
payment to contractors.
21. Allocating upcoming work to contractors.
Besides these, quantity surveyors may choose to
specialize in a specific area of the construction
industry and focus on areas like costing advice,
property taxation, application to funding sources, maintenance of existing buildings, etc.
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
👉TYPES OF DRAWINGS USED IN BUILDING
CONSTRUCTION
~~~~~~~~~~~~~~~~
⏩Drawings are the most important things we need to start any construction project. There are different
types of drawings for different purposes. In this
article, we will discuss different types of
construction drawings (also known as working
drawing).
*Construction drawings provide detail measurements and clear section of every building parts.
After reviewing, the drawings are justified and modified and finally approved for construction. *The different types of construction drawings are listed below.👇
.
1 ARCHITECTURAL DRAWING: This type of drawing provides complete view of a building. It demonstrates the location of building and all building parts where they will be placed.
*There are different types of architectural drawings
with different names such as plan, elevation, section
etc.
.
2 STRUCTURAL DRAWING:
As the name suggests, this type of drawing provides information about structure, like strength of
different structural elements, structural materials, grade, size and placement of reinforcement etc.
.
3 ELECTRICAL DRAWING:
This type of drawings provide the details and
location of electrical wiring, fixtures, substation
etc. The electrical load calculation is also given in
the drawing.
.
4 PLUMBING AND SANITARY DRAWINGS:
These drawings give the location of sanitary, piping
for water supply system, fixture, and the process to
connect every fixture etc
. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
👍1
ውድ የ channel አችን ቤተሰቦች በ ሙዚቀኛ ኤልያስ መልካ ህልፈት የተሰማንን ሀዘን እየገለፅን፤ ለ ቤተሰቦቹ
እና ለወዳጆቹ መፅናናትን እንመኛለን።
አርባምንጭ ዩኒቨርስቲ

የአርባምንጭ ዩኒቨርስቲ ተማሪዎች ህብረት በላከው መረጃ ለአዲስ ተማሪዎች መግቢያ ቀን መስከረም 28 እና 29 እንዲሆን ተወስኗል፡፡

በ2012 መቱ ዩኒቨርሲቲ ለተመደባችሁ ተማሪዎች በሙሉ!

የ2012 የአዲስ ተማሪዎች ምዝገባ ጊዜ መስከረም 28-30 መሆኑን በመገናኛ ብዙሃን ማስታወቃችን ይታወሳል። ሆኖም ግን የሳይንስና ከፍተኛ ት/ት ሚ/ር የአዲስ ተማሪዎችን ድልደላ ሳያሳዉቅ በመቆየቱ የአዲስ ተመሪዎች የምስገባ ጊዜን ወደ ጥቅምት 5-7: በቅጣት ጥቅምት 8 እና 10/2012 ያስተላለፍን መሆኑን እንገልፃለን።

የመቱ ዩኒቨርሲቲ ሪጅስትራል

#ወላይታ_ሶዶ| የመጀመሪያ ዓመት ተማሪዎች የመግበያ ቀን መስከረም 27-28 የነበርዉ ወደ ጥቅምት 3 እና 4 መሆኑን እንገልፃለን...... በተጨማሪ አንደኛ እና ሁለተኛ ስሜስተር በADR case የሄዳችሁ ተማሪዎች ከመጀመሪያ ዓመት ተማሪዎች ጋር እንድትገቡ እናሳስባለን!!

via ከተማሪዎች ህብረት

የወሎ ዩኒቨርሲቲ አዲስ ተማሪዎች ምዝገባ ላልተወሰነ ጊዜ ተራዝሟል!

የመግቢያ ቀኑ ይፋ ሲደረግ ethio construction ተከታትሎ ያሳውቃል!

ጋምቤላ ዩኒቨርስቲ መግቢያ ቀን ተራዘመ!

ለነባር ተማሪዎች ጥቅምት 3-4
ለአዲስ ተማሪዎች ጥቅምት 10-11

ለባሕር ዳር ዩኒቨርሲቲ 2012 #አዲስ የተመደባችሁ ተማሪዎች #የምዝገባ_ቦታን ስለማሳወቅ:

1.#ዋና_ግቢ (ፔዳ)
#ማህበራዊ_ሳይንስ(Social Science) እና
ማህበራዊ ሳይንስ #ቲችንግ(Social Science teaching)

2.#ግሽ_አባይ_ግቢ (ይባብ ካምፓስ)
#ተፈጥሮ_ሳይንስ(Natural Science) ከአልፋቤት A እስከ
M የሆናችሁ

3.#ዘንዘልማ_ግቢ
ተፈጥሮ ሳይንስ(Natural Science) ከአልፋቤት N እስከ
Z የሆናችሁ እና
ተፈጥሮ ሳይንስ #ቲችንግ (Natural Science
teaching)ሁሉም
መሆኑን አውቃችሁ በየተመደባችሁበት ቦታ እነድትገኙ እናሳውቃለን፡፡

ሬጅስትራርና አሉሙናይ ማኔጅመንት ዳይሬክቶሬት ዳይሬክተር

በ2012 ወልቂጤ ዩኒቨርሲቲ ለተመደባችሁ ተማሪዎች በሙሉ።

ከዚህ በፊት የ2012 የአዲስ ተማሪዎች ምዝገባ ጊዜ መስከረም 28-30 መሆኑን ማስታወቃችን ይታወሳል። ሆኖም ግን የሳይንስና ከፍተኛ ትምህርት ሚ/ር የአዲስ ተማሪዎችን ድልደላ ሳያሳዉቅ ቆይቱ በቅርብ ስላሳወቀ የአዲስ ተማሪዎች የምዝገባ ጊዜ ጥቅምት 3 እና 4/2012 ያስተላለፍን መሆኑን እንገልፃለን።

የወልቂጤ ዩኒቨርሲቲ ሪጅስትራል ፅ/ቤት
"ለጥበብ እንተጋለን!"
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
👉DIFFERENCE BETWEEN PERT AND CPM
.
➡PERT and CPM are most commonly used methods
for project management. In this article, I will discuss the differences between PERT and CPM.
°°°°°°°°°°°°°°°°°°
▶WHAT IS PERT?
*PERT or Programme Evaluation and Review
Technique is an event oriented method of network planning. In it, the emphasis is focused on start and completion events rather than on activities.
The activities taking place between events are not
specified.
*In PERT network, the events fall in logical
sequence. But the logic of events may be different
for different planners. Hence PERT network may
vary from planner to planner depending upon their decision as which event to precede or occur
concurrently.
*In PERT network the start circle is omitted and only
the completed event is recorded. PERT helps in
identifying critical area which threatens the
completion of the work. It provides the means to
determine how resources can be transferred from
one job to another job.
::::::::::::::::::::::::::
▶WHAT IS CPM?
CPM is also network comprising events and
activities. This network is activity based. The
activities are represented by arrowed lines and
events by circles. The activities are connected in
logical sequence. The time allotted to each activity
is related to cost.
➡DIFFERENCE BETWEEN PERT AND CPM:
1. PERT is event oriented whereas CPM is activity
oriented. In simple words, in PERT network interest
is focused upon start or completion of events and
not on activities themselves.
2. In CPM network no allowance is made for
uncertainties in the duration of time involved
whereas in PERT network uncertainty is considered.
3. In PERT, time is not related to cost whereas in
CPM the object is to develop an optimum time
cost relationship. However, PERT has since been
extended in this direction and the line dividing
PERT/CPM is gradually fading out.
4. In CPM duration of activity is estimated with a
fair degree of accuracy. In PERT duration of
activities are not so accurate and definite.
5. In CPM both time and cost can be controlled
during planning. Pert is basically a tool for
planning.
6. PERT is used in research and development
project, basically for non-repetitive type projects.
CPM is widely used in construction projects
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
ስለነዚህ ሕንፃዎች ምን ትላላችሁ?
መታየት ያለባቸው አሪፍ የኮንስትራክሽን ሾዎች
1. Megastructures
2. Impossible builds
3.Building Giants
4. Living big in tiny house

YouTube ላይ ታገኙታላችሁ
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
Structural failures due to shear,buckling,and compression
ይህ የምትመለከቱት Dubai mall ይባላል የአለማችን ሰፊዉ እና ትሌቁ ህንፃ ነዉ።
እንኳን ደስ አለን!!!

🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹🇪🇹

🇪🇹 ዶ/ር ዐቢይ አህመድ የ2019 የኖቬል የሰላም ሽልማትን አሸነፉ!!!

የኢፌዲሪ ጠቅላይ ሚኒስትር ዶ/ር ዐቢይ አህመድ የ2019 የኖቬል የሰላም ሽልማትን አሸነፉ፡፡ በኖርዊጂያን የኖቬል ኮሚቴ ዛሬ ይፋ በተደረገው የ2019 የኖቬል የሰላም ሽልማት ጠቅላይ ሚኒስትር ዶ/ር ዐቢይ አህመድ የ16 አመቷን ስዊድናዊት የአየር ንብረት አክቲቪስት ግሪታ ቱምበርግ፣ ብራዚላዊ የአካባቢ ጥበቃ ባለሙያ ራኦኒ ሜቱክተይር እና ‘’ሪፖርተርስ ዊዝአውት ቦርደርስ’’ የተባለውን የመረጃና የፕሬስ ነፃነት ላይ የሚሰራ ድርጅት በማሸነፍ ነው ለሽልማት የበቁት፡፡

ለጠቅላይ ሚኒስቴር ዐብይ አሕመድ እንኳን ደስ አሎት ለማለት እንወዳለን!
👉Today Tip
.
✅what is The circled Number with the letter R in the picture?👆
.
✅The number "42.5" and the letter "R" together gives information about the strength class of cement.
.
✅The strength class of cement classifies its compressive strength at 28 days.
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
👉በሚያመነጩት ሃይል የአለም 10 ታላላቅ የኤሌክትሪክ ማመንጫ ግድቦች:

1.Three Gorges(China)
⚡22500MW

2.Itaipu(Paraguay & Brazil
⚡14000MW

3.Guru(Venezuela)
⚡10,200MW

4.Tucurui(Brazil)
⚡8,370MW

5.Grand Coulee(USA)
⚡6809MW

6.Sayano-Shushenskaya (Russia)
⚡6400MW

7.Longtan(China)
⚡6300MW

8.Krasnoyarsk (Russia)
⚡5988MW

9.Robert-Bourassa(Canada)
⚡5616MW

10.Churchill Falls(Canada)
⚡5428MW
This is in Addis.