👉CONSTRUCTION ENGINEERING TIPS @civil_Cotm_eng
.
*ASTM Abbrevation : American Society for Testing Materials
*Grade of Concrete is denoted as Cement: Sand: Aggregate (Ex C-20 Grade : 1:2:3)
*C/C means Center to Center Distance
*DL means Development Length
*Lapping of bars not allowed if the dia of bar is more than 36mm.
*For circular column minimum of 6 longitudinal bars are used and 4 for Rectangular.
*The minimum thickness of slab is 0.125m
*Water pH value less than 6 should not be used for construction purpose.
*The concrete Should not be thrown from a height more than 1.5m.
*The Compressive strength of Bricks is 3.5 N /mm
*The initial setting time shall not be less than 30 minutes and the final setting time of cement is 10hours.
*Dead Load means Self weight of Structure
*Sand having moisture content more than 5% should not be used for Concrete mix.
*DPC means Damp Proof Course. The thickness of DPC should not be less than 2.5cm.
*Cube test is carried out for each 30m usage of concrete.
*RMC : Ready Mix concrete, The concrete is made at factory and transported to the site, This type of concrete is used where there is a lack of space for mixing the concrete and used where a huge amount of concrete is required for construction.
*The height of floor is usually 3m or 10ft (If a person asks you whats the height of 12 storied building?
Ans: 3m x 12floors = 36m)
*A head mason can work 25-30m in a day.
*In construction, the rate analysis for the work of workers is calculated in Man Hours. (Ex: 10 Birr for 1 Man hour)
*Cantilever Beam has One fixed support and the other end is free.
*Simple supported beam has a minimum of two supports. @civil_Cotm_eng
*PCC (Plain Cement Concrete) this type of concrete is used on members only when the tensile forces are not acting on it.
*The weight of first class clay brick should be 3.85 Kg. and it has a crushing
strength of 10.5MN/m
*Adding more water in the concrete mix to increase setting time leads to form
the Cracks or honeycomb in hardened concrete.
*Vibration in freshly made concrete is done to remove the air bubbles in concrete mix.
*Impermeability of concrete: The concrete which resists the the entry of water or moisture into it.
*The concrete can be lifted to a maximum height of 50m using Concrete
Pumps.
*The curing Period of RCC is 28days .
*The minimum sill level height should be
44 inches.
*The transverse reinforcement provided in columns are called Ties .
*The transverse reinforcement provided in
Beams is called as Stirrups .
*Stirrups in Beams and Ties in Column are provided to handle the shear force and to keep longitudinal bars in position.
*The Prime reason for using steel as reinforcement is due to thermal expansion.
The thermal expansion
coefficient of concrete and steel is (approximately) same having value
*C-25 grade of concrete is generally used in the construction of slab.
*Weight of Bar is calculated using formula D /162 (D = Dia of bar in mm)
*The No. of HCB required for 1 metr square of masonary wall are 13 HCB blocks.
*Specific gravity of Cement is 3.16g/ cm ; Bricks is 2g/cm ; Sand is 2.65g/cm ,
*Standard Size of Brick is 19cm x 9cm x 4 cm or 19cm or 9cm x 9 cm
*Floor area occupied by 50kg of Cement bag is 0.3m and height of 0.18m.
*As per EBCS Maximum dia of bar used in the slab should not exceed 1/8th of the total thickness of the slab.
*The slope or Pitch of the stair should be in between 25 degrees to 40 degrees.
*The rise in stairs is in between 150mm to 200mm.
*Tread in staircase is in between 250mm to 300mm.
*Hook length should not be less than 9D (Dia of Bar)
*Unit weight of PCC is 24KN/m , RCC is 25 KN/m , Steel is 7850Kg/m
*The volume of 50kg cement bag is
1.3CFT.
*Theodolite least count is 20Secs whereas Compass Least count is 30mins .
*TMT bars : TMT means Thermo Mechanically treated bars
*Cement more than 3 months old cannot be used for construction
*The length of each bar from factory is 12m.
.
👉ለተጨማሪ የ ኮንስትራክሽን ትምህርቶች 🚩 እዚህ ይጫኑ
👇👇👇👇👇
@civil_Cotm_eng
.
*ASTM Abbrevation : American Society for Testing Materials
*Grade of Concrete is denoted as Cement: Sand: Aggregate (Ex C-20 Grade : 1:2:3)
*C/C means Center to Center Distance
*DL means Development Length
*Lapping of bars not allowed if the dia of bar is more than 36mm.
*For circular column minimum of 6 longitudinal bars are used and 4 for Rectangular.
*The minimum thickness of slab is 0.125m
*Water pH value less than 6 should not be used for construction purpose.
*The concrete Should not be thrown from a height more than 1.5m.
*The Compressive strength of Bricks is 3.5 N /mm
*The initial setting time shall not be less than 30 minutes and the final setting time of cement is 10hours.
*Dead Load means Self weight of Structure
*Sand having moisture content more than 5% should not be used for Concrete mix.
*DPC means Damp Proof Course. The thickness of DPC should not be less than 2.5cm.
*Cube test is carried out for each 30m usage of concrete.
*RMC : Ready Mix concrete, The concrete is made at factory and transported to the site, This type of concrete is used where there is a lack of space for mixing the concrete and used where a huge amount of concrete is required for construction.
*The height of floor is usually 3m or 10ft (If a person asks you whats the height of 12 storied building?
Ans: 3m x 12floors = 36m)
*A head mason can work 25-30m in a day.
*In construction, the rate analysis for the work of workers is calculated in Man Hours. (Ex: 10 Birr for 1 Man hour)
*Cantilever Beam has One fixed support and the other end is free.
*Simple supported beam has a minimum of two supports. @civil_Cotm_eng
*PCC (Plain Cement Concrete) this type of concrete is used on members only when the tensile forces are not acting on it.
*The weight of first class clay brick should be 3.85 Kg. and it has a crushing
strength of 10.5MN/m
*Adding more water in the concrete mix to increase setting time leads to form
the Cracks or honeycomb in hardened concrete.
*Vibration in freshly made concrete is done to remove the air bubbles in concrete mix.
*Impermeability of concrete: The concrete which resists the the entry of water or moisture into it.
*The concrete can be lifted to a maximum height of 50m using Concrete
Pumps.
*The curing Period of RCC is 28days .
*The minimum sill level height should be
44 inches.
*The transverse reinforcement provided in columns are called Ties .
*The transverse reinforcement provided in
Beams is called as Stirrups .
*Stirrups in Beams and Ties in Column are provided to handle the shear force and to keep longitudinal bars in position.
*The Prime reason for using steel as reinforcement is due to thermal expansion.
The thermal expansion
coefficient of concrete and steel is (approximately) same having value
*C-25 grade of concrete is generally used in the construction of slab.
*Weight of Bar is calculated using formula D /162 (D = Dia of bar in mm)
*The No. of HCB required for 1 metr square of masonary wall are 13 HCB blocks.
*Specific gravity of Cement is 3.16g/ cm ; Bricks is 2g/cm ; Sand is 2.65g/cm ,
*Standard Size of Brick is 19cm x 9cm x 4 cm or 19cm or 9cm x 9 cm
*Floor area occupied by 50kg of Cement bag is 0.3m and height of 0.18m.
*As per EBCS Maximum dia of bar used in the slab should not exceed 1/8th of the total thickness of the slab.
*The slope or Pitch of the stair should be in between 25 degrees to 40 degrees.
*The rise in stairs is in between 150mm to 200mm.
*Tread in staircase is in between 250mm to 300mm.
*Hook length should not be less than 9D (Dia of Bar)
*Unit weight of PCC is 24KN/m , RCC is 25 KN/m , Steel is 7850Kg/m
*The volume of 50kg cement bag is
1.3CFT.
*Theodolite least count is 20Secs whereas Compass Least count is 30mins .
*TMT bars : TMT means Thermo Mechanically treated bars
*Cement more than 3 months old cannot be used for construction
*The length of each bar from factory is 12m.
.
👉ለተጨማሪ የ ኮንስትራክሽን ትምህርቶች 🚩 እዚህ ይጫኑ
👇👇👇👇👇
@civil_Cotm_eng
🔴🔴🔴🔴🔴🔴🔴🔴🔴🔴
✅What are steel tension members? @civil_Cotm_eng
Explanation: Steel tension members are those structural elements that are subjected to direct axial tensile loads, which tend to elongate the members. A member in pure tension can be stressed up to and beyond the yield limit and does not buckle locally or overall. What's the difference between tension and compression?
✅Main Difference – Tension vs. Compression
Tension and compression refer to forces that attempt to deform an object.
The main difference between tension and compression is that tension refers to forces that attempt to elongate a body, whereas compression refers to forces that attempt to shorten the body.
✅What is net section rupture?
Net Section Rupture. ... Deformations continue with increasing load until finally rupture (tension failure) of the member occurs when the entire net cross section of the member reaches the ultimate stress. The design strength due to net section rupture for plates is given by. What is tensile rupture?
✅Tensile rupture is a strength based limit state similar to the tensile yielding limit state that we just considered. ... The concern at these locations is actual rupture so the applied forces are compared against the rupture strength in the region of reduced effective section.
✅What is slenderness ratio of a compression member?
Explanation: The tendency of member to buckle is usually measured by its slenderness ratio. Slenderness ratio of member is ratio of effective length to appropriate radius of gyration (λ = kL/r) 👇👇👇👇👇💠💠💠
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
✅What are steel tension members? @civil_Cotm_eng
Explanation: Steel tension members are those structural elements that are subjected to direct axial tensile loads, which tend to elongate the members. A member in pure tension can be stressed up to and beyond the yield limit and does not buckle locally or overall. What's the difference between tension and compression?
✅Main Difference – Tension vs. Compression
Tension and compression refer to forces that attempt to deform an object.
The main difference between tension and compression is that tension refers to forces that attempt to elongate a body, whereas compression refers to forces that attempt to shorten the body.
✅What is net section rupture?
Net Section Rupture. ... Deformations continue with increasing load until finally rupture (tension failure) of the member occurs when the entire net cross section of the member reaches the ultimate stress. The design strength due to net section rupture for plates is given by. What is tensile rupture?
✅Tensile rupture is a strength based limit state similar to the tensile yielding limit state that we just considered. ... The concern at these locations is actual rupture so the applied forces are compared against the rupture strength in the region of reduced effective section.
✅What is slenderness ratio of a compression member?
Explanation: The tendency of member to buckle is usually measured by its slenderness ratio. Slenderness ratio of member is ratio of effective length to appropriate radius of gyration (λ = kL/r) 👇👇👇👇👇💠💠💠
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
ኮንክሪት ስላምፕ ቴስት @civil_Cotm_eng
.
የኮንክሪት ስላምፕ ቴስት በሳይት የሚተገበር የፍተሻ አይነት
ሲሆን የኮንክሪትን የመስራት አቅም (Workability) እና ፅኑእነት
(Consistency) ለመለካት ይጠቅማል
.
ኮንክሪት ስላምፕ ቴስት በየእያንዳንዱ የኮንክሪት ሙሌት
ስራውስጥ መተግበር አለበት ። ስላምፕ ቴስት በትንሽ ወጪ
ምንተገብረው የኮንክሪትን Workability ምንመዝንበት
ተመራጭ መፈተሻ ነው በዚህ ምክንያት ከ1922 G.c ጀምሮ
እስካሁን አገልግሎት ላይ እየዋለ ይገኛል።
.
የኮንክሪት ስላምፕ ቴስት ላይ ተፅዕኖ የሚያሳርፉ ነገሮች
(Factors which influence the concrete slump test)
.
1- ለ ኮንክሪቱ እንደግብአት የተጠቀምናቸው እቃዎች
ባህርይ...ለምሳሌ ስነውህድ (ኬሚስትሪ) ቅጥነት ፣ የቁሱ መጠን
እና ስርጭት (particle size and distribution) ፣ እርጥበት
፣ የሲሚንቶ ግብአት እና እርጥበት የመያዝ አቅም.
.
2- የኬሚካል አድሚክስቸር መጠን አይነት መስተጋብር...
.
3- የኮንክሪቱ አየር የመያዝ አቅም
.
4- ኮንክሪት ማቀላቀያ ማጓጓዣ ቁስ እና ዘዴ
.
5- የኮንክሪቱ temperature
.
6- በኮንክሪቱ ውስጥ የሚገኝ የውሃ መጠን
.
7- ኮንክሪቱ ለፍተሻ የተወሰደበት ግዜ
.
.
Slump test ለማድረግ የምንጠቀማቸው እቃዎች
.
Slump ለመስራት የሚያገለግል መሃሉ ክፍት የሆነ ኮን
(cone) መሰል ቅርፅ ማውጫ ይህ ቅርፅ ማውጫ 30cm
ርዝመት 20 cm የታችኛው ዲያሜትር 10cm የላይኛው
ዲያሜትር ያለው ነው (mold)
መለኪያ ማስመሪያ
ከብረት የተሰራ 16 mm dia. እና 60 cm ርዝመት ያለው
መጠቅጠቂያ ብረት
.
ስላምፕ ቴስትን የመከወኛ ቅደም ተከተል
.
step-1 መጀመርያ የቅርፅ ማውጫ ኮን (mold ) ንፁ
መሆን አረጋግጥ ኮንክሪቱ በቀላሉ ከሞልድ እንዲላቀቅ ቅርፅ
ማውጫውን ዘይት መቀባት አለበት
.
step-2 ቅርፅ ማውጫውን (mold ) ትልቅ ዲያሜትር
ባለው ጫፍ በኩል ወንፊት ባልሆነ ስሃን ላይ አቁመው
.
Step 3- የቅርፅ ማውጫ (mold) በእኩል 4 layer
በኮንክሪት ሙሉት
.
Step 4- እያንዳንዱን የኮንክሪት ላየር 25 ግዜ
በመጠቅጠቂያ ብረት ምቱት (ጠቅጥቁት) የአጠቃጠቅ
ጉልበታችሁ እኩል መሆን አለበት
.
Step 5- ኮኑ (mold) ከሞላ በኋላ ትንሽ ዲያ ባለው
ጫፍ ላይ ያል ትርፍ ኮንክሪትን አስወግዱት ጫፉንም ለስኑት
.
Step 6- ቅስ በማለት የኮንክሪት ቅርፅ ማውጫውን
(mold) ከኮንክሪቱ አለያዩት
.
Step 7- ቀጥሎም ኮንክሪቱ ከቅርፅ ማውጫ (mold)
ያለውን የርዝመት ልዩነት ለኩት
.
.
Note - እዚጋ ማሳሰብ ምፈልገው ነገር ይህን ቴስት
ስታደርጉ ቦታው ከእርግብግቢት (Vibration) የፀዳ መሆን
አለበት ያልተረጋጋ ቦታ ላይ ማድረግ የቴስቱን ውጤት
ያበላሸዋል...ሳምፕሉ ከተወሰደ በሁለት ደቂቃ ውስጥ ቴስቱን
መከወን አለብን
.
.
ከኮንክሪት ስላምፕ ቴስት የምናገኛቸው የውጤት አይነቶች
.
True Slump- ይህ ከፍተሻው ምናገኘው ብቸኛው ልኬት
ነው ቅርፅ ማውጫው ከኮንክሪቱ ከተለያየ በኋላ ያለው የኮንክሪቱ
ቁመት ከቅርፅ ማውጫው በንፃሬ የምናገኘው ልዩነት (ምስሉን
ይመልከቱ)
.
Zero Slump - ዜሮ ስላምፕ ኮንክሪቱ አነስተኛ የውሃ-
ሲሚንቶ ratio ያለው መሆኑን ያሳያል ዜሮ ስላምፕ ያለው
ኮንክሪት ለመንገድ ግንባታ አገልግቶት ላይ ይውላል...
.
Collapsed Slump- ይህ ደግሞ ከዜሮ ስላምፕ በተለየ
የኮንክሪቱን የውሃ ሲሚንቶ ውህድ Ratio ትልቅ መሆን ያሳያል
ይህ ማለት የኮንክሪቱ የእርጥበት መጠን ከፍተኛ መሆኑን እና
High workability mix ያሳየናል።
.
Shear Slump- ይህ ደግሞ የፍተሻው ውጤት ሙሉ
እንዳልሆነ ይነግረናል።
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
.
የኮንክሪት ስላምፕ ቴስት በሳይት የሚተገበር የፍተሻ አይነት
ሲሆን የኮንክሪትን የመስራት አቅም (Workability) እና ፅኑእነት
(Consistency) ለመለካት ይጠቅማል
.
ኮንክሪት ስላምፕ ቴስት በየእያንዳንዱ የኮንክሪት ሙሌት
ስራውስጥ መተግበር አለበት ። ስላምፕ ቴስት በትንሽ ወጪ
ምንተገብረው የኮንክሪትን Workability ምንመዝንበት
ተመራጭ መፈተሻ ነው በዚህ ምክንያት ከ1922 G.c ጀምሮ
እስካሁን አገልግሎት ላይ እየዋለ ይገኛል።
.
የኮንክሪት ስላምፕ ቴስት ላይ ተፅዕኖ የሚያሳርፉ ነገሮች
(Factors which influence the concrete slump test)
.
1- ለ ኮንክሪቱ እንደግብአት የተጠቀምናቸው እቃዎች
ባህርይ...ለምሳሌ ስነውህድ (ኬሚስትሪ) ቅጥነት ፣ የቁሱ መጠን
እና ስርጭት (particle size and distribution) ፣ እርጥበት
፣ የሲሚንቶ ግብአት እና እርጥበት የመያዝ አቅም.
.
2- የኬሚካል አድሚክስቸር መጠን አይነት መስተጋብር...
.
3- የኮንክሪቱ አየር የመያዝ አቅም
.
4- ኮንክሪት ማቀላቀያ ማጓጓዣ ቁስ እና ዘዴ
.
5- የኮንክሪቱ temperature
.
6- በኮንክሪቱ ውስጥ የሚገኝ የውሃ መጠን
.
7- ኮንክሪቱ ለፍተሻ የተወሰደበት ግዜ
.
.
Slump test ለማድረግ የምንጠቀማቸው እቃዎች
.
Slump ለመስራት የሚያገለግል መሃሉ ክፍት የሆነ ኮን
(cone) መሰል ቅርፅ ማውጫ ይህ ቅርፅ ማውጫ 30cm
ርዝመት 20 cm የታችኛው ዲያሜትር 10cm የላይኛው
ዲያሜትር ያለው ነው (mold)
መለኪያ ማስመሪያ
ከብረት የተሰራ 16 mm dia. እና 60 cm ርዝመት ያለው
መጠቅጠቂያ ብረት
.
ስላምፕ ቴስትን የመከወኛ ቅደም ተከተል
.
step-1 መጀመርያ የቅርፅ ማውጫ ኮን (mold ) ንፁ
መሆን አረጋግጥ ኮንክሪቱ በቀላሉ ከሞልድ እንዲላቀቅ ቅርፅ
ማውጫውን ዘይት መቀባት አለበት
.
step-2 ቅርፅ ማውጫውን (mold ) ትልቅ ዲያሜትር
ባለው ጫፍ በኩል ወንፊት ባልሆነ ስሃን ላይ አቁመው
.
Step 3- የቅርፅ ማውጫ (mold) በእኩል 4 layer
በኮንክሪት ሙሉት
.
Step 4- እያንዳንዱን የኮንክሪት ላየር 25 ግዜ
በመጠቅጠቂያ ብረት ምቱት (ጠቅጥቁት) የአጠቃጠቅ
ጉልበታችሁ እኩል መሆን አለበት
.
Step 5- ኮኑ (mold) ከሞላ በኋላ ትንሽ ዲያ ባለው
ጫፍ ላይ ያል ትርፍ ኮንክሪትን አስወግዱት ጫፉንም ለስኑት
.
Step 6- ቅስ በማለት የኮንክሪት ቅርፅ ማውጫውን
(mold) ከኮንክሪቱ አለያዩት
.
Step 7- ቀጥሎም ኮንክሪቱ ከቅርፅ ማውጫ (mold)
ያለውን የርዝመት ልዩነት ለኩት
.
.
Note - እዚጋ ማሳሰብ ምፈልገው ነገር ይህን ቴስት
ስታደርጉ ቦታው ከእርግብግቢት (Vibration) የፀዳ መሆን
አለበት ያልተረጋጋ ቦታ ላይ ማድረግ የቴስቱን ውጤት
ያበላሸዋል...ሳምፕሉ ከተወሰደ በሁለት ደቂቃ ውስጥ ቴስቱን
መከወን አለብን
.
.
ከኮንክሪት ስላምፕ ቴስት የምናገኛቸው የውጤት አይነቶች
.
True Slump- ይህ ከፍተሻው ምናገኘው ብቸኛው ልኬት
ነው ቅርፅ ማውጫው ከኮንክሪቱ ከተለያየ በኋላ ያለው የኮንክሪቱ
ቁመት ከቅርፅ ማውጫው በንፃሬ የምናገኘው ልዩነት (ምስሉን
ይመልከቱ)
.
Zero Slump - ዜሮ ስላምፕ ኮንክሪቱ አነስተኛ የውሃ-
ሲሚንቶ ratio ያለው መሆኑን ያሳያል ዜሮ ስላምፕ ያለው
ኮንክሪት ለመንገድ ግንባታ አገልግቶት ላይ ይውላል...
.
Collapsed Slump- ይህ ደግሞ ከዜሮ ስላምፕ በተለየ
የኮንክሪቱን የውሃ ሲሚንቶ ውህድ Ratio ትልቅ መሆን ያሳያል
ይህ ማለት የኮንክሪቱ የእርጥበት መጠን ከፍተኛ መሆኑን እና
High workability mix ያሳየናል።
.
Shear Slump- ይህ ደግሞ የፍተሻው ውጤት ሙሉ
እንዳልሆነ ይነግረናል።
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
✅Classification of Costs🅾️🅾️
❇️The different bases of cost classification are mentioned as follows:
1, Classification on the basis of time:
Historical Costs, Predetermined Costs
2, Classification on the basis of Nature or Elements
Material Costs, Labour Costs, Equipment Costs, Expenses, Overhead Costs
3, By degree of traceability to the product
Direct Costs, Indirect Costs
4, Associated with the Product
Product Costs, Period Costs
5, By changes in Activity or Volume
Fixed Costs, Variable Costs, Semi-Fixed Costs
6, Functional Classification of Costs
Manufacturing Costs, Administration Costs, Distribution Costs, R and D Costs, Pre-Production Costs
7, Relationship with Accounting Period
Capital Expenditure, Revenue Expenditure
8, Controllability
Controllable Costs, Non-Controllable Costs
9, Costs for Analytical and Decision Making Purposes
Opportunity Costs, Sunk Costs, Differential Costs, Joint Costs, Common Costs, Imputed Costs, Uniform Costs, Marginal Costs, Replacement Costs, Out of Pocket Costs
10, Other Costs
Conversion Costs, Normal Costs, Traceable Costs, Avoidable Costs, Unavoidable Costs, Total Costs, Value Added.🔔🔔🔔🔔
⚡️አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
❇️The different bases of cost classification are mentioned as follows:
1, Classification on the basis of time:
Historical Costs, Predetermined Costs
2, Classification on the basis of Nature or Elements
Material Costs, Labour Costs, Equipment Costs, Expenses, Overhead Costs
3, By degree of traceability to the product
Direct Costs, Indirect Costs
4, Associated with the Product
Product Costs, Period Costs
5, By changes in Activity or Volume
Fixed Costs, Variable Costs, Semi-Fixed Costs
6, Functional Classification of Costs
Manufacturing Costs, Administration Costs, Distribution Costs, R and D Costs, Pre-Production Costs
7, Relationship with Accounting Period
Capital Expenditure, Revenue Expenditure
8, Controllability
Controllable Costs, Non-Controllable Costs
9, Costs for Analytical and Decision Making Purposes
Opportunity Costs, Sunk Costs, Differential Costs, Joint Costs, Common Costs, Imputed Costs, Uniform Costs, Marginal Costs, Replacement Costs, Out of Pocket Costs
10, Other Costs
Conversion Costs, Normal Costs, Traceable Costs, Avoidable Costs, Unavoidable Costs, Total Costs, Value Added.🔔🔔🔔🔔
⚡️አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
Master Schedule vs Milestone Schedule @civil_Cotm_eng
Project schedule, baseline schedule, master schedule, milestone schedule and work schedule are widely used concepts in the field of time management. Project teams create work schedules in order to understand what work will be completed in which period.
Basically, a project cannot be performed without a proper work schedule. Because scheduling establishes a system to manage the activities, resources, deliverables and the project goals in a timeline.
In project management, master schedule, project schedule and milestone schedule are three different schedules used for coordinating and tracking all of the different components of a project. Although each type of schedule plays an important role in completing a project on time and budget, they are different concepts.
In this article, we will discuss important time management concepts and their key differences.
For better understanding, let’s take a glance at the definitions.
Master Schedule, Milestone Schedule, Project Schedule
Before to start, let’s discuss the basic terms used in time management.
Milestone
According to PMBOK Guide, a milestone is “a significant event in the project usually completion of a major deliverable.”
∴Milestones have a fixed date but no duration.
Below are some examples of milestones in a project
Project Start and End
Start and Completion of each phase and/or discipline
Kick of Meeting
Site Handover
Sign of Contract
Schedule
A schedule represents the planned dates for performing activities and for meeting deliverables.
A schedule is a communication tool used to discuss what work needs to be done in order to complete the project.
Schedules are typically created at the beginning of a project and updated and reported regularly.
Project Scheduling Steps
An executable schedule can be created by following the project scheduling steps given below;
Creating and developing the Work Breakdown Structure (WBS) of the project
Defining work packages and major project deliverables
Defining the tasks
Defining relationships
Defining and assigning resources
Analyzing the critical path of the project
Development of the work breakdown structure (WBS) is one of the most important steps in scheduling. Because it creates a framework for a proper schedule.
Work packages are represented as the lowest level of detail within the WBS and the activities are grouped and listed under the work packages.
Activities are the actions which have a specific start date, end date, and duration. Relationships are the logic ties between the activities. They determine which activity will start or finish first in what type of logic.
Resources are materials, labor, and machinery required to perform the activities. Once they are estimated, they are assigned to the activities.
The last step is analyzing the schedule if it is realistic or not. You analyze and control the critical path of the schedule.
1. Milestone Schedule
A Milestone Schedule is a summary level schedule, which identifies the major project milestones.
Milestone planning focuses on milestones instead of activities. Major deliverables, significant events, contractual obligations, and the company’s strategic goals are demonstrated in milestone schedules.
Milestone schedules are one of the most important schedules that must be maintained and referred through the project life cycle. Simply put, a milestone schedule is a summary level schedule that helps the project team to review and track all the major project milestones that may exist during the execution of the project.
2. Master Schedule & Why is a Master Schedule Important?
A project manager’s primary responsibility is to complete the project on time and budget along with meeting the client’s requirements. Therefore scheduling the activities and resources efficiently plays a key role in any project’s success. The project master schedule is one of the most effective tools that help the project manager to perform his business.
Master Schedule is a summary level project schedule which incl
Project schedule, baseline schedule, master schedule, milestone schedule and work schedule are widely used concepts in the field of time management. Project teams create work schedules in order to understand what work will be completed in which period.
Basically, a project cannot be performed without a proper work schedule. Because scheduling establishes a system to manage the activities, resources, deliverables and the project goals in a timeline.
In project management, master schedule, project schedule and milestone schedule are three different schedules used for coordinating and tracking all of the different components of a project. Although each type of schedule plays an important role in completing a project on time and budget, they are different concepts.
In this article, we will discuss important time management concepts and their key differences.
For better understanding, let’s take a glance at the definitions.
Master Schedule, Milestone Schedule, Project Schedule
Before to start, let’s discuss the basic terms used in time management.
Milestone
According to PMBOK Guide, a milestone is “a significant event in the project usually completion of a major deliverable.”
∴Milestones have a fixed date but no duration.
Below are some examples of milestones in a project
Project Start and End
Start and Completion of each phase and/or discipline
Kick of Meeting
Site Handover
Sign of Contract
Schedule
A schedule represents the planned dates for performing activities and for meeting deliverables.
A schedule is a communication tool used to discuss what work needs to be done in order to complete the project.
Schedules are typically created at the beginning of a project and updated and reported regularly.
Project Scheduling Steps
An executable schedule can be created by following the project scheduling steps given below;
Creating and developing the Work Breakdown Structure (WBS) of the project
Defining work packages and major project deliverables
Defining the tasks
Defining relationships
Defining and assigning resources
Analyzing the critical path of the project
Development of the work breakdown structure (WBS) is one of the most important steps in scheduling. Because it creates a framework for a proper schedule.
Work packages are represented as the lowest level of detail within the WBS and the activities are grouped and listed under the work packages.
Activities are the actions which have a specific start date, end date, and duration. Relationships are the logic ties between the activities. They determine which activity will start or finish first in what type of logic.
Resources are materials, labor, and machinery required to perform the activities. Once they are estimated, they are assigned to the activities.
The last step is analyzing the schedule if it is realistic or not. You analyze and control the critical path of the schedule.
1. Milestone Schedule
A Milestone Schedule is a summary level schedule, which identifies the major project milestones.
Milestone planning focuses on milestones instead of activities. Major deliverables, significant events, contractual obligations, and the company’s strategic goals are demonstrated in milestone schedules.
Milestone schedules are one of the most important schedules that must be maintained and referred through the project life cycle. Simply put, a milestone schedule is a summary level schedule that helps the project team to review and track all the major project milestones that may exist during the execution of the project.
2. Master Schedule & Why is a Master Schedule Important?
A project manager’s primary responsibility is to complete the project on time and budget along with meeting the client’s requirements. Therefore scheduling the activities and resources efficiently plays a key role in any project’s success. The project master schedule is one of the most effective tools that help the project manager to perform his business.
Master Schedule is a summary level project schedule which incl
roject deliverables, work breakdown structure components, and key project milestones.
roject deliverables, work breakdown structure components, and key project milestones.
A project master schedule is an early communication tool among stakeholders which shows the major deliverables, key milestones, and summary of work breakdown structure activities.
Simply put, a master schedule is prepared for tracking the project at a summary level.
3. Project Schedule
A Project Schedule represents the planned dates for performing activities and the planned dates for meeting milestones.
The project schedule details what work needs to be done and which resources must be assigned in order to perform the tasks in a given time period. Engineering, Procurement, and Execution parts are detailed in Project Schedules.
The project schedule should be updated regularly in order to monitor the project’s performance.
Master Schedule vs Milestone Schedule
The detail level of a milestone schedule is lower than the detail level of a master schedule.
A milestone schedule includes major project milestones. On the other hand, a master schedule is a summary level project schedule which includes milestones, major deliverables, and work breakdown schedule components.
Summary
In order to keep track of all of the different components of a project, project teams create a number of schedules in different detail levels. Milestone Schedules and Master Schedules are summary level schedules prepared for early communication among stakeholders. These schedules are used to demonstrate the main strategy of the project. On the other hand, a project schedule is a detailed schedule which is prepared to show the detailed tasks required to complete the project and updated regularly to monitor the project’s performance.
In this article, we discuss the concept; master schedule vs milestone schedule. We hope that it will be useful for professionals and team members working in the field of time management.
A project master schedule is an early communication tool among stakeholders which shows the major deliverables, key milestones, and summary of work breakdown structure activities.
Simply put, a master schedule is prepared for tracking the project at a summary level.
3. Project Schedule
A Project Schedule represents the planned dates for performing activities and the planned dates for meeting milestones.
The project schedule details what work needs to be done and which resources must be assigned in order to perform the tasks in a given time period. Engineering, Procurement, and Execution parts are detailed in Project Schedules.
The project schedule should be updated regularly in order to monitor the project’s performance.
Master Schedule vs Milestone Schedule
The detail level of a milestone schedule is lower than the detail level of a master schedule.
A milestone schedule includes major project milestones. On the other hand, a master schedule is a summary level project schedule which includes milestones, major deliverables, and work breakdown schedule components.
Summary
In order to keep track of all of the different components of a project, project teams create a number of schedules in different detail levels. Milestone Schedules and Master Schedules are summary level schedules prepared for early communication among stakeholders. These schedules are used to demonstrate the main strategy of the project. On the other hand, a project schedule is a detailed schedule which is prepared to show the detailed tasks required to complete the project and updated regularly to monitor the project’s performance.
In this article, we discuss the concept; master schedule vs milestone schedule. We hope that it will be useful for professionals and team members working in the field of time management. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
roject deliverables, work breakdown structure components, and key project milestones.
A project master schedule is an early communication tool among stakeholders which shows the major deliverables, key milestones, and summary of work breakdown structure activities.
Simply put, a master schedule is prepared for tracking the project at a summary level.
3. Project Schedule
A Project Schedule represents the planned dates for performing activities and the planned dates for meeting milestones.
The project schedule details what work needs to be done and which resources must be assigned in order to perform the tasks in a given time period. Engineering, Procurement, and Execution parts are detailed in Project Schedules.
The project schedule should be updated regularly in order to monitor the project’s performance.
Master Schedule vs Milestone Schedule
The detail level of a milestone schedule is lower than the detail level of a master schedule.
A milestone schedule includes major project milestones. On the other hand, a master schedule is a summary level project schedule which includes milestones, major deliverables, and work breakdown schedule components.
Summary
In order to keep track of all of the different components of a project, project teams create a number of schedules in different detail levels. Milestone Schedules and Master Schedules are summary level schedules prepared for early communication among stakeholders. These schedules are used to demonstrate the main strategy of the project. On the other hand, a project schedule is a detailed schedule which is prepared to show the detailed tasks required to complete the project and updated regularly to monitor the project’s performance.
In this article, we discuss the concept; master schedule vs milestone schedule. We hope that it will be useful for professionals and team members working in the field of time management.
A project master schedule is an early communication tool among stakeholders which shows the major deliverables, key milestones, and summary of work breakdown structure activities.
Simply put, a master schedule is prepared for tracking the project at a summary level.
3. Project Schedule
A Project Schedule represents the planned dates for performing activities and the planned dates for meeting milestones.
The project schedule details what work needs to be done and which resources must be assigned in order to perform the tasks in a given time period. Engineering, Procurement, and Execution parts are detailed in Project Schedules.
The project schedule should be updated regularly in order to monitor the project’s performance.
Master Schedule vs Milestone Schedule
The detail level of a milestone schedule is lower than the detail level of a master schedule.
A milestone schedule includes major project milestones. On the other hand, a master schedule is a summary level project schedule which includes milestones, major deliverables, and work breakdown schedule components.
Summary
In order to keep track of all of the different components of a project, project teams create a number of schedules in different detail levels. Milestone Schedules and Master Schedules are summary level schedules prepared for early communication among stakeholders. These schedules are used to demonstrate the main strategy of the project. On the other hand, a project schedule is a detailed schedule which is prepared to show the detailed tasks required to complete the project and updated regularly to monitor the project’s performance.
In this article, we discuss the concept; master schedule vs milestone schedule. We hope that it will be useful for professionals and team members working in the field of time management. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
This media is not supported in your browser
VIEW IN TELEGRAM
Which load test would this be?
This media is not supported in your browser
VIEW IN TELEGRAM
Construction of bridge step by step
This media is not supported in your browser
VIEW IN TELEGRAM
Portland cement manufacturing process