👉CONSTRUCTION ENGINEERING TIPS @civil_Cotm_eng
.
*ASTM Abbrevation : American Society for Testing Materials
*Grade of Concrete is denoted as Cement: Sand: Aggregate (Ex C-20 Grade : 1:2:3)
*C/C means Center to Center Distance
*DL means Development Length
*Lapping of bars not allowed if the dia of bar is more than 36mm.
*For circular column minimum of 6 longitudinal bars are used and 4 for Rectangular.
*The minimum thickness of slab is 0.125m
*Water pH value less than 6 should not be used for construction purpose.
*The concrete Should not be thrown from a height more than 1.5m.
*The Compressive strength of Bricks is 3.5 N /mm
*The initial setting time shall not be less than 30 minutes and the final setting time of cement is 10hours.
*Dead Load means Self weight of Structure
*Sand having moisture content more than 5% should not be used for Concrete mix.
*DPC means Damp Proof Course. The thickness of DPC should not be less than 2.5cm.
*Cube test is carried out for each 30m usage of concrete.
*RMC : Ready Mix concrete, The concrete is made at factory and transported to the site, This type of concrete is used where there is a lack of space for mixing the concrete and used where a huge amount of concrete is required for construction.
*The height of floor is usually 3m or 10ft (If a person asks you whats the height of 12 storied building?
Ans: 3m x 12floors = 36m)
*A head mason can work 25-30m in a day.
*In construction, the rate analysis for the work of workers is calculated in Man Hours. (Ex: 10 Birr for 1 Man hour)
*Cantilever Beam has One fixed support and the other end is free.
*Simple supported beam has a minimum of two supports. @civil_Cotm_eng
*PCC (Plain Cement Concrete) this type of concrete is used on members only when the tensile forces are not acting on it.
*The weight of first class clay brick should be 3.85 Kg. and it has a crushing
strength of 10.5MN/m
*Adding more water in the concrete mix to increase setting time leads to form
the Cracks or honeycomb in hardened concrete.
*Vibration in freshly made concrete is done to remove the air bubbles in concrete mix.
*Impermeability of concrete: The concrete which resists the the entry of water or moisture into it.
*The concrete can be lifted to a maximum height of 50m using Concrete
Pumps.
*The curing Period of RCC is 28days .
*The minimum sill level height should be
44 inches.
*The transverse reinforcement provided in columns are called Ties .
*The transverse reinforcement provided in
Beams is called as Stirrups .
*Stirrups in Beams and Ties in Column are provided to handle the shear force and to keep longitudinal bars in position.
*The Prime reason for using steel as reinforcement is due to thermal expansion.
The thermal expansion
coefficient of concrete and steel is (approximately) same having value
*C-25 grade of concrete is generally used in the construction of slab.
*Weight of Bar is calculated using formula D /162 (D = Dia of bar in mm)
*The No. of HCB required for 1 metr square of masonary wall are 13 HCB blocks.
*Specific gravity of Cement is 3.16g/ cm ; Bricks is 2g/cm ; Sand is 2.65g/cm ,
*Standard Size of Brick is 19cm x 9cm x 4 cm or 19cm or 9cm x 9 cm
*Floor area occupied by 50kg of Cement bag is 0.3m and height of 0.18m.
*As per EBCS Maximum dia of bar used in the slab should not exceed 1/8th of the total thickness of the slab.
*The slope or Pitch of the stair should be in between 25 degrees to 40 degrees.
*The rise in stairs is in between 150mm to 200mm.
*Tread in staircase is in between 250mm to 300mm.
*Hook length should not be less than 9D (Dia of Bar)
*Unit weight of PCC is 24KN/m , RCC is 25 KN/m , Steel is 7850Kg/m
*The volume of 50kg cement bag is
1.3CFT.
*Theodolite least count is 20Secs whereas Compass Least count is 30mins .
*TMT bars : TMT means Thermo Mechanically treated bars
*Cement more than 3 months old cannot be used for construction
*The length of each bar from factory is 12m.
.
👉ለተጨማሪ የ ኮንስትራክሽን ትምህርቶች 🚩 እዚህ ይጫኑ
👇👇👇👇👇
@civil_Cotm_eng
.
*ASTM Abbrevation : American Society for Testing Materials
*Grade of Concrete is denoted as Cement: Sand: Aggregate (Ex C-20 Grade : 1:2:3)
*C/C means Center to Center Distance
*DL means Development Length
*Lapping of bars not allowed if the dia of bar is more than 36mm.
*For circular column minimum of 6 longitudinal bars are used and 4 for Rectangular.
*The minimum thickness of slab is 0.125m
*Water pH value less than 6 should not be used for construction purpose.
*The concrete Should not be thrown from a height more than 1.5m.
*The Compressive strength of Bricks is 3.5 N /mm
*The initial setting time shall not be less than 30 minutes and the final setting time of cement is 10hours.
*Dead Load means Self weight of Structure
*Sand having moisture content more than 5% should not be used for Concrete mix.
*DPC means Damp Proof Course. The thickness of DPC should not be less than 2.5cm.
*Cube test is carried out for each 30m usage of concrete.
*RMC : Ready Mix concrete, The concrete is made at factory and transported to the site, This type of concrete is used where there is a lack of space for mixing the concrete and used where a huge amount of concrete is required for construction.
*The height of floor is usually 3m or 10ft (If a person asks you whats the height of 12 storied building?
Ans: 3m x 12floors = 36m)
*A head mason can work 25-30m in a day.
*In construction, the rate analysis for the work of workers is calculated in Man Hours. (Ex: 10 Birr for 1 Man hour)
*Cantilever Beam has One fixed support and the other end is free.
*Simple supported beam has a minimum of two supports. @civil_Cotm_eng
*PCC (Plain Cement Concrete) this type of concrete is used on members only when the tensile forces are not acting on it.
*The weight of first class clay brick should be 3.85 Kg. and it has a crushing
strength of 10.5MN/m
*Adding more water in the concrete mix to increase setting time leads to form
the Cracks or honeycomb in hardened concrete.
*Vibration in freshly made concrete is done to remove the air bubbles in concrete mix.
*Impermeability of concrete: The concrete which resists the the entry of water or moisture into it.
*The concrete can be lifted to a maximum height of 50m using Concrete
Pumps.
*The curing Period of RCC is 28days .
*The minimum sill level height should be
44 inches.
*The transverse reinforcement provided in columns are called Ties .
*The transverse reinforcement provided in
Beams is called as Stirrups .
*Stirrups in Beams and Ties in Column are provided to handle the shear force and to keep longitudinal bars in position.
*The Prime reason for using steel as reinforcement is due to thermal expansion.
The thermal expansion
coefficient of concrete and steel is (approximately) same having value
*C-25 grade of concrete is generally used in the construction of slab.
*Weight of Bar is calculated using formula D /162 (D = Dia of bar in mm)
*The No. of HCB required for 1 metr square of masonary wall are 13 HCB blocks.
*Specific gravity of Cement is 3.16g/ cm ; Bricks is 2g/cm ; Sand is 2.65g/cm ,
*Standard Size of Brick is 19cm x 9cm x 4 cm or 19cm or 9cm x 9 cm
*Floor area occupied by 50kg of Cement bag is 0.3m and height of 0.18m.
*As per EBCS Maximum dia of bar used in the slab should not exceed 1/8th of the total thickness of the slab.
*The slope or Pitch of the stair should be in between 25 degrees to 40 degrees.
*The rise in stairs is in between 150mm to 200mm.
*Tread in staircase is in between 250mm to 300mm.
*Hook length should not be less than 9D (Dia of Bar)
*Unit weight of PCC is 24KN/m , RCC is 25 KN/m , Steel is 7850Kg/m
*The volume of 50kg cement bag is
1.3CFT.
*Theodolite least count is 20Secs whereas Compass Least count is 30mins .
*TMT bars : TMT means Thermo Mechanically treated bars
*Cement more than 3 months old cannot be used for construction
*The length of each bar from factory is 12m.
.
👉ለተጨማሪ የ ኮንስትራክሽን ትምህርቶች 🚩 እዚህ ይጫኑ
👇👇👇👇👇
@civil_Cotm_eng
✅‼️Briefly explain the functions of shear reinforcement.why minimum shear reinforcement is provided for beams? @civil_Cotm_eng
.
▶️Shear can cause distortion. Distortion leads to high stresses and strains.Hence resistance against shear will meet the requirement to resist the effects of shear.
▶️This is why you should specify some minimum shear reinforcement to avoid damage due to shear. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
.
▶️Shear can cause distortion. Distortion leads to high stresses and strains.Hence resistance against shear will meet the requirement to resist the effects of shear.
▶️This is why you should specify some minimum shear reinforcement to avoid damage due to shear. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
▶️WHAT IS SEGREGATION??
✓Segregation is a separation of cement from aggregate
✓This is caused due to improper water cement ratio
✓This is also caused when concrete is poured about more then 1.5m height
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
✓Segregation is a separation of cement from aggregate
✓This is caused due to improper water cement ratio
✓This is also caused when concrete is poured about more then 1.5m height
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
👉ስለ ብሎኬት
. @civil_Cotm_eng
⏩Hollow Concret Block (HCB) ወይም የግድግዳ ብሎኬት/Wall HCB/ በመባል ይታወቃል።
*የብሎኬት ምርት ሲደረግ ጠቀሜታው ለሁለት ጉዳይ ነው
1. ሸክም መቌቌም የሚችል/Load Bearing/
2. ሸክም መቌቌም የማይችል /Non-Load Bearing/
*ይሄንን መሰረት ያደረገም የደረጃ ክፍፍል/Class/ ይኖራቸዋል።
*ሸክም መቌቌም የሚችሉት ብሎኬቶች "ክላስ ኤ እና ቢ" /
Class A and B/ በመባል ሲመደቡ ሸክም መቌቌም
የማይችሉት የብሎኬቶች ደግሞ "ክላስ ሲ" /Class C/ በመባል
ይመደባሉ።
➡ብሎኬት በተለምዶ በመጠናቸው ባለ10፣ ባለ15 እና ባለ 20 በመባል ይለያሉ::
ርዝመት x ስፋት x ቁመት/ Length x width x depth/
ማለትም Standard Dimenssion
*40x20x20cm
*40x20x15cm
*40x20x10cm
➡እያንዳንዱ ብሎኬት ሸክም የመቌቌም አቅማቸው
በሜጋ ፓስካል(Mpa) ይለካል ከዚህ በላይ 👆 በምስል አስደግፈናል።
*Note:
1 kilogram per square centimetre = 0.0981 mega pascal
*Class A=3.8mpa
*Class B=3.2mpa
*Class C=1.8mpa .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
. @civil_Cotm_eng
⏩Hollow Concret Block (HCB) ወይም የግድግዳ ብሎኬት/Wall HCB/ በመባል ይታወቃል።
*የብሎኬት ምርት ሲደረግ ጠቀሜታው ለሁለት ጉዳይ ነው
1. ሸክም መቌቌም የሚችል/Load Bearing/
2. ሸክም መቌቌም የማይችል /Non-Load Bearing/
*ይሄንን መሰረት ያደረገም የደረጃ ክፍፍል/Class/ ይኖራቸዋል።
*ሸክም መቌቌም የሚችሉት ብሎኬቶች "ክላስ ኤ እና ቢ" /
Class A and B/ በመባል ሲመደቡ ሸክም መቌቌም
የማይችሉት የብሎኬቶች ደግሞ "ክላስ ሲ" /Class C/ በመባል
ይመደባሉ።
➡ብሎኬት በተለምዶ በመጠናቸው ባለ10፣ ባለ15 እና ባለ 20 በመባል ይለያሉ::
ርዝመት x ስፋት x ቁመት/ Length x width x depth/
ማለትም Standard Dimenssion
*40x20x20cm
*40x20x15cm
*40x20x10cm
➡እያንዳንዱ ብሎኬት ሸክም የመቌቌም አቅማቸው
በሜጋ ፓስካል(Mpa) ይለካል ከዚህ በላይ 👆 በምስል አስደግፈናል።
*Note:
1 kilogram per square centimetre = 0.0981 mega pascal
*Class A=3.8mpa
*Class B=3.2mpa
*Class C=1.8mpa .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
⏩ ስለ Slab
@civil_Cotm_eng
▶slabs are constructed to provide a flat surface usually horizontal in building floor, roof etc. They may be supported by beam or column.
classifications of slab
➡ .....one way
➡.....two way
.
* one way slab is a reinforced concrete slab which mainly distribute the loads in one direction( only in shorter direction). such a slab are designed by taking a unit width in longer direction.
.
*two way slabs are slab system which supported and distributed loads in its two directions( both longer and shorter direction). In this case reinforcements are also provided in both directions.
.
*The choice between different slab types of either one way or two way slab system is largely dependent on the architectural requirements and magnitude of loads.
.
*The practical two way slabs may includes
1- two way slab on beam
2- flat plates
3- flat slabs
4- waffle slabs
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
@civil_Cotm_eng
▶slabs are constructed to provide a flat surface usually horizontal in building floor, roof etc. They may be supported by beam or column.
classifications of slab
➡ .....one way
➡.....two way
.
* one way slab is a reinforced concrete slab which mainly distribute the loads in one direction( only in shorter direction). such a slab are designed by taking a unit width in longer direction.
.
*two way slabs are slab system which supported and distributed loads in its two directions( both longer and shorter direction). In this case reinforcements are also provided in both directions.
.
*The choice between different slab types of either one way or two way slab system is largely dependent on the architectural requirements and magnitude of loads.
.
*The practical two way slabs may includes
1- two way slab on beam
2- flat plates
3- flat slabs
4- waffle slabs
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
👉 Reasons for cause and description of type of cracks @civil_Cotm_eng
1. Diagonal Cracks
The main cause of diagonal cracks in concrete columns is 👉 Inadequate load carrying capacity of the columns;
👉 insufficient cross-section and inadequate reinforcement steel.
👉 Diagonal Cracks would influence structural soundness and hence it needs to be dealt with.
2. Horizontal Cracks
👉 Horizontal crack in reinforced concrete column is observed to initiate mostly at the beam-column junction, and on column face where tensile stress is large.
👉 Columns with in adequate moment resistance capacity,
👉 Insufficient reinforcements, or disposition of installed reinforcement are prone to horizontal cracking
👉 Horizontal cracks substantially reduce the shear strength of the column leading to a greatly increased risk of failure. So, it is required to be tackled as soon as
3. Splitting Cracks
👉 Splitting cracks in reinforced concrete column are short parallel vertical cracks with non-uniform width.
👉 Columns with Insufficient steel reinforcement, and low concrete quality are susceptible to experience such types of cracks.
👉 Splitting cracks in concrete columns initiated as a result of reaching its maximum load carrying capacity.
4. Corrosion Cracks
👉 Corrosion cracks in concrete columns are developed along the line of reinforcements.
👉 This type of cracks is commonly uniform in width and widen as the column is ageing.
👉 Possible reinforcement corrosion and inadequate bond between concrete and steel bars are the cause of corrosion reinforcement in concrete columns. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
1. Diagonal Cracks
The main cause of diagonal cracks in concrete columns is 👉 Inadequate load carrying capacity of the columns;
👉 insufficient cross-section and inadequate reinforcement steel.
👉 Diagonal Cracks would influence structural soundness and hence it needs to be dealt with.
2. Horizontal Cracks
👉 Horizontal crack in reinforced concrete column is observed to initiate mostly at the beam-column junction, and on column face where tensile stress is large.
👉 Columns with in adequate moment resistance capacity,
👉 Insufficient reinforcements, or disposition of installed reinforcement are prone to horizontal cracking
👉 Horizontal cracks substantially reduce the shear strength of the column leading to a greatly increased risk of failure. So, it is required to be tackled as soon as
3. Splitting Cracks
👉 Splitting cracks in reinforced concrete column are short parallel vertical cracks with non-uniform width.
👉 Columns with Insufficient steel reinforcement, and low concrete quality are susceptible to experience such types of cracks.
👉 Splitting cracks in concrete columns initiated as a result of reaching its maximum load carrying capacity.
4. Corrosion Cracks
👉 Corrosion cracks in concrete columns are developed along the line of reinforcements.
👉 This type of cracks is commonly uniform in width and widen as the column is ageing.
👉 Possible reinforcement corrosion and inadequate bond between concrete and steel bars are the cause of corrosion reinforcement in concrete columns. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
👍1
👆👆👆👆👆👆👆👆👆👆👆👆
:
▶️TODAY GREAT TIP @civil_Cotm_eng
:
👉አብዛኛዎቻቹ በጠየቃችሁን መሰረት ለ ሪሰርች እና THESIS ኣጋዥ የሆን ፋይሎች እንካቹ ብለናል፡፡ @civil_Cotm_eng
፡
🅾አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
:
▶️TODAY GREAT TIP @civil_Cotm_eng
:
👉አብዛኛዎቻቹ በጠየቃችሁን መሰረት ለ ሪሰርች እና THESIS ኣጋዥ የሆን ፋይሎች እንካቹ ብለናል፡፡ @civil_Cotm_eng
፡
🅾አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
➡ቅዳሜ ከ Ethio construction ጋር... @civil_Cotm_eng
.
Q- Roller Compacted Concrete (RCC) ከኖርማሉ ኮንክሪት በምን ይለያል??
.
A- Roller Compacted Concrete (RCC) ከኖርማሉ ኮንክሪት የሚለየው በ Mix ratio ነው፡፡ ይኸውም RCC ላይ የምንጠቀመው የውሀ መጠን በጣም አነስተኛ ነው፡፡ ኮንክሪቱ Compact የሚደረገው በሩሎ ወይም በ Roller Compactor ነው፡፡ በሀገራችንም ታላቁ የህዳሴ ግድብ (GRD) እና ግልገል ጊቤ 3 በዚህ ነው የተገነቡት፡፡ RCC ከኖርማሉ ኮንክሪት በተሻለ እድሜና ጥንካሬ አለው።
.
Q- Bending moment ቢም ላይ ትልቅ ተፅዕኖ የሚኖረው በምን Axis ላይ ነው?
A- Z axis ላይ
.
Q- elastic እና inelastic ማቴሪያሎች ልዩነታቸው ምንድነው? ductility ምንድነው?
A- Elastic material = load remove ሲደረግ ማቴሪያሉ ወደ ቀድሞ ቦታው የሚመለስ ከሆነ
.
Plastic / Inelastic Material = load remove ሲደረግ የተወሰነው የማቴሪያሉ አካል ወደ ቀድሞ ቦታው ሲመለስ ቀሪው አካሉ ደግሞ አይመለስም
.
Ductility = inelastic deformation ን የመቋቋም ብቃት
.
Q- Toughness ምንድነው?
A- Toughness = ክራክን የመቋቋም አቅም
.
Q- Maximum እና Minimum Bending Moment ?
A- Maximum Bending Moment = Shear Force Diagram(SFD) ከፖዘቲቭ ወደ ኔጌቲቭ የሚቀየርበት ነጥብ ላይ ነው Moment Maximum የሚሆነው
.
Minimum Bending Moment = SFD ከኔጌቲቭ ወደ ፖዘቲቭ የሚቀየርበት ነጥብ ላይ ይገኛል፡፡
Q- አንድ ህንፃ እኛ ዲዛይን ካደረግንበት ባነሰና በጣም ትንሽዬ በሆነ ሎድ ሊፈርስ ይችላል ? እንዴት??
.
A- ህንጻው መሸከም ከሚችለው ባነሰ በትንሽዬ ሎድ ሊፈርስ የሚችለው በሁለት ምክንያቶች ነው - በ Fatigue ና Creep
.
Fatigue = ሎዶቹ ትንንሽዬ ቢሆኑም እንኳን በሎድ ድግግሞሽ የተነሳ የህንጻው ጥንካሬ ሲደክም የሚፈጠር ነው፡፡ ይህ ሁኔታ በአብዛኛው የሚከሰተው ድልድዮች ላይ ነው - የመኪና ድግግሞሽ፡፡
.
Creep = አንድ ሎድ አንድ ቦታ ላይ ለብዙ ጊዜ በመቀመጡ ሳቢያ Strain ሲጨምር የሚፈጠር ነው፡፡ ከተመቻቹ ለ ዎዳጆ share👇👇👇👇👇
Join for more engineering updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆💚💛❤️
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
.
Q- Roller Compacted Concrete (RCC) ከኖርማሉ ኮንክሪት በምን ይለያል??
.
A- Roller Compacted Concrete (RCC) ከኖርማሉ ኮንክሪት የሚለየው በ Mix ratio ነው፡፡ ይኸውም RCC ላይ የምንጠቀመው የውሀ መጠን በጣም አነስተኛ ነው፡፡ ኮንክሪቱ Compact የሚደረገው በሩሎ ወይም በ Roller Compactor ነው፡፡ በሀገራችንም ታላቁ የህዳሴ ግድብ (GRD) እና ግልገል ጊቤ 3 በዚህ ነው የተገነቡት፡፡ RCC ከኖርማሉ ኮንክሪት በተሻለ እድሜና ጥንካሬ አለው።
.
Q- Bending moment ቢም ላይ ትልቅ ተፅዕኖ የሚኖረው በምን Axis ላይ ነው?
A- Z axis ላይ
.
Q- elastic እና inelastic ማቴሪያሎች ልዩነታቸው ምንድነው? ductility ምንድነው?
A- Elastic material = load remove ሲደረግ ማቴሪያሉ ወደ ቀድሞ ቦታው የሚመለስ ከሆነ
.
Plastic / Inelastic Material = load remove ሲደረግ የተወሰነው የማቴሪያሉ አካል ወደ ቀድሞ ቦታው ሲመለስ ቀሪው አካሉ ደግሞ አይመለስም
.
Ductility = inelastic deformation ን የመቋቋም ብቃት
.
Q- Toughness ምንድነው?
A- Toughness = ክራክን የመቋቋም አቅም
.
Q- Maximum እና Minimum Bending Moment ?
A- Maximum Bending Moment = Shear Force Diagram(SFD) ከፖዘቲቭ ወደ ኔጌቲቭ የሚቀየርበት ነጥብ ላይ ነው Moment Maximum የሚሆነው
.
Minimum Bending Moment = SFD ከኔጌቲቭ ወደ ፖዘቲቭ የሚቀየርበት ነጥብ ላይ ይገኛል፡፡
Q- አንድ ህንፃ እኛ ዲዛይን ካደረግንበት ባነሰና በጣም ትንሽዬ በሆነ ሎድ ሊፈርስ ይችላል ? እንዴት??
.
A- ህንጻው መሸከም ከሚችለው ባነሰ በትንሽዬ ሎድ ሊፈርስ የሚችለው በሁለት ምክንያቶች ነው - በ Fatigue ና Creep
.
Fatigue = ሎዶቹ ትንንሽዬ ቢሆኑም እንኳን በሎድ ድግግሞሽ የተነሳ የህንጻው ጥንካሬ ሲደክም የሚፈጠር ነው፡፡ ይህ ሁኔታ በአብዛኛው የሚከሰተው ድልድዮች ላይ ነው - የመኪና ድግግሞሽ፡፡
.
Creep = አንድ ሎድ አንድ ቦታ ላይ ለብዙ ጊዜ በመቀመጡ ሳቢያ Strain ሲጨምር የሚፈጠር ነው፡፡ ከተመቻቹ ለ ዎዳጆ share👇👇👇👇👇
Join for more engineering updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆💚💛❤️
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
🙏1
Reinforced Concrete LSD.pdf
5.5 MB
Reinforced Concrete LSD method handout with many questions and Answers. @civil_Cotm_eng
The handout contains:-
1. Single reinforced beam design
2. Double reinforced beam design.
3. Flanged (T or L) sectioned beam design.
The handout contains:-
1. Single reinforced beam design
2. Double reinforced beam design.
3. Flanged (T or L) sectioned beam design.
👉Overview of Dispute Resolution Procedures
. @civil_Cotm_eng
▶️Most contracts contain clauses for claim dispute resolution. The process usually starts with the simplest and quickest procedure then goes in to the next level and so on. Since the court system is lengthy, costly and complicated, other alternative dispute resolution methods have been used. The following methods are usually used in resolving dispute claims.
a)Negotiation: The most direct method for resolving any type of construction dispute. In many cases, the “truth” may not be entirely known or acknowledged and “fairness” is seen differently by the disputing parties. Negotiation requires certain skills that tend to reduce the gap between the negotiating parties. Although negotiation occurs basically between the disputing parties, independent experts or consultants may be asked to give opinions on certain issues.
b)Mediation: When negotiation does not work, either because of lack of trust or skills, an independent neutral or mediator may get involved to bring the disputing parties together. The mediator can be an individual or a team. The mediator must demonstrate neutrality and patience, and must collect all the facts before making any recommendation. The mediator must be skilled in narrowing the gap between the disputing parties and focusing on the positive side of any proposed solution.
c)Dispute Review Board: Rather than waiting until the end of a project to settle claims, dispute review boards (DRBs) may be used to resolve disputes as they arise on a construction project. An independent neutral panel with construction experience is selected by the owner and contractor when the contract is signed, and the parties agree to call upon the neutral to assist them in resolving dispute during construction.
*Negotiation, mediation and DRB’s are nonbinding. This means the solution changes its shape -like a piece of dough- during the process until it reaches a form acceptable to both parties. No party is under obligation until it accepts the proposed solution.
d)Arbitration: Arbitration is usually a formal process that is performed by an independent professional arbitrator. Arbitration in construction is usually performed by experts in the construction industry such as architects, engineers, or construction management professionals. Although arbitration is usually binding to both parties, arbitrators do not have the enforcement power that judges have.
It should be noted here that in many contracts, arbitration is specified as a binding process if negotiation and mediation fail. As mentioned above, unlike judges arbitrators cannot enforce their judgment. If a party refuses to comply with the arbitrator’s judgment, it may be necessary for the other party to seek a court’s intervention.
e) Litigation: If the parties cannot reach a settlement by one of the previous processes; the complaining party may sue the other party in a court of the law. The legal process is complex and often involves pri-trial discovery processes such as interrogatories (written questions to the other party) request for the production of documents and pri-trial testimony in depositions. Construction litigation is usually complicated, lengthy and expensive. Many plaintiffs spend more money on attorney’s fees than they later recover by the court’s judgment
.
👉Avoiding a Dispute
It is far better to avoid a dispute than to have to resolve one. D Some disputes cannot be prevented by prior action, but many can. Ensuring that a formal contract agreement is executed between parties to a contract is a first step towards avoiding disputes. Contractual precautions that provide some safeguard against disputes include ensuring the following things:
•The parties enter into a finalized contract before work commences;
•The scope of works is clearly defined prior to tender;
•The quality constraints are fully defined prior to tender;
•The conditions of the contract are fair & clear, using standard forms unless non standard provisions are essential.
. @civil_Cotm_eng
▶️Most contracts contain clauses for claim dispute resolution. The process usually starts with the simplest and quickest procedure then goes in to the next level and so on. Since the court system is lengthy, costly and complicated, other alternative dispute resolution methods have been used. The following methods are usually used in resolving dispute claims.
a)Negotiation: The most direct method for resolving any type of construction dispute. In many cases, the “truth” may not be entirely known or acknowledged and “fairness” is seen differently by the disputing parties. Negotiation requires certain skills that tend to reduce the gap between the negotiating parties. Although negotiation occurs basically between the disputing parties, independent experts or consultants may be asked to give opinions on certain issues.
b)Mediation: When negotiation does not work, either because of lack of trust or skills, an independent neutral or mediator may get involved to bring the disputing parties together. The mediator can be an individual or a team. The mediator must demonstrate neutrality and patience, and must collect all the facts before making any recommendation. The mediator must be skilled in narrowing the gap between the disputing parties and focusing on the positive side of any proposed solution.
c)Dispute Review Board: Rather than waiting until the end of a project to settle claims, dispute review boards (DRBs) may be used to resolve disputes as they arise on a construction project. An independent neutral panel with construction experience is selected by the owner and contractor when the contract is signed, and the parties agree to call upon the neutral to assist them in resolving dispute during construction.
*Negotiation, mediation and DRB’s are nonbinding. This means the solution changes its shape -like a piece of dough- during the process until it reaches a form acceptable to both parties. No party is under obligation until it accepts the proposed solution.
d)Arbitration: Arbitration is usually a formal process that is performed by an independent professional arbitrator. Arbitration in construction is usually performed by experts in the construction industry such as architects, engineers, or construction management professionals. Although arbitration is usually binding to both parties, arbitrators do not have the enforcement power that judges have.
It should be noted here that in many contracts, arbitration is specified as a binding process if negotiation and mediation fail. As mentioned above, unlike judges arbitrators cannot enforce their judgment. If a party refuses to comply with the arbitrator’s judgment, it may be necessary for the other party to seek a court’s intervention.
e) Litigation: If the parties cannot reach a settlement by one of the previous processes; the complaining party may sue the other party in a court of the law. The legal process is complex and often involves pri-trial discovery processes such as interrogatories (written questions to the other party) request for the production of documents and pri-trial testimony in depositions. Construction litigation is usually complicated, lengthy and expensive. Many plaintiffs spend more money on attorney’s fees than they later recover by the court’s judgment
.
👉Avoiding a Dispute
It is far better to avoid a dispute than to have to resolve one. D Some disputes cannot be prevented by prior action, but many can. Ensuring that a formal contract agreement is executed between parties to a contract is a first step towards avoiding disputes. Contractual precautions that provide some safeguard against disputes include ensuring the following things:
•The parties enter into a finalized contract before work commences;
•The scope of works is clearly defined prior to tender;
•The quality constraints are fully defined prior to tender;
•The conditions of the contract are fair & clear, using standard forms unless non standard provisions are essential.
Deformed_bars#??
@civil_Cotm_eng
ከባለ 6mm ዲያሜትር ብረት በስተቀር አብዛኛው ብረቶች ዙሪያቸውን ribs አለባቸው፡፡ ይህ የሆነበት ምክንያት በኮንክሪቱና በብረቱ መሃል bond እንዲኖርና ሎድ እንዲተላለፍ ነው፡፡ በተጨማሪም ስትራክቸሩ deflect በሚያደርግበት ጊዜ ብረቱ ለብቻው ተንሸራቶ እስትራክቸሩ fail እንዳያደርግ ይጠቅማል፡፡ R.C. Structure ዲዛይን ስናረግ assume ከምናደርጋቸው ውስጥ “ THE Reinforcement is Subjected To The Same Variation In The Strain As The Adjacent Concrete “ የሚለው assumption deformed bar እና development length በመጠቀማችን የተነሳ true ይሆናል::
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
@civil_Cotm_eng
ከባለ 6mm ዲያሜትር ብረት በስተቀር አብዛኛው ብረቶች ዙሪያቸውን ribs አለባቸው፡፡ ይህ የሆነበት ምክንያት በኮንክሪቱና በብረቱ መሃል bond እንዲኖርና ሎድ እንዲተላለፍ ነው፡፡ በተጨማሪም ስትራክቸሩ deflect በሚያደርግበት ጊዜ ብረቱ ለብቻው ተንሸራቶ እስትራክቸሩ fail እንዳያደርግ ይጠቅማል፡፡ R.C. Structure ዲዛይን ስናረግ assume ከምናደርጋቸው ውስጥ “ THE Reinforcement is Subjected To The Same Variation In The Strain As The Adjacent Concrete “ የሚለው assumption deformed bar እና development length በመጠቀማችን የተነሳ true ይሆናል::
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng