Which of the following is not a test for measuring workability of concrete?
Anonymous Quiz
4%
a. Flow test
9%
b. Slump test
65%
c. Std consistency test
22%
d. Kelly ball test
The stone whose crushing strength is maximum, is:
Anonymous Quiz
71%
a. Granite
11%
b. Chalk
9%
c. Slate
9%
d. Marble
Principles of planning for buildings include

a. Aspect and Prospect b. Roominess c. Grouping d. Flexibility and Privacy
Anonymous Quiz
8%
A. a and b only
12%
B. b and d only
6%
C. a and c only
73%
D. a, b, c and d
❤2
MACE Academy
f173bd86-3695-4de9-8e9f-08b5d56a363b_copy.pdf
Talathi post add in Group C form filling date extended
महाराष्ट्र नागरी सेवा राजपत्रित गट-अ व गट-ब संयुक्त पूर्व परीक्षा, महाराष्ट्र गट-ब (अराजपत्रित) सेवा पूर्व परीक्षा तसेच महाराष्ट्र गट-क सेवा पूर्व परीक्षा या वर्षातुन दोन किंवा अधिक वेळा घेण्याचा निर्णय स्थगित करण्याबाबत प्रसिद्धीपत्रक आयोगाच्या संकेतस्थळावर प्रसिद्ध करण्यात आले आहे.

Join : @macedhule
❤1
Among the following, who is considered as the father of scientific management?
Anonymous Quiz
3%
a. Max. Weber
36%
b. Henry Fayol
56%
c. F.W Taylor
5%
d. Elton Mayo
❤2😱1
The optimistic time, pessimistic time and most likely time required for completion of activity is 4, 11 and 6 days respectively. The expected time is
Anonymous Quiz
7%
a. 5 days
33%
b. 6 days
22%
5.5 days
39%
d. 6.5 days
❤2
Consider the following statements:

(I) Critical path is longest path in network (II) Critical path is obtained by joining the event having zero or minimum slack. No state whether
Anonymous Quiz
52%
a. Both I & II true
16%
b. Both I & II false
18%
c. ( I ) true , II false
15%
d. ( I ) false ,( II ) true
❤4🔥1
Consider the following statements:

i. PERT is activity oriented network diagram ii. CPM is event oriented network diagram
Anonymous Quiz
25%
a. Both i & ii true
17%
b.( i ) true ,( ii ) false
54%
c. Both i & ii false
4%
d. ( i ) False , ( ii ) true
❤2
At what change of price level is a revised estimate prepared ?
Anonymous Quiz
7%
a. 2 %
21%
b. 2.5
10%
c. 4 %
62%
d. 5%
❤2
The unit of measurement for earthwork in surface excavation exceeding 1.5 m in width as well as 10 sqm on plan but not exceeding 30 cm in depth, is in
Anonymous Quiz
32%
a. Cu.m
55%
b. Sq.m
14%
c.10 sq.m
0%
d.Rmt
🔥1