Junior Foreman (Factory)🔥
The ABC analysis in inventory control classifies items based on:
The ABC analysis in inventory control classifies items based on:
Anonymous Quiz
33%
Unit Price
50%
Annual Usage Value
0%
Criticality
17%
Storage Space
Junior Foreman (Factory)🔥
Which of the following is NOT a function of Management?
Which of the following is NOT a function of Management?
Anonymous Quiz
17%
Planning
17%
Organizing
67%
Machining
0%
Controlling
Junior Foreman (Factory)🔥
The time gap between placing an order and receiving the material is known as:
The time gap between placing an order and receiving the material is known as:
Anonymous Quiz
67%
Lead Time
33%
Cycle Time
0%
Takt Time
0%
Idle Time
Junior Foreman (Factory)🔥
Total Quality Management (TQM) focuses primarily on:
Total Quality Management (TQM) focuses primarily on:
Anonymous Quiz
0%
Reducing costs only
57%
Customer Satisfaction
29%
Increasing production volume
14%
Strict inspection
Junior Foreman (Factory)🔥
In a time study, the 'Rating Factor' is applied to the observed time to compensate for:
In a time study, the 'Rating Factor' is applied to the observed time to compensate for:
Anonymous Quiz
0%
Fatigue
33%
Allowances
67%
Worker's pace relative to standard pace
0%
Machine speed
Junior Foreman (Factory)🔥
Calculate the EOQ if Annual Demand (D) = 1000 units, Ordering Cost (Co) = ₹20 per order, and Carrying Cost (Ch) = ₹4 per unit per year.
Calculate the EOQ if Annual Demand (D) = 1000 units, Ordering Cost (Co) = ₹20 per order, and Carrying Cost (Ch) = ₹4 per unit per year.
Anonymous Quiz
0%
50 units
100%
100 units
0%
200 units
0%
10 units
Junior Foreman (Factory)🔥
Which organization structure is known as the simplest and oldest form?
Which organization structure is known as the simplest and oldest form?
Anonymous Quiz
14%
Functional Organization
43%
Line Organization
43%
Line and Staff Organization
0%
Matrix Organization
Junior Foreman (Factory)🔥
In Critical Path Method (CPM), the critical path is the:
In Critical Path Method (CPM), the critical path is the:
Anonymous Quiz
0%
Shortest path in the network
83%
Longest path in the network
0%
Path with maximum slack
17%
Path with minimum resources
Junior Foreman (Factory)🔥
Breakdown maintenance is also known as:
Breakdown maintenance is also known as:
Anonymous Quiz
50%
Corrective maintenance
38%
Preventive maintenance
0%
Predictive maintenance
13%
Scheduled maintenance
Junior Foreman (Factory)🔥
Make or Buy' decision is primarily based on the comparison of:
Make or Buy' decision is primarily based on the comparison of:
Anonymous Quiz
0%
Fixed costs
71%
Marginal costs
14%
Selling price
14%
Marketing costs
Junior Foreman (Factory)🔥
Which of the following factors is the primary consideration for selecting a site for a generic manufacturing plant?
Which of the following factors is the primary consideration for selecting a site for a generic manufacturing plant?
Anonymous Quiz
0%
Availability of cheap labour
83%
Proximity to raw materials and market
17%
Availability of recreational facilities
0%
Proximity to residential areas
Junior Foreman (Factory)🔥
In which type of plant layout are machines grouped according to the process or function they perform?
In which type of plant layout are machines grouped according to the process or function they perform?
Anonymous Quiz
33%
Product Layout
50%
Process Layout
17%
Fixed Position Layout
0%
Combination Layout
Junior Foreman (Factory)🔥
Shipbuilding and aircraft manufacturing typically use which type of plant layout?
Shipbuilding and aircraft manufacturing typically use which type of plant layout?
Anonymous Quiz
29%
Product Layout
14%
Process Layout
57%
Fixed Position Layout
0%
Cellular Layout
Junior Foreman (Factory)🔥
What does the symbol 'O' (Circle) represent in Method Study process charts?
What does the symbol 'O' (Circle) represent in Method Study process charts?
Anonymous Quiz
0%
Inspection
29%
Transportation
71%
Operation
0%
Storage
Junior Foreman (Factory)🔥
Which technique of Work Study is used to determine the standard time for a job?
Which technique of Work Study is used to determine the standard time for a job?
Anonymous Quiz
38%
Method Study
63%
Work Measurement
0%
Motion Study
0%
Micromotion Study
Junior Foreman (Factory)🔥
The standard time for a job is calculated as:
The standard time for a job is calculated as:
Anonymous Quiz
43%
Normal Time + Allowances
57%
Observed Time + Rating Factor
0%
Normal Time - Allowances
0%
Average Time x Rating Factor
Junior Foreman (Factory)🔥
In Production Planning and Control (PPC), 'Dispatching' refers to:
In Production Planning and Control (PPC), 'Dispatching' refers to:
Anonymous Quiz
0%
Deciding the path of work
0%
Assigning start and end times
100%
Authorizing the start of operations
0%
Checking the progress of work
Junior Foreman (Factory)🔥
Which chart is primarily used for scheduling and monitoring the progress of a project?
Which chart is primarily used for scheduling and monitoring the progress of a project?
Anonymous Quiz
0%
Pareto Chart
33%
Gantt Chart
44%
SIMO Chart
22%
Control Chart
Junior Foreman (Factory)🔥
The Break-Even Point (BEP) is the volume of production where:
The Break-Even Point (BEP) is the volume of production where:
Anonymous Quiz
56%
Total Revenue equals Total Costs
11%
Total Revenue exceeds Total Costs
33%
Variable Costs equal Fixed Costs
0%
Profit is Maximum
Junior Foreman (Factory)🔥
Calculate the Break-Even Quantity if Fixed Cost is ₹10,000, Selling Price per unit is ₹50, and Variable Cost per unit is ₹30.
Calculate the Break-Even Quantity if Fixed Cost is ₹10,000, Selling Price per unit is ₹50, and Variable Cost per unit is ₹30.
Anonymous Quiz
0%
200 units
86%
500 units
14%
1000 units
0%
333 units