👉ስለ STAIRS ትንሽ ጠቃሚ ሃሳብ እንማማር 👇
.
▶️Calculations for the construction of stairs, ramps and guards are set out in various national building regulations. The guidelines here are based on German standards.
.
▶️Dwellings with no more than two flats must have an effective stair width of at least 0.80 m and 17/29 rise-to-tread ratio. Stairs which are not strictly covered by building regulations may be as little as 0.50m wide and have a 21/21 ratio. Stairs governed by building regulations must have a width of 1.00m and a ratio of 17/28. In high rise flats they must be 1.25 m wide . The length of stair runs from 23 steps up to,,; 18 steps --> @. Landing length = n times the length of stride + 1 depth of step (e.g. with a rise-to-tread ratio of 17/29 = 1 x 63 + 29 = 92 cm or 2 x 63 + 29 = 1.55 m). Doors opening into the stairwell must not restrict the effective width.
▶️The time required for complete evacuation must be calculated for stair widths in public buildings or theatres. Such staircases or front entrance steps are climbed slowly, so they can have a more gradual ascent. A staircase at a side entrance or emergency stairs should make a rapid descent easy.
.
▶️The experiences one has of ascending and descending stairs varies greatly with the stair design, for example there is a significant difference between an interior domestic design and a grand flight of entrance steps. Climbing stairs takes on average seven times as much energy as walking on the flat. From the physiological point of view, the best use of 'climbing effort' is with an angle of incline of 30° and a ratio of rise of: rise of step/going of step; r/g= 17/29.
.
▶️The angle of rise is determined by the length of an adult's stride (about 61-64cm). To arrive at the optimum rise, which takes the least energy, the following formula can be applied:
2r+ g= 63cm (1 stride)
.
▶️In the dimensioning and design of flights of stairs, the function and purpose of the staircase is of primary importance, taking in the factors mentioned above.
.
▶️Not only is the gaining of height important, but also the way that the height is gained. For front door steps in frequent use, low steps of 16 x 30cm are preferable. However, stairs in a workplace, or emergency stairs, should enable height to be gained rapidly. Every main staircase must be set in its own continuous stairwell, which together with its access routes and exit to the open air, should be designed and arranged so as to ensure its safe use as an emergency exit. The width of the exit should be greater than or equal tothe width of the staircase.
Source: Neufert,Architect's data
.
👉 http://t.me/engineer03
.
▶️Calculations for the construction of stairs, ramps and guards are set out in various national building regulations. The guidelines here are based on German standards.
.
▶️Dwellings with no more than two flats must have an effective stair width of at least 0.80 m and 17/29 rise-to-tread ratio. Stairs which are not strictly covered by building regulations may be as little as 0.50m wide and have a 21/21 ratio. Stairs governed by building regulations must have a width of 1.00m and a ratio of 17/28. In high rise flats they must be 1.25 m wide . The length of stair runs from 23 steps up to,,; 18 steps --> @. Landing length = n times the length of stride + 1 depth of step (e.g. with a rise-to-tread ratio of 17/29 = 1 x 63 + 29 = 92 cm or 2 x 63 + 29 = 1.55 m). Doors opening into the stairwell must not restrict the effective width.
▶️The time required for complete evacuation must be calculated for stair widths in public buildings or theatres. Such staircases or front entrance steps are climbed slowly, so they can have a more gradual ascent. A staircase at a side entrance or emergency stairs should make a rapid descent easy.
.
▶️The experiences one has of ascending and descending stairs varies greatly with the stair design, for example there is a significant difference between an interior domestic design and a grand flight of entrance steps. Climbing stairs takes on average seven times as much energy as walking on the flat. From the physiological point of view, the best use of 'climbing effort' is with an angle of incline of 30° and a ratio of rise of: rise of step/going of step; r/g= 17/29.
.
▶️The angle of rise is determined by the length of an adult's stride (about 61-64cm). To arrive at the optimum rise, which takes the least energy, the following formula can be applied:
2r+ g= 63cm (1 stride)
.
▶️In the dimensioning and design of flights of stairs, the function and purpose of the staircase is of primary importance, taking in the factors mentioned above.
.
▶️Not only is the gaining of height important, but also the way that the height is gained. For front door steps in frequent use, low steps of 16 x 30cm are preferable. However, stairs in a workplace, or emergency stairs, should enable height to be gained rapidly. Every main staircase must be set in its own continuous stairwell, which together with its access routes and exit to the open air, should be designed and arranged so as to ensure its safe use as an emergency exit. The width of the exit should be greater than or equal tothe width of the staircase.
Source: Neufert,Architect's data
.
👉 http://t.me/engineer03
Telegram
Civil Engineering
*ለሲቪል ; ለአርክቴክቶች÷ለኮንስትራክሽን ÷ ለሀይድሮሊክ መሀንዲሶች እና ተማሪዎች የተዘጋጀ ትምህርታዊ ቻናል ፡፡
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
👉በኮንስትራክሽን ውል ጉዳይ የክፍያ ምስክር ወረቀት/payment certificate ምን ይላል?
፡
▶️የክፍያ ምስክር ወረቀት/payment certificate/ በአሰሪው በሚመደብ አማካሪ/ተቆጣጣሪ መሀንዲስ እና በተቋራጩ ተረጋግጦና ተማምነውበት የሚፈረም ሲሆን ለተቋራጩ የሚከፈለውን የገንዘብ መጠንም በግልጽ ያስቀምጣል፡፡
*የክፍያ ምስክር ወረቀት ጋር ቴክ ኦፍ ሽት እና ግራንድ ሳመሪ አባሪ ተደርጐ ይያያዛል፡፡
*ቴክ ኦፍ ሽት የአሰሪው አማካሪ/ተቆጣጣሪ መሀንዲስ እና የተቋራጩ መሀንዲስ በግንባታ ቦታ በአካል የሳይት ቪዚት በማካሄድ የተሰራውን ስራ መጠን እና አይነት ከለቀሙ በኋላ በቢል ኦፍ ኳንቲቲ ከተመለከተው የእያንዳንዱ ስራ አይተም ዩኒት ሬት/ነጠላ ዋጋ አንጻር በዝርዝር በተናጠል በዋጋ የሚያስቀምጡበት የተሰራውን ስራ መጠን እና የገንዘብ መጠን ገላጭ ዝርዝር ሰነድ ነው፡፡
*ግራንድ ሳመሪ ደግሞ በዋናነት የግንባታወችን ዝርዝር/ብሎክ በማስቀመጥ የውሉን ዋጋ፣አስቀድሞ የተከናወነ ስራ መጠን፣አሁን የተከናወነ ስራ መጠን እና አጠቃላይ በተቋራጩ የተሰራውን የግንባታ ስራ መጠን ይጠቅሳል፡፡
*የክፍያ ሰርተፍኬት በአብዛኛው በአንድ ገጽ ተጠቃሎ የሚዘጋጅ ሲሆን በይዘት ደረጃ ግን ብዙ መረጃወችን አምቆ የያዘ ሰነድ ነው፡፡
*የክፍያ ሰርተፍኬት በተለይ ክፍያው የመጀመሪያ ዙር፣ሁለተኛ ዙር እያለ በሚታወቅበት መንገድ የሚዘጋጅ ሲሆን የመጨረሻ ዙር ክፍያ የሚባልም አለው፡፡
*የመጀመሪያ ዙር ክፍያ የሚፈጸመው በአብዛኛው ከቅድሚያ ክፍያ በኋላ ሲሆን ክፍያውም ለተሰራ ስራ የሚፈጸም ነው፡፡
*የመጨረሻ ዙር ክፍያ ደግሞ ግንባታው ተጠናቆ ጊዜአዊ ርክክብ/provisional acceptance/ ከተከናወነ በኋላ በህግ ከተቀመጡ ተቀናሾች በስተቀር ቀሪውን የስራ ክፍያ ጠቅልሎ አካቶ ወዲያውኑ በግንባታ ውሉ በተቀመጠው የጊዜ ገደብ ውስጥ የሚፈጸም ክፍያ ነው፡፡
*የክፍያ ሰርተፍኬት የፕሮጀክቱን ስም፣ቦታ፣አሰሪውን፣ተቋራጩን፣አማካሪውን ይጠቅሳል፡፡ ዋናውን የውል ገንዘብ መጠን፣ተቀጽላ ስራዎችን፣ቫሬሽንን እና የተከናወነውን የስራ መጠን ያመለክታል፡፡ውሉ የተደረገበትን ጊዜ እና ኮመንስመንት ዴት ይጠቁማል፡፡በተጨማሪም የቅድሚያ ክፍያ መጠን እና አድቫንስ ሪፔይ ያመለክታል፡፡በዚህም አስቀድሞ የነበሩ የክፍያ ቁጥሮችን ጭምር ይጠቁማል፡፡ እንደዚሁም የሪቴንሽን መጠን እና የቅጣት መረጃንም የሚሰጥ ነው፡፡ እንግዲህ ይሄን ሁሉ መረጃ በያዘ የክፍያ ሰርተፍኬት ላይ አሰሪው/ተቆጣጣሪው/አማካሪው እና ተቋራጩ የሚፈራረሙበት ይሆናል፡፡
*ስለዚህ የክፍያ ሰርተፍኬት ጸደቀ ማለት በሰርተፍኬቱ ላይ የተመለከተው ስራ ስለመሰራቱ እና ዋጋውንም ጭምር አሰሪውና ተቋራጩ አምነውበታል ማለት ነው፡፡
*እዚህ ላይ መታወቅ ያለበት ነገር የአሰሪው ዋና ግዴታ ለተቋራጩ በወቅቱ ክፍያ መፈጸም ነው፡፡
*የፌዴራል ፕሮክዩርመንት ዳይሬክቲቭ ክሎስ 28.5 ላይ ስለኮንስትራክሽን ስራዎች ክፍያ እንዴት መፈጸም እንደሚገባው ይዘረዝራል፡፡
*በዚህ ረገድ በተለይ ክሎስ 28.5(a) ላይ የተቀመጠው እንደሚያስገነዝበው በኮንስትራክሽን ስራዎች ጉዳይ ክፍያ የሚፈጸመው በአማካሪው/ተቆጣጣሪው የተረጋገጠና የጸደቀ የክፍያ ምስክር ወረቀት/payment certificate/ እንዲቀርብ በማድረግ መሆኑን አስገዳጅ በሆነ ሁኔታ ይደነግጋል፡፡
*እንግዲህ የክፍያ ጥያቄ የሚያቀርብ በመጀመሪያ ተቋራጩ እንደመሆኑ አማካሪው/ተቆጣጣሪው መሀንዲስ የሳይት ቪዚት በማካሄድ የክፍያ ጥያቄውን ትክክለኛነት ካረጋገጠ በኋላ የክፍያ ሰርተፍኬቱን፣ቴክ ኦፍ ሽት እና ግራንድ ሳመሪውን ጨምሮ የሚያጸድቅና አረጋግጦ የሚፈርምበት እና በማህተምም የሚያረጋግጥ ይሆናል፡፡
*አማካሪው/ቶጣጣሪው በተቋራጩ የክፍያ ጥያቄ እንደቀረበለት በ7(ሰባት) ቀናት ውስጥ የማረጋገጡን ስራ ማጠናቀቅ እንደሚገባው በዳይሬክቲቩ ክሎስ 28.5(d) ላይ በአስገዳጅ ሁኔታ ተቀምጧል፡፡
*እንደዚሁም አሰሪው ደግሞ በአማካሪው/ተቆጣጣሪው የተረጋገጠ የክፍያ ሰርተፍኬት በደረሰው በ14(አስራ አራት) ቀናት ውስጥ ለተቋራጩ ክፍያውን መፈጸም እንደሚገባው በአስገዳጅ ሁኔታ ተደንግጓል፡፡
*እንግዲህ ተቋራጩ የክፍያ ሰርተፍኬት በእጁ ይዞ እያለ እና አሰሪውም ደርሶት እያለ ሳይከፍለው ያዘገየበት እንደሆነ በግንባታ ውሉ እና የውል አካል በሚያደርጉት ጀኔራል ኮንዲሽን በተመለከተው አግባብ ተቋራጩ ኪሳራ ከአሰሪው ላይ ለመጠየቅ እንደሚችል ዳይሬክቲቩ ክሎስ 28.5(g) በግልጽ እና በአስገዳጅ ሁኔታ ይደነግጋል፡፡
*ፒፒኤ 2011 ክሎስ 59 እንደዚሁ የኮንስትራክሽን ጉዳይ የስራ ክፍያ የሚፈጸመው በክፍያ ሰርተፍኬት አማካይነት ስለመሆኑ ይገልጻል፡፡
*በአጠቃላይ ከላይ የተመለከተው የክፍያ ሰርተፍኬት ባህሪ እና የፒፒኤ ድንጋጌ የሚያስገነዝበው ተቋራጩ የክፍያ ሰርተፍኬት በአማካሪው/ተቆጣጣሪው እስከጸደቀለት ድረስ ያለምንም ተጨማሪ ቅድመ ሁኔታ ክፍያ ሊፈጸምለት እንደሚገባ ነው፡፡ አመሰግናለሁ
. http://t.me/engineer03
፡
▶️የክፍያ ምስክር ወረቀት/payment certificate/ በአሰሪው በሚመደብ አማካሪ/ተቆጣጣሪ መሀንዲስ እና በተቋራጩ ተረጋግጦና ተማምነውበት የሚፈረም ሲሆን ለተቋራጩ የሚከፈለውን የገንዘብ መጠንም በግልጽ ያስቀምጣል፡፡
*የክፍያ ምስክር ወረቀት ጋር ቴክ ኦፍ ሽት እና ግራንድ ሳመሪ አባሪ ተደርጐ ይያያዛል፡፡
*ቴክ ኦፍ ሽት የአሰሪው አማካሪ/ተቆጣጣሪ መሀንዲስ እና የተቋራጩ መሀንዲስ በግንባታ ቦታ በአካል የሳይት ቪዚት በማካሄድ የተሰራውን ስራ መጠን እና አይነት ከለቀሙ በኋላ በቢል ኦፍ ኳንቲቲ ከተመለከተው የእያንዳንዱ ስራ አይተም ዩኒት ሬት/ነጠላ ዋጋ አንጻር በዝርዝር በተናጠል በዋጋ የሚያስቀምጡበት የተሰራውን ስራ መጠን እና የገንዘብ መጠን ገላጭ ዝርዝር ሰነድ ነው፡፡
*ግራንድ ሳመሪ ደግሞ በዋናነት የግንባታወችን ዝርዝር/ብሎክ በማስቀመጥ የውሉን ዋጋ፣አስቀድሞ የተከናወነ ስራ መጠን፣አሁን የተከናወነ ስራ መጠን እና አጠቃላይ በተቋራጩ የተሰራውን የግንባታ ስራ መጠን ይጠቅሳል፡፡
*የክፍያ ሰርተፍኬት በአብዛኛው በአንድ ገጽ ተጠቃሎ የሚዘጋጅ ሲሆን በይዘት ደረጃ ግን ብዙ መረጃወችን አምቆ የያዘ ሰነድ ነው፡፡
*የክፍያ ሰርተፍኬት በተለይ ክፍያው የመጀመሪያ ዙር፣ሁለተኛ ዙር እያለ በሚታወቅበት መንገድ የሚዘጋጅ ሲሆን የመጨረሻ ዙር ክፍያ የሚባልም አለው፡፡
*የመጀመሪያ ዙር ክፍያ የሚፈጸመው በአብዛኛው ከቅድሚያ ክፍያ በኋላ ሲሆን ክፍያውም ለተሰራ ስራ የሚፈጸም ነው፡፡
*የመጨረሻ ዙር ክፍያ ደግሞ ግንባታው ተጠናቆ ጊዜአዊ ርክክብ/provisional acceptance/ ከተከናወነ በኋላ በህግ ከተቀመጡ ተቀናሾች በስተቀር ቀሪውን የስራ ክፍያ ጠቅልሎ አካቶ ወዲያውኑ በግንባታ ውሉ በተቀመጠው የጊዜ ገደብ ውስጥ የሚፈጸም ክፍያ ነው፡፡
*የክፍያ ሰርተፍኬት የፕሮጀክቱን ስም፣ቦታ፣አሰሪውን፣ተቋራጩን፣አማካሪውን ይጠቅሳል፡፡ ዋናውን የውል ገንዘብ መጠን፣ተቀጽላ ስራዎችን፣ቫሬሽንን እና የተከናወነውን የስራ መጠን ያመለክታል፡፡ውሉ የተደረገበትን ጊዜ እና ኮመንስመንት ዴት ይጠቁማል፡፡በተጨማሪም የቅድሚያ ክፍያ መጠን እና አድቫንስ ሪፔይ ያመለክታል፡፡በዚህም አስቀድሞ የነበሩ የክፍያ ቁጥሮችን ጭምር ይጠቁማል፡፡ እንደዚሁም የሪቴንሽን መጠን እና የቅጣት መረጃንም የሚሰጥ ነው፡፡ እንግዲህ ይሄን ሁሉ መረጃ በያዘ የክፍያ ሰርተፍኬት ላይ አሰሪው/ተቆጣጣሪው/አማካሪው እና ተቋራጩ የሚፈራረሙበት ይሆናል፡፡
*ስለዚህ የክፍያ ሰርተፍኬት ጸደቀ ማለት በሰርተፍኬቱ ላይ የተመለከተው ስራ ስለመሰራቱ እና ዋጋውንም ጭምር አሰሪውና ተቋራጩ አምነውበታል ማለት ነው፡፡
*እዚህ ላይ መታወቅ ያለበት ነገር የአሰሪው ዋና ግዴታ ለተቋራጩ በወቅቱ ክፍያ መፈጸም ነው፡፡
*የፌዴራል ፕሮክዩርመንት ዳይሬክቲቭ ክሎስ 28.5 ላይ ስለኮንስትራክሽን ስራዎች ክፍያ እንዴት መፈጸም እንደሚገባው ይዘረዝራል፡፡
*በዚህ ረገድ በተለይ ክሎስ 28.5(a) ላይ የተቀመጠው እንደሚያስገነዝበው በኮንስትራክሽን ስራዎች ጉዳይ ክፍያ የሚፈጸመው በአማካሪው/ተቆጣጣሪው የተረጋገጠና የጸደቀ የክፍያ ምስክር ወረቀት/payment certificate/ እንዲቀርብ በማድረግ መሆኑን አስገዳጅ በሆነ ሁኔታ ይደነግጋል፡፡
*እንግዲህ የክፍያ ጥያቄ የሚያቀርብ በመጀመሪያ ተቋራጩ እንደመሆኑ አማካሪው/ተቆጣጣሪው መሀንዲስ የሳይት ቪዚት በማካሄድ የክፍያ ጥያቄውን ትክክለኛነት ካረጋገጠ በኋላ የክፍያ ሰርተፍኬቱን፣ቴክ ኦፍ ሽት እና ግራንድ ሳመሪውን ጨምሮ የሚያጸድቅና አረጋግጦ የሚፈርምበት እና በማህተምም የሚያረጋግጥ ይሆናል፡፡
*አማካሪው/ቶጣጣሪው በተቋራጩ የክፍያ ጥያቄ እንደቀረበለት በ7(ሰባት) ቀናት ውስጥ የማረጋገጡን ስራ ማጠናቀቅ እንደሚገባው በዳይሬክቲቩ ክሎስ 28.5(d) ላይ በአስገዳጅ ሁኔታ ተቀምጧል፡፡
*እንደዚሁም አሰሪው ደግሞ በአማካሪው/ተቆጣጣሪው የተረጋገጠ የክፍያ ሰርተፍኬት በደረሰው በ14(አስራ አራት) ቀናት ውስጥ ለተቋራጩ ክፍያውን መፈጸም እንደሚገባው በአስገዳጅ ሁኔታ ተደንግጓል፡፡
*እንግዲህ ተቋራጩ የክፍያ ሰርተፍኬት በእጁ ይዞ እያለ እና አሰሪውም ደርሶት እያለ ሳይከፍለው ያዘገየበት እንደሆነ በግንባታ ውሉ እና የውል አካል በሚያደርጉት ጀኔራል ኮንዲሽን በተመለከተው አግባብ ተቋራጩ ኪሳራ ከአሰሪው ላይ ለመጠየቅ እንደሚችል ዳይሬክቲቩ ክሎስ 28.5(g) በግልጽ እና በአስገዳጅ ሁኔታ ይደነግጋል፡፡
*ፒፒኤ 2011 ክሎስ 59 እንደዚሁ የኮንስትራክሽን ጉዳይ የስራ ክፍያ የሚፈጸመው በክፍያ ሰርተፍኬት አማካይነት ስለመሆኑ ይገልጻል፡፡
*በአጠቃላይ ከላይ የተመለከተው የክፍያ ሰርተፍኬት ባህሪ እና የፒፒኤ ድንጋጌ የሚያስገነዝበው ተቋራጩ የክፍያ ሰርተፍኬት በአማካሪው/ተቆጣጣሪው እስከጸደቀለት ድረስ ያለምንም ተጨማሪ ቅድመ ሁኔታ ክፍያ ሊፈጸምለት እንደሚገባ ነው፡፡ አመሰግናለሁ
. http://t.me/engineer03
Telegram
Civil Engineering
*ለሲቪል ; ለአርክቴክቶች÷ለኮንስትራክሽን ÷ ለሀይድሮሊክ መሀንዲሶች እና ተማሪዎች የተዘጋጀ ትምህርታዊ ቻናል ፡፡
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
✳️Types of Formwork
▶️Foundation Formwork. Foundation formworks can be designed in various ways. ...
▶️Wall Formwork. Wall formwork consists of vertically arranged upright timbers (formwork bearers) to which sheeting boards are nailed at the concrete side. ...
*Ceiling Formwork. ...
*Beam Formwork. ...
*Column Formwork.
✅Formwork functions
The formwork is the main means of work in the moulding process of the concrete. Basically the process of formwork making has to meet the following requirements: - The structural component to be produced is to be moulded with the projected dimensions keeping the admissible tolerances.
.
⚡http://t.me/engineer03
▶️Foundation Formwork. Foundation formworks can be designed in various ways. ...
▶️Wall Formwork. Wall formwork consists of vertically arranged upright timbers (formwork bearers) to which sheeting boards are nailed at the concrete side. ...
*Ceiling Formwork. ...
*Beam Formwork. ...
*Column Formwork.
✅Formwork functions
The formwork is the main means of work in the moulding process of the concrete. Basically the process of formwork making has to meet the following requirements: - The structural component to be produced is to be moulded with the projected dimensions keeping the admissible tolerances.
.
⚡http://t.me/engineer03
Telegram
Civil Engineering
*ለሲቪል ; ለአርክቴክቶች÷ለኮንስትራክሽን ÷ ለሀይድሮሊክ መሀንዲሶች እና ተማሪዎች የተዘጋጀ ትምህርታዊ ቻናል ፡፡
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
👉FACTORS AFFECTING CONCRETE STRENGTH
.
▶️Concrete strength is effected by many factors, such as quality of raw materials, water/cement ratio, coarse/fine aggregate ratio, age of concrete, compaction of concrete,
temperature, relative humidity and curing of concrete.
1. Quality of Raw Materials:
*Cement: Provided the cement conforms with the appropriate standard and it has been stored correctly (i.e. in dry conditions), it should be suitable for use in concrete.
*Aggregates: Quality of aggregates, its size, shape, texture,
strength etc determines the strength of concrete. The
presence of salts (chlorides and sulphates), silt and clay also
reduces the strength of concrete.
*Water: frequently the quality of the water is covered by a
clause stating “..the water should be fit for drinking..”. This
criterion though is not absolute and reference should be
made to respective codes for testing of water construction
purpose.
2. Water / Cement Ratio:
The relation between water cement ratio and strength of
concrete is shown in the plot as shown below:
The higher the water/cement ratio, the greater the initial spacing between the cement grains and the greater the
volume of residual voids not filled by hydration products.
There is one thing missing on the graph. For a given cement
content, the workability of the concrete is reduced if the
water/cement ratio is reduced. A lower water cement ratio
means less water, or more cement and lower workability.
However if the workability becomes too low the concrete
becomes difficult to compact and the strength reduces. For a
given set of materials and environment conditions, the
strength at any age depends only on the water-cement ratio,
providing full compaction can be achieved.
3. Coarse / fine aggregate ratio:
Following points should be noted for coarse/fine aggregate
ratio: If the proportion of fines is increased in relation to
the coarse aggregate, the overall aggregate surface
area will increase.
If the surface area of the aggregate has increased, the water demand will also increase.
*Assuming the water demand has increased, the
water cement ratio will increase Since the water cement ratio has increased, the compressive strength will decrease.
4. Aggregate / Cement Ratio:
*Following points must be noted for aggregate cement ratio:
If the volume remains the same and the proportion of cement in relation to that of sand is increased the surface area of the solid will increase.
*If the surface area of the solids has increased, the
water demand will stay the same for the constant
workability.
*Assuming an increase in cement content for no
increase in water demand, the water cement ratio will
decrease.
*If the water cement ratio reduces, the strength of
the concrete will increase.
*The influence of cement content on workability and strength
is an important one to remember and can be summarized as
follows:
1. For a given workability an increase in the proportion of
cement in a mix has little effect on the water demand and results in a reduction in the water/cement ratio.
2. The reduction in water/cement ratio leads to an increase
in strength of concrete.
3. Therefore, for a given workability an increase in the
cement content results in an increase in strength of concrete.
5. Age of concrete: The degree of hydration is synonymous with the age of concrete provided the concrete has not been allowed to dry out or the temperature is too low.
*In theory, provided the concrete is not allowed to dry out,
then it wil always be increasing albeit at an ever reducing
rate. For convenience and for most practical applications, it
is generally accepted that the majority of the strength has been achieved by 28 days.
6. Compaction of concrete: Any entrapped air resulting from inadequate compaction of the plastic concrete will lead to a reduction in strength.
If there was 10% trapped air in the concrete, the strength will fall down in the range of 30 to 40%. CONT'D 👇👇👇
.
▶️Concrete strength is effected by many factors, such as quality of raw materials, water/cement ratio, coarse/fine aggregate ratio, age of concrete, compaction of concrete,
temperature, relative humidity and curing of concrete.
1. Quality of Raw Materials:
*Cement: Provided the cement conforms with the appropriate standard and it has been stored correctly (i.e. in dry conditions), it should be suitable for use in concrete.
*Aggregates: Quality of aggregates, its size, shape, texture,
strength etc determines the strength of concrete. The
presence of salts (chlorides and sulphates), silt and clay also
reduces the strength of concrete.
*Water: frequently the quality of the water is covered by a
clause stating “..the water should be fit for drinking..”. This
criterion though is not absolute and reference should be
made to respective codes for testing of water construction
purpose.
2. Water / Cement Ratio:
The relation between water cement ratio and strength of
concrete is shown in the plot as shown below:
The higher the water/cement ratio, the greater the initial spacing between the cement grains and the greater the
volume of residual voids not filled by hydration products.
There is one thing missing on the graph. For a given cement
content, the workability of the concrete is reduced if the
water/cement ratio is reduced. A lower water cement ratio
means less water, or more cement and lower workability.
However if the workability becomes too low the concrete
becomes difficult to compact and the strength reduces. For a
given set of materials and environment conditions, the
strength at any age depends only on the water-cement ratio,
providing full compaction can be achieved.
3. Coarse / fine aggregate ratio:
Following points should be noted for coarse/fine aggregate
ratio: If the proportion of fines is increased in relation to
the coarse aggregate, the overall aggregate surface
area will increase.
If the surface area of the aggregate has increased, the water demand will also increase.
*Assuming the water demand has increased, the
water cement ratio will increase Since the water cement ratio has increased, the compressive strength will decrease.
4. Aggregate / Cement Ratio:
*Following points must be noted for aggregate cement ratio:
If the volume remains the same and the proportion of cement in relation to that of sand is increased the surface area of the solid will increase.
*If the surface area of the solids has increased, the
water demand will stay the same for the constant
workability.
*Assuming an increase in cement content for no
increase in water demand, the water cement ratio will
decrease.
*If the water cement ratio reduces, the strength of
the concrete will increase.
*The influence of cement content on workability and strength
is an important one to remember and can be summarized as
follows:
1. For a given workability an increase in the proportion of
cement in a mix has little effect on the water demand and results in a reduction in the water/cement ratio.
2. The reduction in water/cement ratio leads to an increase
in strength of concrete.
3. Therefore, for a given workability an increase in the
cement content results in an increase in strength of concrete.
5. Age of concrete: The degree of hydration is synonymous with the age of concrete provided the concrete has not been allowed to dry out or the temperature is too low.
*In theory, provided the concrete is not allowed to dry out,
then it wil always be increasing albeit at an ever reducing
rate. For convenience and for most practical applications, it
is generally accepted that the majority of the strength has been achieved by 28 days.
6. Compaction of concrete: Any entrapped air resulting from inadequate compaction of the plastic concrete will lead to a reduction in strength.
If there was 10% trapped air in the concrete, the strength will fall down in the range of 30 to 40%. CONT'D 👇👇👇
7. Temperature: The rate of hydration reaction is temperature dependent.
*If the temperature increases the reaction also increases. This
means that the concrete kept at hi gher temperature will gain
strength more quickly than a similar concrete kept at a lower
temperature. However, the final strength of the concrete kept at the higher temperature will be lower. This is because the physical form of the hardened cement paste is less well structured and more porous when hydration proceeds at faster rate.
*This is an important point to remember because temperature
has a similar but more pronounced detrimental effect on
permeability of the concrete.
8. Relative humidity: If the concrete is allowed to dry out, the hydration reaction will stop.
*The hydration reaction cannot proceed without
moisture. The three curves shows the strength development
of similar concretes exposed to different conditions.
9. Curing: It should be clear from what has been said above that the detrimental effects of storage of concrete in a dry
environment can be reduced if the concrete is adequately
cured to prevent excessive moisture loss.
.
▶️FOR MORE UPDATES ሼር
http://t.me/engineer03
*If the temperature increases the reaction also increases. This
means that the concrete kept at hi gher temperature will gain
strength more quickly than a similar concrete kept at a lower
temperature. However, the final strength of the concrete kept at the higher temperature will be lower. This is because the physical form of the hardened cement paste is less well structured and more porous when hydration proceeds at faster rate.
*This is an important point to remember because temperature
has a similar but more pronounced detrimental effect on
permeability of the concrete.
8. Relative humidity: If the concrete is allowed to dry out, the hydration reaction will stop.
*The hydration reaction cannot proceed without
moisture. The three curves shows the strength development
of similar concretes exposed to different conditions.
9. Curing: It should be clear from what has been said above that the detrimental effects of storage of concrete in a dry
environment can be reduced if the concrete is adequately
cured to prevent excessive moisture loss.
.
▶️FOR MORE UPDATES ሼር
http://t.me/engineer03
Telegram
Civil Engineering
*ለሲቪል ; ለአርክቴክቶች÷ለኮንስትራክሽን ÷ ለሀይድሮሊክ መሀንዲሶች እና ተማሪዎች የተዘጋጀ ትምህርታዊ ቻናል ፡፡
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
👉በኮንስትራክሽን ውል የግንባታ መዘግየት ቅጣት/Liquidated damage/
---------------
▶️በጉባዔ አሰፋ(ጠበቃና የህግ አማካሪ)
====================
*በኮንስትራክሽን ውል ላይ የውሉ የግንባታ ስራ ተብሎ የተቀመጠውን በዲዛይኑ እና ዝርዝር ስፔስፊኬሽኑ መሰረት በውሉ በተቀመጠው የጊዜ ገደብ ሰርቶ ማጠናቀቅ የተቋራጩ ሀላፊነት ነው፡፡
*ተቋራጩ የውሉን የግናባታ ስራ በውሉ በተቀመጠው የጊዜ ገደብ በወቅቱ ሰርቶ ያላጠናቀቀ እንደሆነ ከውሉ ማጠናቀቂያ ጊዜ/completion date/ በኋላ ግንባታው እስከሚጠናቀቅበት ጊዜ ድረስ ለእያንዳንዱ ቀን ተቋራጩ የግንባታ መዘግየት ቅጣት/Liquidated damage/ የመክፈል ሀላፊነት ይኖርበታል፡፡
*በውሉ በተቀመጠው የጊዜ ገደብ ሲባል ምን ማለት ነው? አንዳንድ አሰሪዎች/client/ በግንዛቤ እጥረት በውሉ ላይ የተቀመጠው ተቋራጩና አሰሪው ለግናባታው ማጠናቀቂያ የተስማሙበትን የቀን ብዛት/የጊዜ እርዝማኔ/ መቆጠር የሚጀምረው ውሉ በግራ ቀኙ ከተፈረመበት ቀን ጀምሮ እንደሆነ ይረዱታል፡፡ይሄ አረዳድ ስህተት ነው፡፡
*በኮንስትራክሽን ውል ስለ ጊዜ አቆጣጠር በተለይ የግንባታ ውል የተደረገበት ቀን/contract signing date/ ፣ሞቢላይዜሽን ፔሬድ/mobilization period/፣የሳይት ርክክብ/site handover/፣ የስራ መጀመሪያ ቀን/commencement date/ እና የስራ ማጠናቀቂያ ቀን/completion date/ የሚሉትን መረዳት የግንባታ መዘግየት ቅጣት/Liquidated damage/ የሚለውን በአግባቡ ለማወቅ ይጠቅማል፡፡
*በመሰረቱ በውሉ የተቀመጠው የስራ ማከናወኛ የጊዜ ገደብ መቆጠር የሚጀምረው ተቋራጩ የግናባታውን ሳይት ከአሰሪው ከተረከበ በኋላ ነው፡፡ይሄውም ከሳይት ርክክብ በኋላ የስራ መጀመሪያ ቀን /commencement date/ በመሀንዲሱ የሚወሰን እና ለተቋራጩ የሚገለጽለት ይሆናል፡፡
*እንግዲህ ከዚሁ በመሀንዲሱ ከሚወሰነው የስራ መጀመሪያ ቀን ጀምሮ በውሉ ላይ የተቀመጠው ቀን ይቆጠርና የስራ ማጠናቀቂያ ቀን/completion date/ መቸ እንደሆነ ለማወቅ ያስችላል ማለት ነው፡፡
*እዚህ ላይ ሊታወቅ የሚገባው ነገር በኮንስትራክሽን ውሉ ላይ የተወሰነውን የስራ ክፍል ከውሉ የማጠናቀቂያ ጊዜ አስቀድሞ ለማጠናቀቅ ውል ሊደረግ የሚችልበት እድልም አለ፡፡/part work completion/ ማለት ነው፡፡የቀን አቆጣጠሩ ከላይ እንደተብራራው የሚሰላ ይሆናል፡፡
*ስለሆነም የግንባታ መዘግየት ቅጣት የሚለው ጉዳይ የሚመጣው ተቋራጩ የውሉን የግንባታ ስራ በውሉ ስራ የማጠናቀቂያ ጊዜ /completion date/ ሳያጠናቅቅ የቀረ እንደሆነ ነው፡፡የገንዘብ ቅጣቱ የሚጣለው በተቋራጩ ላይ ነው፡፡ተቋራጩ ግንባታውን ላዘገየበት ለእያንዳንዱ ቀን በውሉ የተቀመጠውን የግንባታ መዘግየት ቅጣት የሚከፍል ይሆናል፡፡በነገራችን ላይ እየተቀጡ መስራት ለተቋራጩ መብትም ጭምር ነው፡፡ይህ ማለት አሰሪው የውሉ ማጠናቀቂያ ጊዜ ስላለቀ ውል አቋርጣለሁ ማለት አይችልም፡፡በውሉ ላይ የተቀመጠው የመዘግየት ቅጣት ጣሪያ መጠን ከሞላ በኋላ ግን አሰሪው ውል ማቋረጥ ይችላል፡፡ውል ከተቋረጠ በኋላ የመዘግየት ቅጣት የሚባል ነገርም የለም፡፡
*ሌላው ተቋራጩ ወደ መዘግየት ቅጣት እንዲገባ ከመደረጉ አስቀድሞ በአግባቡ መረጋገጥ ያለበት ነገር መሀንዲሱ ለተቋራጩ የጊዜ ማራዘሚያ/time extension/ ፈቅዷል ወይስ አልፈቀደም የሚለው ነጥብ ነው፡፡ምክንያቱም ለተቋራጩ የጊዜ ማራዘሚያ ተፈቅዶለት ከሆነ የግንባታ ማጠናቀቂያ ጊዜውም አብሮ ስለሚራዘምና ቀኑ ስለሚቀየር ነው፡፡
*የሀገራችንን የህግ ማእቀፍ በዚህ ረገድ ምን ይላል? የሚለውን ለመመለስ በፍትሀብሄር ህግ አንቀጽ 1887 እስከ 1895 ድረስ የተደነገጉትን መዳሰስ ይጠይቃል፡፡
*በፍትሀብሄር ህግ አንቀጽ 1889 ላይ ተዋዋዮች በውላቸው ምናልባት አንደኛው ወገን እንደውሉ ግዴታውን ያልፈጸመ እንደሆነ ወይም አጓድሎ የፈጸመ እንደሆነ ወይም አዘግይቶ የፈጸመ እንደሆነ የሚከፍለውን የመቀጮ መጠን አስቀድመው በውላቸው ለመወሰን እንደሚችሉ በሚፈቅድ መልኩ ተደንግጓል፡፡እዚህ ላይ የውል ግዴታን አዘግይቶ መፈጸም ስለሚያስከትለው ቅጣት የሚዋዋሉት በተለይ የግንባታ መዘግየት ቅጣት/liquidated damage/ የሚመለከት ይሆናል፡፡
*የመዘግየት ቅጣት ስምምነት ባለ ጊዜ አሰሪው የውሉ ስራ እንዲፈጸምና የቅጣት ገንዘቡንም ለመቀበል መብት እንደሚኖረው የፍ/ህ/ቁ 1890(2) ይደነግጋል፡፡እንደዚሁም አሰሪው ኪሳራ ባይደርስበት እንኳ የመዘግየት ቅጣት ገንዘቡ ሊከፈለው እንደሚገባ የፍ/ህ/ቁ 1892(1) ይደነግጋል፡፡እንግዲህ ተቋራጩ ግንባታውን በወቅቱ ያላጠናቀቀው አሰሪውን ሆነ ብሎ ለመጉዳት አስቦ ጉልህ በሆነ ቸልተኝነት ወይም በከባድ ጥፋት መሆኑ የተረጋገጠ እንደሆነ አሰሪው በውሉ ከተቀመጠው የቅጣት ገንዘብ በላይ በደረሰበት ትክክለኛ ጉዳት መጠን ልክ ከተቋራጩ ላይ ኪሳራ ለመጠየቅ እንደሚችል የፍ/ህ/ቁ 1892(2) ይደነግጋል፡፡
*ሌላው የመዘግየት ቅጣት መጠን በዳኞች ሊቀነስ የሚችልበት እድል ስለመኖሩ የፍ/ህ/ቁ 1893 ይደነግጋል፡፡ይሄውም ተቋራጩ ግዴታውን በከፊል የፈጸመ ሆኖ ሲገኝ ነው፡፡ይህ ማለት ተቋራጩ ባከናወነው ስራ ሁሉ ቅጣት የሚጣልበት አይሆንም ማለት ነው፡፡
*በዚህ ረገድ በሲቪል ግንባታ ስራዎች ቋሚ የውል መተዳደሪያ አንቀጽ 47(1) ላይ ተቋራጩ ስራውን በውሉ የማጠናቀቂያ ጊዜ ካላጠናቀቀ ለዘገየበት ለእያንዳንዱ ቀን የውሉን ዋጋ 1/1000 እንደሚከፍል እና ይሄውም አጠቃላይ መጠኑ ከውሉ ዋጋ ከ20% መብለጥ እንደማይችል ይደነግጋል፡፡ሆኖም ግን በከፊል ለተከናወነው ስራ መሀንዲሱ ማረጋገጫ ሰርተፍኬት በሰጠ ጊዜ የቅጣቱ መጠን የሚሰላው ባልተከናወነው ስራ መጠን ዋጋ ላይ በመመስረት ይሆናል ማለት ነው፡፡
*በመጨረሻም የመዘግየት ቅጣት በኛ ሀገር ከላይ እንዳየነው እንደቅጣት የሚቆጠርና በህጉ ቅጣቱ እውቅና የሚሰጠው ሲሆን በኮመን ሎው የህግ ስርአት ግን ቅጣት አይደለም፡፡በኮመን ሎው ሊኩዴትድ ዳሜጅ በአሰሪው ላይ ከደረሰው ጉዳት ጋር እኩል ሆኖ መመዛዘን የሚኖርበት ሲሆን የቅጣት አይነት ተመሳሳይ ባህሪ ካለው ተፈጻሚነት አይኖረውም፡፡ አመሰግናለሁ!
http://t.me/engineer03
---------------
▶️በጉባዔ አሰፋ(ጠበቃና የህግ አማካሪ)
====================
*በኮንስትራክሽን ውል ላይ የውሉ የግንባታ ስራ ተብሎ የተቀመጠውን በዲዛይኑ እና ዝርዝር ስፔስፊኬሽኑ መሰረት በውሉ በተቀመጠው የጊዜ ገደብ ሰርቶ ማጠናቀቅ የተቋራጩ ሀላፊነት ነው፡፡
*ተቋራጩ የውሉን የግናባታ ስራ በውሉ በተቀመጠው የጊዜ ገደብ በወቅቱ ሰርቶ ያላጠናቀቀ እንደሆነ ከውሉ ማጠናቀቂያ ጊዜ/completion date/ በኋላ ግንባታው እስከሚጠናቀቅበት ጊዜ ድረስ ለእያንዳንዱ ቀን ተቋራጩ የግንባታ መዘግየት ቅጣት/Liquidated damage/ የመክፈል ሀላፊነት ይኖርበታል፡፡
*በውሉ በተቀመጠው የጊዜ ገደብ ሲባል ምን ማለት ነው? አንዳንድ አሰሪዎች/client/ በግንዛቤ እጥረት በውሉ ላይ የተቀመጠው ተቋራጩና አሰሪው ለግናባታው ማጠናቀቂያ የተስማሙበትን የቀን ብዛት/የጊዜ እርዝማኔ/ መቆጠር የሚጀምረው ውሉ በግራ ቀኙ ከተፈረመበት ቀን ጀምሮ እንደሆነ ይረዱታል፡፡ይሄ አረዳድ ስህተት ነው፡፡
*በኮንስትራክሽን ውል ስለ ጊዜ አቆጣጠር በተለይ የግንባታ ውል የተደረገበት ቀን/contract signing date/ ፣ሞቢላይዜሽን ፔሬድ/mobilization period/፣የሳይት ርክክብ/site handover/፣ የስራ መጀመሪያ ቀን/commencement date/ እና የስራ ማጠናቀቂያ ቀን/completion date/ የሚሉትን መረዳት የግንባታ መዘግየት ቅጣት/Liquidated damage/ የሚለውን በአግባቡ ለማወቅ ይጠቅማል፡፡
*በመሰረቱ በውሉ የተቀመጠው የስራ ማከናወኛ የጊዜ ገደብ መቆጠር የሚጀምረው ተቋራጩ የግናባታውን ሳይት ከአሰሪው ከተረከበ በኋላ ነው፡፡ይሄውም ከሳይት ርክክብ በኋላ የስራ መጀመሪያ ቀን /commencement date/ በመሀንዲሱ የሚወሰን እና ለተቋራጩ የሚገለጽለት ይሆናል፡፡
*እንግዲህ ከዚሁ በመሀንዲሱ ከሚወሰነው የስራ መጀመሪያ ቀን ጀምሮ በውሉ ላይ የተቀመጠው ቀን ይቆጠርና የስራ ማጠናቀቂያ ቀን/completion date/ መቸ እንደሆነ ለማወቅ ያስችላል ማለት ነው፡፡
*እዚህ ላይ ሊታወቅ የሚገባው ነገር በኮንስትራክሽን ውሉ ላይ የተወሰነውን የስራ ክፍል ከውሉ የማጠናቀቂያ ጊዜ አስቀድሞ ለማጠናቀቅ ውል ሊደረግ የሚችልበት እድልም አለ፡፡/part work completion/ ማለት ነው፡፡የቀን አቆጣጠሩ ከላይ እንደተብራራው የሚሰላ ይሆናል፡፡
*ስለሆነም የግንባታ መዘግየት ቅጣት የሚለው ጉዳይ የሚመጣው ተቋራጩ የውሉን የግንባታ ስራ በውሉ ስራ የማጠናቀቂያ ጊዜ /completion date/ ሳያጠናቅቅ የቀረ እንደሆነ ነው፡፡የገንዘብ ቅጣቱ የሚጣለው በተቋራጩ ላይ ነው፡፡ተቋራጩ ግንባታውን ላዘገየበት ለእያንዳንዱ ቀን በውሉ የተቀመጠውን የግንባታ መዘግየት ቅጣት የሚከፍል ይሆናል፡፡በነገራችን ላይ እየተቀጡ መስራት ለተቋራጩ መብትም ጭምር ነው፡፡ይህ ማለት አሰሪው የውሉ ማጠናቀቂያ ጊዜ ስላለቀ ውል አቋርጣለሁ ማለት አይችልም፡፡በውሉ ላይ የተቀመጠው የመዘግየት ቅጣት ጣሪያ መጠን ከሞላ በኋላ ግን አሰሪው ውል ማቋረጥ ይችላል፡፡ውል ከተቋረጠ በኋላ የመዘግየት ቅጣት የሚባል ነገርም የለም፡፡
*ሌላው ተቋራጩ ወደ መዘግየት ቅጣት እንዲገባ ከመደረጉ አስቀድሞ በአግባቡ መረጋገጥ ያለበት ነገር መሀንዲሱ ለተቋራጩ የጊዜ ማራዘሚያ/time extension/ ፈቅዷል ወይስ አልፈቀደም የሚለው ነጥብ ነው፡፡ምክንያቱም ለተቋራጩ የጊዜ ማራዘሚያ ተፈቅዶለት ከሆነ የግንባታ ማጠናቀቂያ ጊዜውም አብሮ ስለሚራዘምና ቀኑ ስለሚቀየር ነው፡፡
*የሀገራችንን የህግ ማእቀፍ በዚህ ረገድ ምን ይላል? የሚለውን ለመመለስ በፍትሀብሄር ህግ አንቀጽ 1887 እስከ 1895 ድረስ የተደነገጉትን መዳሰስ ይጠይቃል፡፡
*በፍትሀብሄር ህግ አንቀጽ 1889 ላይ ተዋዋዮች በውላቸው ምናልባት አንደኛው ወገን እንደውሉ ግዴታውን ያልፈጸመ እንደሆነ ወይም አጓድሎ የፈጸመ እንደሆነ ወይም አዘግይቶ የፈጸመ እንደሆነ የሚከፍለውን የመቀጮ መጠን አስቀድመው በውላቸው ለመወሰን እንደሚችሉ በሚፈቅድ መልኩ ተደንግጓል፡፡እዚህ ላይ የውል ግዴታን አዘግይቶ መፈጸም ስለሚያስከትለው ቅጣት የሚዋዋሉት በተለይ የግንባታ መዘግየት ቅጣት/liquidated damage/ የሚመለከት ይሆናል፡፡
*የመዘግየት ቅጣት ስምምነት ባለ ጊዜ አሰሪው የውሉ ስራ እንዲፈጸምና የቅጣት ገንዘቡንም ለመቀበል መብት እንደሚኖረው የፍ/ህ/ቁ 1890(2) ይደነግጋል፡፡እንደዚሁም አሰሪው ኪሳራ ባይደርስበት እንኳ የመዘግየት ቅጣት ገንዘቡ ሊከፈለው እንደሚገባ የፍ/ህ/ቁ 1892(1) ይደነግጋል፡፡እንግዲህ ተቋራጩ ግንባታውን በወቅቱ ያላጠናቀቀው አሰሪውን ሆነ ብሎ ለመጉዳት አስቦ ጉልህ በሆነ ቸልተኝነት ወይም በከባድ ጥፋት መሆኑ የተረጋገጠ እንደሆነ አሰሪው በውሉ ከተቀመጠው የቅጣት ገንዘብ በላይ በደረሰበት ትክክለኛ ጉዳት መጠን ልክ ከተቋራጩ ላይ ኪሳራ ለመጠየቅ እንደሚችል የፍ/ህ/ቁ 1892(2) ይደነግጋል፡፡
*ሌላው የመዘግየት ቅጣት መጠን በዳኞች ሊቀነስ የሚችልበት እድል ስለመኖሩ የፍ/ህ/ቁ 1893 ይደነግጋል፡፡ይሄውም ተቋራጩ ግዴታውን በከፊል የፈጸመ ሆኖ ሲገኝ ነው፡፡ይህ ማለት ተቋራጩ ባከናወነው ስራ ሁሉ ቅጣት የሚጣልበት አይሆንም ማለት ነው፡፡
*በዚህ ረገድ በሲቪል ግንባታ ስራዎች ቋሚ የውል መተዳደሪያ አንቀጽ 47(1) ላይ ተቋራጩ ስራውን በውሉ የማጠናቀቂያ ጊዜ ካላጠናቀቀ ለዘገየበት ለእያንዳንዱ ቀን የውሉን ዋጋ 1/1000 እንደሚከፍል እና ይሄውም አጠቃላይ መጠኑ ከውሉ ዋጋ ከ20% መብለጥ እንደማይችል ይደነግጋል፡፡ሆኖም ግን በከፊል ለተከናወነው ስራ መሀንዲሱ ማረጋገጫ ሰርተፍኬት በሰጠ ጊዜ የቅጣቱ መጠን የሚሰላው ባልተከናወነው ስራ መጠን ዋጋ ላይ በመመስረት ይሆናል ማለት ነው፡፡
*በመጨረሻም የመዘግየት ቅጣት በኛ ሀገር ከላይ እንዳየነው እንደቅጣት የሚቆጠርና በህጉ ቅጣቱ እውቅና የሚሰጠው ሲሆን በኮመን ሎው የህግ ስርአት ግን ቅጣት አይደለም፡፡በኮመን ሎው ሊኩዴትድ ዳሜጅ በአሰሪው ላይ ከደረሰው ጉዳት ጋር እኩል ሆኖ መመዛዘን የሚኖርበት ሲሆን የቅጣት አይነት ተመሳሳይ ባህሪ ካለው ተፈጻሚነት አይኖረውም፡፡ አመሰግናለሁ!
http://t.me/engineer03
Telegram
Civil Engineering
*ለሲቪል ; ለአርክቴክቶች÷ለኮንስትራክሽን ÷ ለሀይድሮሊክ መሀንዲሶች እና ተማሪዎች የተዘጋጀ ትምህርታዊ ቻናል ፡፡
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
👉አሁን እስቲ ስለ Pile foundation ትንሽ እንበል...
.
▶️Pile foundations are the part of a structure used to carry and transfer the load of the structure to the bearing ground located at some depth below ground surface.
*The main components of the foundation are the pile cap and the piles.
*Piles are relatively long and slender members used to transmit foundation loads through soil strata of low bearing capacity to deeper soil or rock having a higher bearing capacity
፡
❇️The purpose of apile foundation
💠to transmit a foundation load to a solid ground
💠to resist vertical ,lateral and uplift load
💠to reduce excessive settlement
፡
✅ When pile foundation is used ??
➡️The soil near the surface does not have sufficient bearing capacity to support the structural loads
➡️The estimate settlement of the soil exceed tolerable limits
➡️Differential settlement due to soil variability is happen
➡️The structural loads consist of lateral loads ,moments & uplift force singly or in combination
፡
✳️pile capacity
🔴The ultimate bearing capacity of a pile is the maximum load which it can carry without failure or excessive settlement of the ground
🔴The allowable load on a pile is the load which can be imposed upon it with an adequate margin of safety ,it may be the ultimate load divided by a suitable factor of safety,or the load at which the settlement reaches the allowable value
:
🅾The bearing capacity of apile depends on:-
👉The method of installation
👉pile c-xes such as pile length ,cross section ,and shape
👉soil configuration and short and long-term soil properties.
: http://t.me/engineer03
👉FOR MORE
.
▶️Pile foundations are the part of a structure used to carry and transfer the load of the structure to the bearing ground located at some depth below ground surface.
*The main components of the foundation are the pile cap and the piles.
*Piles are relatively long and slender members used to transmit foundation loads through soil strata of low bearing capacity to deeper soil or rock having a higher bearing capacity
፡
❇️The purpose of apile foundation
💠to transmit a foundation load to a solid ground
💠to resist vertical ,lateral and uplift load
💠to reduce excessive settlement
፡
✅ When pile foundation is used ??
➡️The soil near the surface does not have sufficient bearing capacity to support the structural loads
➡️The estimate settlement of the soil exceed tolerable limits
➡️Differential settlement due to soil variability is happen
➡️The structural loads consist of lateral loads ,moments & uplift force singly or in combination
፡
✳️pile capacity
🔴The ultimate bearing capacity of a pile is the maximum load which it can carry without failure or excessive settlement of the ground
🔴The allowable load on a pile is the load which can be imposed upon it with an adequate margin of safety ,it may be the ultimate load divided by a suitable factor of safety,or the load at which the settlement reaches the allowable value
:
🅾The bearing capacity of apile depends on:-
👉The method of installation
👉pile c-xes such as pile length ,cross section ,and shape
👉soil configuration and short and long-term soil properties.
: http://t.me/engineer03
👉FOR MORE
Telegram
Civil Engineering
*ለሲቪል ; ለአርክቴክቶች÷ለኮንስትራክሽን ÷ ለሀይድሮሊክ መሀንዲሶች እና ተማሪዎች የተዘጋጀ ትምህርታዊ ቻናል ፡፡
@engineer03
http://www.Indiabix.com በዚህ ደግሞ ማንኛውንም ጥያቄና መልስ ታገኛላችሁ!
╯▅╰╱▔▔▔▔▔▔▔╲╯╯☼
▕▕╱╱╱╱╱╱╱╱┛▂╲╲╭
╱▂▂▂▂▂▂╱╱┏▕╋▏╲╲
▔▏▂┗┓▂▕▔┛▂┏▔▂▕▔
▕▕╋▏▕╋▏▏▕┏▏▕
@engineer03