ቤት እና የክልል ኮንስትራክሽን ቢሮዎችም በጉዳዩ ላይ አጋዥ ሆነው መንቀሳቀስ ይኖርባቸዋል፡፡
አመሰግናለሁ!!!!
* * ***
ስለፀሀፊው/About the writer
Gubaie Assefa, Lawyer
ጠበቃና የህግ አማካሪ,09-75-576924,
gubabelte@gmail.com
LL.M Candidate in Construction Law and Dispute Resolution @ Bahir Dar University School of Law, On-site building construction management L4-Bahir Dar Poly Technic College, LL.B from Addis Ababa University School of law, writer about construction law@ National construction magazine

https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
➡Center of gravity Vs Centroid

Center of Gravity = አንድ አካል በብዙ ጥቃቅን አካላት
የተመሰረተና የእነዚህ አካላት ስብስብ መሆኑ ይታወቃል፡፡ እናም
እነዚህ አካላት የየራሳቸው weight ወይም ክብደት አላቸው -
weighታቸውንም በአንድ weight መወከል እንችላለን ይህም
Resultant ይባላል፡፡ ይህ Resultant act የሚያደርግበት ቦታ
Center of Gravity ይባላል፡፡
.
Center of Mass = ከCenter of Gravity ጋር የሚለያየው በ
‘Weight’ ቦታ ‘Mass’ ስናስገባበት Center Of Mass
እናገኛለን (W = mg)
.
Centroid = የአንድ አካል ቅርፅ ላይ ( length , width &
height ) ላይ የሚመሰረት የአካሉ መሃከለኛ ቦታ ነው፡፡ እንዲሁ
በተለምዶ የአንድ አካል መሃል ነው የምንለው ነጥብ Centroid
ነው፡፡ ለምሳሌ የአራት መአዘን መሀል አሳይ ስትባል የምታሳየው
ቦታ
.
Centroid of a Volume = centroid of ቁመት - ርዝመትና
ወርድ ያለው አካል ወይም 3D object
Centroid of an Area = 2D ወይም ስፋትና ርዝመት ብቻ
ያለው አካል centroid
Centroid of a Line = ርዝመት ብቻ ያለው አካል centroid
ለምሳሌ ገመድ
.
Centroid ና Center of Gravity አንድ ነጥብ ላይ የሚሆኑት
አካሉ ሙሉ ለሙሉ አንድ ወጥ ከሆነ material ከተሰራ ነው -
density ከተለያየ ሁለቱ ነጥቦች የሚያርፉበት ቦታም ይለያያል፡፡
https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
👍1
👉TYPES OF DRAWINGS USED IN BUILDING
CONSTRUCTION


~~~~~~~~~~~~~~~~
⏩Drawings are the most important things we need to start any construction project. There are different
types of drawings for different purposes. In this
article, we will discuss different types of
construction drawings (also known as working
drawing).
*Construction drawings provide detail measurements and clear section of every building parts.
After reviewing, the drawings are justified and modified and finally approved for construction. *The different types of construction drawings are listed below.👇
.
1 ARCHITECTURAL DRAWING: This type of drawing provides complete view of a building. It demonstrates the location of building and all building parts where they will be placed.
*There are different types of architectural drawings
with different names such as plan, elevation, section
etc.
.
2 STRUCTURAL DRAWING:
As the name suggests, this type of drawing provides information about structure, like strength of
different structural elements, structural materials, grade, size and placement of reinforcement etc.
.
3 ELECTRICAL DRAWING:
This type of drawings provide the details and
location of electrical wiring, fixtures, substation
etc. The electrical load calculation is also given in
the drawing.
.
4 PLUMBING AND SANITARY DRAWINGS:
These drawings give the location of sanitary, piping
for water supply system, fixture, and the process to
connect every fixture etc
. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።

👇👇👇👇👇👇👇👇👇👇 https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
👉Water we used for mixing Concrete
.
◇ water is needed for two purposes:
1. Chemical Reaction with cement
2. Workability
□ water is good for preventing plastic shirnkage
cracking and workability.
.
■ Water is bad for permeability, strength, durability.
.
● Impurities in mixing water may cause:
○ Abnormal setting time
○ decreased strength
○ Volume changes
○ Efflorescence
○ Corrosion of reinforcement

https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
Importance of Surveying

The knowledge of surveying is advantageous in many
phases of engineering. Surveying is of vital importance in
any engineering project.
Some of the basic importance of
Surveying is discussed below.
The first necessity in surveying is to prepare a plan
and a section of an area to be covered by the project.
From these prepared maps and sections the best
possible alignment, amount of earthwork and other
necessary details depending upon the nature of the
project can be calculated.
The planning and design of all Civil Engineering
projects such as railways, highways, tunneling,
irrigation , dams, reservoirs, waterworks, sewerage
works, airfields, ports, massive buildings, etc. are
based upon surveying measurements.
During execution of the project of any magnitude is
constructed along the lines and points established by
surveying.
The measurement of land and the fixation of its
boundaries cannot be done without surveying.
The economic feasibility of the engineering feasibility
of a project cannot be properly ascertained without
undertaking a survey work.
The execution of hydrographic and oceanographic
charting and mapping requires.
Surveying is used to prepare a topographic map of a
land surface of the earth.
https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
List out some of the software used in the construction
sector to estimate cost and monitoring expenses?


• Tally System
• Sage
• Maxwell System
• Premier construction software
• eTakeoff
• Construction partner, etc.
https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
These are Haunch bars which are generally used in RCC water retaining structures like water treatment plants, sewage treatment plant etc and also used in Box culverts to attain extra strength and resist the bending moment at supports. In Ground level reservoir, the water pressure at bottom is very high, hence to reduce the hoop tension the haunch bars are provided.https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
Bent up bars

Are the main reinforcements bent at a suitable angle to act as shear reinforcements.
Reinforcements are bent up to the supports/ends where greater compressive force occurs.

Bars Are Bend Near At Support To:

1- To resist shear force .
2-To resist (NBM) adjacent at supports.
3- To increment the strenth of RCC in  slab.
4- Bent Up bar can abate the amount of steel.
5- Bent up bars in slab is more strong form normal slab.
6- Bent up bars sufficiently increase the deformation capacityof slabs as compared to those not having bars bent.
7- By extending bars up to supports, we can also lower the risk of brittle failure due to higher compressive stresses causing the structure to collapse.
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።

👇👇👇👇👇
Join for more updates via the link below;https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
Different Types Of Loads On Building (In Short)

 Types of loads

👉External loads on a structure may be classified in several different ways. In one classification, they may be considered as static or dynamic.

🔵  Static loads are forces that are applied slowly and then remain nearly constant.

-One example is the weight, or dead load, of a floor or roof system.
🔵  Dynamic loads vary with time. They include repeated and impact loads.

🟠   Repeated loads are forces that are applied a number of times, causing a variation in the magnitude, and sometimes also in the sense, of the internal forces. A good example is an off-balance motor.

🟠 Impact loads are forces that require a structure or its components to absorb energy in a short interval of time. An example is the dropping of a heavy weight on a floor slab, or the shock wave from an explosion striking the walls and roof of a building.

🟠    External forces may also be classified as distributed and concentrated.

🟠   Uniformly distributed loads are forces that are, or for practical purposes may be considered, constant over a surface area of the supporting member. Dead weight of a rolled-steel I beam is a good example.

🟠  Concentrated loads are forces that have such a small contact area as to be negligible compared with the entire surface area of the supporting member. A beam supported on a girder, for example, may be considered, for all practical purposes, a concentrated load on the girder.

🟠   Another common classification for external forces labels them axial, eccentric, and torsional.

🟠 An axial load is a force whose resultant passes through the centroid of a section under consideration and is perpendicular to the plane of the section.

🟠 An eccentric load is a force perpendicular to the plane of the section under consideration but not passing through the centroid of the section, thus bending the supporting member.

🔵 Torsional loads are forces that are offset from the shear center of the section under consideration and are inclined to or in the plane of the section, thus twisting the supporting member.

🟠Also, building codes classify loads in accordance with the nature of the source.

🔵Dead loads include materials, equipment, constructions, or other elements of weight supported in, on, or by a building, including its own weight, that are intended to remain permanently in place.
🔵 Live loads include all occupants, materials, equipment, constructions, or other elements of weight supported in, on, or by a building and that will or are likely to be moved or relocated during the expected life of the building.

🔵Impact loads are a fraction of the live loads used to account for additional stresses and deflections resulting from movement of the live loads.

🔵  Wind loads are maximum forces that may be applied to a building by wind in a mean recurrence interval, or a set of forces that will produce equivalent stresses.

🔵Snow loads are maximum forces that may be applied by snow accumulation in a mean recurrence interval.

🔵 Seismic loads are forces that produce maximum stresses or deformations in a building during an earthquake.

 source :-EngineeringC
https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
👍2
Tests on Concrete

The following are some of the important tests conducted on concrete:

1. Slump test.
2. Compaction factor test.
3. Crushing strength test.
1. Slump Test:
This test is conducted to determine the workability of concrete. It needs a slump
cone for test Slump cone is a vessel in the shape of a frustum of a cone with diameter at bottom 200mm and 50mm at top and 300 mm high. This cone is kept over a impervious platform and is filled with concrete in four layers. Each layer is tamped with a 16 mm pointed rod for 25 times. After filling completely the cone is gently pulled up. The decrease in the height of the concrete is called slump. Higher the slump, more workable is the concrete.

2. Compaction Factor Test:
This is another test to identify the workability of concrete. This test is conducted in the laboratory. The test equipment consists of two hoppers and a cylinder fixed to a stand, the dimensions and the distances between the three vessels being standardized.
Vessel A and B are having hinged bottoms whereas cylinder C is having fixed bottom. Top vessel A is filled with the concrete to be tested. As soon as it is filled, the hinged door is opened. Concrete is collected in vessel B. Then the hinged door of B is opened to collect concrete in cylinder C. The concrete in cylinder C is weighted.
Let it be W1.Now cylinder is again filled with the sample of concrete in 50 mm layers, which is compacted by ramming and vibrating. Then the weight of compacted concrete is determined. Let this weight be W2. The ratio W1/W2 is termed as compaction factor.

3. Crushing Strength Test: Metallic moulds of size 150 mm × 150 mm × 150 mm are used for
casting concrete cubes. Before filling mould, it is properly oiled on its inner surfaces, so that cubes can be easily separated. Fresh cube is filled with concrete to be tested in 3 layers and kept in the room. After 24 hours, cube is removed from the mould and kept under water for curing.
After 28 days of curing cubes are tested in the compression testing machine. In this test cubes are placed over the smooth surface which is in contact with side plates of mould. The crushing load is noted and crushing strength is found as load divided by surface area (150 × 150 mm2).
Code specify the desirable strength of concrete for 3 days and 7 days for quick assessment of strength of concrete.Desirable Properties of Concrete Appropriate quality and quantity of cement, fine aggregate, coarse aggregate and water should be used so that the green concrete has the following properties:
(a) Desired workability
(b) No segregation in transporting and placing
(c) No bleeding and
(d) No harshness.

Hardened concrete should have
(a) required characteristic strength
(b) minimum dimensional changes
(c) good durability
(d) impermeable
(e) good resistance to wear and tear.
https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
👍1
👉Are you supervisor/Inspector/Resident Engineer??

▶What are good quality of them.
.
♡ supervision is important to ensure the structure
being executed are constructed according to Design, Specification, code requirement as well as accepted practice.
.
♡ these are quality of Good supervisor
.
1. Observation Skill:
2. Technical skill: Familiar with current technology
and code standard
3. Communication Skill: Written and oral, Listening
and speaking.
4. Negotiating: about Scope, cost or schedule
objective, resource assignment.
5. Problem solving skill: decision making at the
right time
6. Analytical skills: looking at the big picture while
at the same time separately understanding critical elements.

https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
An effective damp proofing material should have the following properties;

1. It should be impervious.

2. It should be strong and durable, and should be capable of withstanding both dead as well as live loads without damage.

3. It should be dimensionally stable.

4. It should be free from deliquescent salts like sulphates, chlorides and nitrates.

👇👇👇👇👇 https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
🏛Importance of Zoning.

Zoning is an important adjunct of any town planning. Zoning sets apart different areas in the town for specific purposes. It prevents encroachment of one zone upon another adjacent to it. For instance, the industrial area is located away from the residential area so it is not affected by dangerous gases, smoke etc. Business or Commercial areas are also separately located with their garages and service stations at a distance from the residential areas. As such the residential areas are free from noise, bustle of the road traffic. The population is distributed throughout the town by zoning regulation so that there is no concentration of population in any one particular zone. Height zoning regulates the height of the buildings. Hence high rise buildings will not be allowed to construct near small houses. Otherwise they cut off the sunshine, air and breeze thereby making the life of the residents uncomfortable. A land in the form of recreational area is also set aside providing therein the playgrounds, parks, stadiums, theatres, etc. in pleasing surroundings.

Zoning helps proper co-ordination of various public amenities like water supply, drainage, electricity, transport etc. In short zoning secures orderly growth of the town, promotes health, safety, order. It increases utility, beauty, efficiency of the town in general. In fact it is the very life and soul of the successful town-planning. Classification of Zoning. Generally zoning is classified as under :

👉Use Zoning
👉Height Zoning and
👉 Density Zoning

Via:- EngineeringC

https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
Common Construction Materials store On Site


🏗Storing Of Bricks On Site

🏗Storing Of Steel On Site

🏗 Storing Of Cement On Site

🏗Storing Of Aggregates On Site

🏗Storing Of Timber On Site    

🏗Storing Of Concrete Blocks On Site



GUIDELINES TO FOLLOW WHILE STORING BLOCKS ON SITE

While storing these concrete blocks at site, following guidelines should be followed.

🚫  Do not dump concrete blocks at site.

📛Store the blocks close to the site of work so that least effort is required for their transportation.

⛔️ Unload one block at a time and stack it in regular tiers to minimize breakage and defacement.

⛔️ The height of the stack should not be more than 1.2 m. the length of the stack should not be more than 3 m. and width of the stack should not be more than 2 to 3 blocks.

⛔️  If blocks are cured for less than 28 days, then stack these blocks separately.
https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
Responsibilities of personnel at the site

@ethioengineers1

1,Project manager: - is a person responsible for managing the whole site work execution. He is also responsible for
making payment to sub contract workers, approving material request, analyzing work process, executing sub-contracting
agreements and issues the grant of higher power of working class etc.
2,Office engineer: - is the second power holder in the contractor side. He is responsible for preparing daily labors
output reports, organizing monthly report to be sent, scheduling weekly or monthly work implementation checking and
reviewing any sub contract payments and quantifies any materials on request etc.
3,Site engineer: - Control execution of project
- Check material measurement
4,General foreman: - on a smaller project a general foreman may be assigned to organize and lead the work. The
foreman should have extensive labor, material and schedule.
5,Data collector: - is a person responsible for collecting any data for the project, reporting the daily activities to site or
office engineer and also preparing monthly summary report etc.
6,Store keeper: - is a person responsible for controlling, managing and register all materials which are going out/in to
the store and also balancing the material consumed with the unconsumed one etc.
7, Time keeper: - is a person responsible for controlling the time workers stats, breaks and ends. He is responsible for
register ordinary time amount and over time works.
8, Gang leaders: - is a person responsible for controlling group of daily labors in a specific activity, assigning laborers
to activities and reporting any difficulties to general foreman.
9, Skilled man power: - those are carpenters, masons, mixer operators… etc.
10,Daily laborers: - are unskilled man workers who work as assigned on a specific activity.
11,Guards: - is responsible for keeping the site safe and follow activity of the site.
12,Driver: - includes small to large truck drivers. Transports purchased materials.
13, Machines: - operate, fix and maintain different machineries on the site like, vibrator, mixer, generator, loader, dozer,
excavator… etc
❤1👍1
👉 የትኛው ኢኮኖሚካል ነው ?? => Flat Plate, Waffle, Flat
with Drop or Solid Slab

.
.
በጠቅላላው በፍሎር ደረጃ ኢሄኛው የተሻለ ኢኮኖሚካል ነው
አይደለም ለማለት Quantity ካልሰራን ለማወቅ አስቸጋሪ ነው ….
በፓኔል ደረጃ ( ስለአንድ እስላብ ብቻ ) ካወራን ግን EBCS
ሪኮመንድ የሚያረጋቸው የስላብ አይነቶች አሉ ፡፡ ሪኮመንዴሽኑ
100 ፐርሰንት ትክክል ነው ማለት አይደለም - ኢኮኖሚካል ነው
ለማለት ጂኦሜትሪንና የፌሮ ብዛትን ግምት ውስጥ ማስገባት
አለብን - ስለዚህ አሁንም 100 ፐርሰንት እርግጠኛ የምንሆነው
ኳንቲቲ በመስራት ብቻ ነው፡፡ ነገር ግን ኮዱ ባደረገው ጥናት
መሰረት ከኮለን እስከ ኮለን ያለውን ርቀት መሰረት አድርጎ
ኢኮኖሚካል ነው ያለውን የስላብ አይነት አስቀምጡዋል፡፡
እነዚህም፡
.
.
1. Flat Plate - ሎዱ ቀላል ከሆነና ከኮለን ሴንተር እስከ ኮለን
ሴንተር ከ4.5 እስከ 6ሜ ለሆነ ስላብ ኢኮኖሚካል ነው
.
2. Flat Slab With Drop - ከባድ ሎድ ካለና ከሴንተር -
ሴንተር ከ6 እስከ 9ሜ. ለሆነ እስላብ ኢኮኖሚካል ነው፡፡
.
3. Waffle Slab - ለትልቅ እስፓን ከ7.5 – 12ሜ………
ለትልቅ እስፓን ከmoment ይልቅ vertical load ገቨርን
ስለሚያደርግ መሃል ስፓን ላይ ያለውን የስላብ ውፍረት መቀነስ
እንችላለን - ዋፍል ስላብ በመጠቀም ማለት ነው፡፡
.
4. Ribbed Slab -ትልቅ ስፓን ላላቸውና ከቀላል እስከ
መካከለኛ የሆነ ተንቀሳቃሽ ሎድ ላላቸው ፓኔሎች ኢኮኖሚካል
ነው፡፡
.
5. Solid Slab - የስፓኑ ርዝመት በጨመረ ቁጥር ኢኮኖሚካል
አይደለም፡፡ ፍላት ስላቦች ናቸው ኢኮኖሚካል የሚሆኑት
ምክንያቱም የፍላት ስላብ ብረት አቀማመጥ በ Strip ስለሆነ
የፌሮ ብዛት ይቀንሳል::
https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
👍1
PLOT AREA:

---Plot area commonly known as site area is a piece of land enclosed by definite boundaries. The mean horizontal distance between the front and rear site boundaries is known as depth of the plot area.

BUILT UP AREA OR PLINTH AREA:

Built up area is the total covered area measured at the floor level of the basement or of any storey. That means the area covered by a typical building or flat. It is also known as plinth area.

Areas included in built-up area:

Bedrooms, living room, hall, balcony, kitchen, bathroom, utility area, shafts, staircase, terrace, verandah, Wall thickness.

SUPER BUILT UP AREA:

The built-up area plus common proportionate areas such as swimming pool, garden, park, gym, playground etc is known as super built-up area.

Areas included in super built-up area:

Swimming pool, garden, park, gym, playground, clubhouse, and other amenities.

CARPET AREA:

Carpet area is the area excluding the walls of built-up area. In simple words, it is the internal space within the walls which you can actually use. Usually, carpet area is around 70 -90 % of the built-up area.

SETBACK AREA:

The area on all sides of the plot boundaries laid down by the local municipal authority beyond which nothing can be constructed toward the plot boundary is known as setback area.

The line usually parallel to the plot area on each side is call setback line. This area helps a building to get more daylight and fresh air to the street leve
l.https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
👉 Reasons for cause and description of type of cracks


1. Diagonal Cracks

The main cause of diagonal cracks in concrete columns is
👉 Inadequate load carrying capacity of the columns;
👉 insufficient cross-section and inadequate reinforcement steel.
👉 Diagonal Cracks would influence structural soundness and hence it needs to be dealt with.

2. Horizontal Cracks

👉 Horizontal crack in reinforced concrete column is observed to initiate mostly at the beam-column junction, and on column face where tensile stress is large.
👉 Columns with in adequate moment resistance capacity,
👉 Insufficient reinforcements, or disposition of installed reinforcement are prone to horizontal cracking

👉 Horizontal cracks substantially reduce the shear strength of the column leading to a greatly increased risk of failure. So, it is required to be tackled as soon as

3. Splitting Cracks

👉 Splitting cracks in reinforced concrete column are short parallel vertical cracks with non-uniform width.
👉 Columns with Insufficient steel reinforcement, and low concrete quality are susceptible to experience such types of cracks.
👉 Splitting cracks in concrete columns initiated as a result of reaching its maximum load carrying capacity.

4. Corrosion Cracks

👉 Corrosion cracks in concrete columns are developed along the line of reinforcements.
👉 This type of cracks is commonly uniform in width and widen as the column is ageing.

👉 Possible reinforcement corrosion and inadequate bond between concrete and steel bars are the cause of corrosion reinforcement in concrete columns. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇
https://t.me/joinchat/AAAAAEo_NBVYFBTZCKpA4w
❤1
እንኳን ለእናቶች ቀን አደረሳችሁ

@ethioengineers1
የፕሮጀክት አስተዳዳሪዎች ምን ያደርጋሉ? 8 ቁልፍ ሚናዎች እና ኃላፊነቶች

1. እንቅስቃሴ እና ሀብት ዕቅድ

እቅድ የፕሮጀክት ቀነ-ገደቦችን ለማሟላት አስፈላጊ ነው ፣ እና ብዙ ፕሮጄክቶች በጥሩ ዕቅድ ምክንያት ይሳካል። በመጀመሪያ እና ከሁሉም በላይ ፣ ጥሩ የፕሮጀክት አስተዳዳሪዎች የፕሮጀክቱን ወሰን ይገልፃሉ እናም የሚገኙትን ሀብቶች ይወስናሉ ፡፡ ጥሩ የፕሮጀክት አስተዳዳሪዎች እንዴት የቡድን ወይም የቡድን አቅሞችን በእውነተኛ ጊዜ ማዋቀር እና መገምገም እንደሚችሉ ያውቃሉ ፡፡

ከዚያ ፕሮጀክቱን ለማስፈፀም እና እድገቱን ለመቆጣጠር ግልፅ እና እጥር ምጥን ዕቅድ ይፈጥራሉ ፡፡ ፕሮጀክቶች በተፈጥሮ ሊተነበዩ የማይችሉ ናቸው ፣ ስለሆነም ጥሩ የፕሮጀክት አስተዳዳሪዎች ፕሮጀክቱ የመጨረሻ ደረጃ ላይ ከመድረሱ በፊት አስፈላጊ ሆኖ ሲገኝ ማስተካከያዎችን እንዴት እንደሚያደርጉ ያውቃሉ ፡፡

2. የፕሮጀክት ቡድን ማደራጀት እና ማነሳሳት

ጥሩ የፕሮጀክት አስተዳዳሪዎች ቡድኖቻቸው በዝርዝር የተመን ሉህዎች ፣ ረጅም ማጣቀሻዎች እና በነጭ ሰሌዳዎች እንዲታሰሩ አያደርጉም። ይልቁንም ቡድኖቻቸውን የፊት እና የመሃል ላይ አደረጉ ፡፡ ቡድኖቻቸውን ሙሉ አቅማቸውን ለማሳካት ግልጽ እና ቀጥተኛ ዕቅዶችን ያዳብራሉ ፡፡ ቢሮክራሲን በመቁጠር ቡድኖቻቸውን ወደ የመጨረሻ ግብ ለመምራት ግልፅ መንገድን ይመራሉ ፡፡

3. የጊዜ አያያዝን መቆጣጠር

ደንበኞች ብዙውን ጊዜ የፕሮጀክቱን ስኬት ወይም ውድቀት በሰዓቱ ማድረሱ ላይ ይፈርዳሉ። ስለዚህ የስምምነት ቀኖችን መገናኘት ድርድር የሚደረግ አይደለም ፡፡ ጥሩ የፕሮጀክት አስተዳዳሪዎች ተጨባጭ ቀነ-ገደቦችን እንዴት ማቀናጀት እንዳለባቸው እና እንዴት ለቡድኖቻቸው በተከታታይ እንዴት መገናኘት እንደሚችሉ ያውቃሉ ፡፡

የሚከተሉትን ውጤታማ በሆነ መንገድ እንዴት ማድረግ እንደሚችሉ ያውቃሉ-

እንቅስቃሴን ይግለጹ
ቅደም ተከተል እንቅስቃሴ
የእንቅስቃሴውን ቆይታ ይገምቱ
መርሐግብር ያዘጋጁ
የጊዜ ሰሌዳ ይኑርህ
4. ወጪ መገመት እና በጀቱን ማጎልበት

ጥሩ የፕሮጀክት አስተዳዳሪዎች አንድን በጀት በተያዘለት በጀት ውስጥ አንድ ፕሮጀክት እንዴት ማቆየት እንደሚችሉ ያውቃሉ ፡፡ ምንም እንኳን አንድ ፕሮጀክት የደንበኞቹን ፍላጎቶች የሚያሟላ እና በሰዓቱ ቢቀርብለት እንኳን ከበጀት በላይ ቢወጣ አሁንም ውድቀት ይሆናል። ጥሩ የፕሮጀክት አስተዳዳሪዎች ብዙ ጊዜ በጀቱን ይገመግማሉ እና ግዙፍ የበጀት አጠቃቀምን ለማስወገድ አስቀድሞ ያቅዱ ፡፡

5. የደንበኞችን እርካታ ማረጋገጥ

በመጨረሻ አንድ ፕሮጀክት ስኬት የሚሆነው ደንበኛው ደስተኛ ከሆነ ብቻ ነው ፡፡ የእያንዳንዱ የፕሮጀክት ሥራ አስኪያጅ ቁልፍ ከሆኑት ኃላፊነቶች አንዱ እርግጠኛ አለመሆንን ለመቀነስ ፣ ማንኛውንም አላስፈላጊ የሆኑ ድንገተኛ ነገሮችን በማስወገድ እና በተቻለ መጠን ደንበኞቻቸውን በፕሮጀክቱ ውስጥ ማሳት ነው ፡፡ ጥሩ የፕሮጀክት አስተዳዳሪዎች ውጤታማ የሆነ ግንኙነትን እንዴት ጠብቆ ማቆየት እና የኩባንያውን ደንበኞች ወቅታዊ ማድረጉን እንዴት ያውቃሉ።

6. የፕሮጄክት ስጋት ትንተና እና ቁጥጥር

ፕሮጀክቱ ትልቅ ከሆነ ፣ የመነሻ ዕቅዱ አካል ያልሆነ መሰናክሎች እና መሰናክሎች የመፍጠር እድሉ ሰፊ ነው። Hiccups መከሰት የማይቀር ነው ፣ ግን ጥሩ የፕሮጀክት አስተዳዳሪዎች ፕሮጀክቱ ከመጀመሩ በፊት እንዴት በጥንቃቄ እና በጥልቀት እንደሚረዳ ፣ እንዴት ሊከሰቱ የሚችሉ ስጋቶችን ለይቶ እንደሚገመግሙ ያውቃሉ ፡፡ ከዛ አደጋዎችን እንዴት ማስወገድ ወይም ቢያንስ የእነሱን ተፅእኖ ለመቀነስ እንደሚችሉ ያውቃሉ ፡፡

7. መሻሻል መከታተል

በመነሻ ደረጃዎች ውስጥ የፕሮጀክት ሥራ አስኪያጆች እና ቡድኖቻቸው የተፈለገውን ውጤት የማስገኘት ግልፅ ራዕይ እና ከፍተኛ ተስፋ አላቸው ፡፡ ሆኖም ፣ ወደ ማጠናቀቂያው መስመር የሚወስደው መንገድ በጭራሽ በጭራሽ በጭራሽ አይደለም ፡፡ ነገሮች በእቅዱ መሠረት የማይሄዱ ከሆነ የፕሮጀክት ሥራ አስኪያጅ ሁለቱንም ወጭዎች እና የቡድን አፈፃፀም መከታተል እና መተንተን እና ሁል ጊዜም የማስተካከያ እርምጃዎችን መውሰድ አለበት።

8. ሪፖርቶችን እና አስፈላጊ ሰነዶችን ማስተዳደር

በመጨረሻም ፣ ልምድ ያላቸው የፕሮጀክት አስተዳዳሪዎች የመጨረሻ ዘገባዎች እና ትክክለኛ ሰነዶች ምን ያህል አስፈላጊ እንደሆኑ ያውቃሉ። ጥሩ የፕሮጀክት አስተዳዳሪዎች ሁሉም የፕሮጄክት መስፈርቶች ተሟልተዋል እንዲሁም የፕሮጀክቶቹ ታሪክ ፣ ምን እንደተደረገ ፣ ማን እንደተሳተፈ እና ለወደፊቱ በተሻለ ምን ሊከናወን እንደሚችል ጨምሮ አጠቃላይ ሪፖርቶችን ማቅረብ ይችላሉ ፡፡ .