🏗Plinth beam
👉በመሬት ደረጃ እና በመሬቱ ወለል መካከል ያለው የግድግዳ ክፍል ነው፡፡
*plinth ብዙውን ጊዜ የድንጋይ ንጣፍ ስራ ነው።
*መሠረቱም በእንጨት ላይ ከሆነ ፣ከወለል ወለል በላይ ግድግዳውን ለመደገፍ አንድ ክፈፍ ጣውላ ይጣላል።
*በፕሌይ አናት ላይ እርጥብ ማረጋገጫ ኮርስ ይሰጣል፡፡
*እሱ ብዙውን ጊዜ ከ 75 ሚ.ሜ ውፍረት ያለው የኮንክሪት ኮርስ ነው ፡፡
#እትዮ_ኮንስትራክሽን
📩ለሃሳብ እና ኣስተያየት ይጠቀሙ
👇👇
@Ethiocon143bot
https://t.me/ethioengineers1
👉በመሬት ደረጃ እና በመሬቱ ወለል መካከል ያለው የግድግዳ ክፍል ነው፡፡
*plinth ብዙውን ጊዜ የድንጋይ ንጣፍ ስራ ነው።
*መሠረቱም በእንጨት ላይ ከሆነ ፣ከወለል ወለል በላይ ግድግዳውን ለመደገፍ አንድ ክፈፍ ጣውላ ይጣላል።
*በፕሌይ አናት ላይ እርጥብ ማረጋገጫ ኮርስ ይሰጣል፡፡
*እሱ ብዙውን ጊዜ ከ 75 ሚ.ሜ ውፍረት ያለው የኮንክሪት ኮርስ ነው ፡፡
#እትዮ_ኮንስትራክሽን
📩ለሃሳብ እና ኣስተያየት ይጠቀሙ
👇👇
@Ethiocon143bot
https://t.me/ethioengineers1
👉10 key terms of Project management and schedule
you should know.
1. WBS (Work Breakdown Structure):
👉Is hierarchical that breaks down the work into manageable clods so that each level of WBS could be easily understood by the project team.
2. Milestone:
👉These are the significant points in time or an event that mark important moments during the project.
These are mainly used for
● Starting phase
● Ending phase
● Fixed dates on plan
3. Baseline:
👉Is used to measure the performance of the project.
There are three baselines in project management.
These are –
● Schedule baseline
● Cost baseline
● Scope baseline
4. Gantt Chart:
Is a bar chart that displays the scheduled information graphically.
5. Critical Path Method (CPM)
👉Critical Path Method (CPM) is a step by step approach in which one can analyze critical and non- critical tasks.
6. Dummy Activity:
👉dummy activity is a simulated activity of sorts, one that is of a zero duration.
7. Float:
👉Float, also called slack, is the amount of time a task can slip before it bumps into another task.
8. Chart Dependencies:
👉the predecessor is the first task; it controls the start
or end date for all related successor tasks. The
successor, by contrast, is the task whose start or end date is controlled by the predecessor.
9. Types of relationship:
■ Finish to Start: Predecessor must finish before Successor can start.
■ Start to Start:Predecessor must start before Successor can start.
■ Finish to Finish: Predecessor must finish before Successor can finish.
■ Start to Finish: Predecessor must start before Successor can finish.
10. Lead time and Lag time:
👉Lead time causes the successor task to begin
before its predecessor task concludes. Lag time causes the successor task to begin some time after its predecessor task concludes.
https://t.me/ethioengineers1
you should know.
1. WBS (Work Breakdown Structure):
👉Is hierarchical that breaks down the work into manageable clods so that each level of WBS could be easily understood by the project team.
2. Milestone:
👉These are the significant points in time or an event that mark important moments during the project.
These are mainly used for
● Starting phase
● Ending phase
● Fixed dates on plan
3. Baseline:
👉Is used to measure the performance of the project.
There are three baselines in project management.
These are –
● Schedule baseline
● Cost baseline
● Scope baseline
4. Gantt Chart:
Is a bar chart that displays the scheduled information graphically.
5. Critical Path Method (CPM)
👉Critical Path Method (CPM) is a step by step approach in which one can analyze critical and non- critical tasks.
6. Dummy Activity:
👉dummy activity is a simulated activity of sorts, one that is of a zero duration.
7. Float:
👉Float, also called slack, is the amount of time a task can slip before it bumps into another task.
8. Chart Dependencies:
👉the predecessor is the first task; it controls the start
or end date for all related successor tasks. The
successor, by contrast, is the task whose start or end date is controlled by the predecessor.
9. Types of relationship:
■ Finish to Start: Predecessor must finish before Successor can start.
■ Start to Start:Predecessor must start before Successor can start.
■ Finish to Finish: Predecessor must finish before Successor can finish.
■ Start to Finish: Predecessor must start before Successor can finish.
10. Lead time and Lag time:
👉Lead time causes the successor task to begin
before its predecessor task concludes. Lag time causes the successor task to begin some time after its predecessor task concludes.
https://t.me/ethioengineers1
Telegram
SMH General Construction
በኮንስትራክሽን ዘርፍ ላይ ከዲዛይን ,ቅየሳ ጀምሮ እስከ ፊኒሺንግ ሁሉንም
👷♂እናማክራለን
🏢ዲዛይን እናደርጋለን
📚ሙያዊ ድጋፍ እና እገዛ እናደርጋለን
🏗በጥራት እና በጊዜ ፍጥነት እንገነባለን
📲 0953138434(Eng sintayehu melese)
tiktok
https://www.tiktok.com/@ethiocons
ለሃሳብ እና ኣስተያየት
@Ethiocon143bot ይጠቀሙ
👷♂እናማክራለን
🏢ዲዛይን እናደርጋለን
📚ሙያዊ ድጋፍ እና እገዛ እናደርጋለን
🏗በጥራት እና በጊዜ ፍጥነት እንገነባለን
📲 0953138434(Eng sintayehu melese)
tiktok
https://www.tiktok.com/@ethiocons
ለሃሳብ እና ኣስተያየት
@Ethiocon143bot ይጠቀሙ
👍1🤔1
🏗FIELD TESTS FOR AGGREGATE
1.
*The surface moisture in the aggregate, influences the water cement ratio, strength and durability of the mix.
To determine the surface moisture of moist or wet aggregate, method is as follows- FRYING PAN METHOD
*The following apparatus are required:
A frying pan or metal tray,
Gas stove or an electric hair dryer, A metal or glass stirring rod and Scales to measures. The following procedure is followed during the test
1. For coarse aggregate 2 kg sample is adequate and for fine aggregate 0.5 kg sample is adequate.
2. The wet/moist sample is then weighed wet weight (W)
3. Heated very gently on the frying pan or metal plate and stirred with a glass or metallic rod to maintain uniform distribution of heat, until the sheen disappears from the surface.
*The fine aggregates become surface dry when
it just starts showing free flowing characteristics.
4. The aggregates is then cooled and reweighed. The
surface dry aggregate weight (W ) is noted. The
surface moisture is then calculated as follows-
Surface moisture = [(W – W ) / W ] x 100%
5. Overheating must be avoided, as it will not give the correct surface moisture .
6. If heating is continued either on the fry pan or in the oven till the aggregate is bone dry aggregate weight is then noted (Wbd) after continuous heating. The absorption (absorbed water content) is then calculated as follows-
Absorption = [(W – W ) / W ] x 100%
Similarly, if the dry aggregates are received on site and absorption capacity is to be determined then the aggregates are first soaked in water and then the above methods are
deployed to determine the absorption capacity of
aggregates.
#እትዮ_ኮንስትራክሽን
1.
SURFACE MOISTURE CONTENT & ABSORPTION*The surface moisture in the aggregate, influences the water cement ratio, strength and durability of the mix.
To determine the surface moisture of moist or wet aggregate, method is as follows- FRYING PAN METHOD
*The following apparatus are required:
A frying pan or metal tray,
Gas stove or an electric hair dryer, A metal or glass stirring rod and Scales to measures. The following procedure is followed during the test
1. For coarse aggregate 2 kg sample is adequate and for fine aggregate 0.5 kg sample is adequate.
2. The wet/moist sample is then weighed wet weight (W)
3. Heated very gently on the frying pan or metal plate and stirred with a glass or metallic rod to maintain uniform distribution of heat, until the sheen disappears from the surface.
*The fine aggregates become surface dry when
it just starts showing free flowing characteristics.
4. The aggregates is then cooled and reweighed. The
surface dry aggregate weight (W ) is noted. The
surface moisture is then calculated as follows-
Surface moisture = [(W – W ) / W ] x 100%
5. Overheating must be avoided, as it will not give the correct surface moisture .
6. If heating is continued either on the fry pan or in the oven till the aggregate is bone dry aggregate weight is then noted (Wbd) after continuous heating. The absorption (absorbed water content) is then calculated as follows-
Absorption = [(W – W ) / W ] x 100%
Similarly, if the dry aggregates are received on site and absorption capacity is to be determined then the aggregates are first soaked in water and then the above methods are
deployed to determine the absorption capacity of
aggregates.
#እትዮ_ኮንስትራክሽን
👍1
🏗Bubble deck slab
👉Bubble deck slab is a method of virtually eliminating all concrete from the middle of a floor slab, which is not performing any structural function, thereby dramatically reducing structural dead weight
#እትዮ_ኮንስትራክሽን
https://t.me/ethioengineers1
👉Bubble deck slab is a method of virtually eliminating all concrete from the middle of a floor slab, which is not performing any structural function, thereby dramatically reducing structural dead weight
#እትዮ_ኮንስትራክሽን
https://t.me/ethioengineers1
Invention of precast pipe in Canada in , year 1920. It has capacity to take load of 21300kg , but as testing mechanism was not developed , they tested like this.To give confidence on strength of pipe . The inventor sat inside the pipe🤓
https://t.me/ethioengineers1
https://t.me/ethioengineers1
#ማን_አለብኝነት_ሲሰፋን
.
ይህ የህዝብ መንገድን የመዝጋት እንቅስቃሴ እየተደረገ የሚገፕው በንፋስ ስልክ ላፍቶ ክ/ከተማ በወረዳ 9 ኢንዱስትሪ መንደር (ካዲስኮ መብራት) አካባቢ ከቀለበት መንገድ ወደ ደብረዘይት የአስፋልት ኮንክሪት መንገድ መግቢያ ላይ ነው።
ይህ መንገድ ለረጅም አመታት እንደ ማስተንፈሻ መንገድ ሲያገልግል የቆየ ሲሆን በአሁን ወቅት ከላይ በፎቶው ላይ በምታዩት መልኩ አጥረውት ወደ ጊቢ በማካለልስ መንገዱን ዘግተውታል::
ማን ለማን አቤት ይበል?
Source :- housing in Addis Ababa fb page
#እትዮ_ኮንስትራክሽን
📩ለሃሳብ እና ኣስተያየት ይጠቀሙ
👇👇
@Ethiocon143bot
https://t.me/ethioengineers1
.
ይህ የህዝብ መንገድን የመዝጋት እንቅስቃሴ እየተደረገ የሚገፕው በንፋስ ስልክ ላፍቶ ክ/ከተማ በወረዳ 9 ኢንዱስትሪ መንደር (ካዲስኮ መብራት) አካባቢ ከቀለበት መንገድ ወደ ደብረዘይት የአስፋልት ኮንክሪት መንገድ መግቢያ ላይ ነው።
ይህ መንገድ ለረጅም አመታት እንደ ማስተንፈሻ መንገድ ሲያገልግል የቆየ ሲሆን በአሁን ወቅት ከላይ በፎቶው ላይ በምታዩት መልኩ አጥረውት ወደ ጊቢ በማካለልስ መንገዱን ዘግተውታል::
ማን ለማን አቤት ይበል?
Source :- housing in Addis Ababa fb page
#እትዮ_ኮንስትራክሽን
📩ለሃሳብ እና ኣስተያየት ይጠቀሙ
👇👇
@Ethiocon143bot
https://t.me/ethioengineers1
Office life before the invention of AutoCAD and other drafting softwares.
Prior to the release of AutoCAD in 1982, engineering drawings were all done by hand using different grade pencils, erasers, T-squares and set squares.
Even after all the manual labor, if a change was required, the engineers and toolmakers had to start from scratch and make the sketches all over again. Nowadays, architecture designers and other drafters are mainly just clicking their mouse and keyboard and not hunched over on a giant desk wondering if any changes will be made to their final drafts.
https://t.me/ethioengineers1
Prior to the release of AutoCAD in 1982, engineering drawings were all done by hand using different grade pencils, erasers, T-squares and set squares.
Even after all the manual labor, if a change was required, the engineers and toolmakers had to start from scratch and make the sketches all over again. Nowadays, architecture designers and other drafters are mainly just clicking their mouse and keyboard and not hunched over on a giant desk wondering if any changes will be made to their final drafts.
https://t.me/ethioengineers1
👍2
Forwarded from BeGet Engineering Plc [CENGG]
BeGet Engineering Plc.
ሰላም የቻናላችን ቤተሰቦች:
በ CENGG Software Solution የሚሰጡትን ስልጠናዎች በሙሉ የአድራሻ ለውጥ በማድረግ በ BeGet Engineering Plc. ስር በተደራጀ, በጥራትና በምቾት መገናኛ ቅርንጫፍ እየሰጠን እንገኛለን።
ቀድሞ ስልጠና ላይ ትኩረት ሰጥተንበት የነበረውን አሁን ወደ Consulting ሰላሳደግነው የበለጠ ተጠቃሚ ያረጋችሁዋል።
https://t.me/BeGetEngineering
ሰላም የቻናላችን ቤተሰቦች:
በ CENGG Software Solution የሚሰጡትን ስልጠናዎች በሙሉ የአድራሻ ለውጥ በማድረግ በ BeGet Engineering Plc. ስር በተደራጀ, በጥራትና በምቾት መገናኛ ቅርንጫፍ እየሰጠን እንገኛለን።
ቀድሞ ስልጠና ላይ ትኩረት ሰጥተንበት የነበረውን አሁን ወደ Consulting ሰላሳደግነው የበለጠ ተጠቃሚ ያረጋችሁዋል።
https://t.me/BeGetEngineering
When a load is applied to beam it undergoes compressive and tensile forces. There is a point in which the compressive zone changes to tension zone called as contraflexure point. Top point where the load acts undergoes compressive forces and bottom point undergoes tension forces.
Contraction occurs in the top fibres of beam and bottom fibres undergo elongation.
https://t.me/ethioengineers1
Contraction occurs in the top fibres of beam and bottom fibres undergo elongation.
https://t.me/ethioengineers1
👍1