በኮንስትራክሽን ዘርፍ ላይ ከዲዛይን ,ቅየሳ ጀምሮ እስከ ፊኒሺንግ ሁሉንም

👷‍♂እናማክራለን
🏢ዲዛይን እናደርጋለን
📚ሙያዊ ድጋፍ እና እገዛ እናደርጋለን
🏗በጥራት እና በጊዜ ፍጥነት እንገነባለን
📲 0953138434(Eng sintayehu melese)

tiktok
https://www.tiktok.com/@ethiocons

ለሃሳብ እና ኣስተያየት
@Ethiocon143bot ይጠቀሙ
Download Telegram
https://www.ethiotelecom.et/ev-civil-works/....
Urgent notice deadline is oct17
Apply for ethio tele job on construction . Other fileds also included. It is applied via oline click the above link and fill the form and apply. The connetion to sibmitt the form may be didnt work but try agian and again untill it say "congagulation you have succefuly applied.
Thank you share
LAWS OF CONTRACT

according to civil code art.1675
Contract is an agreement b/n 2 parties and it needs to be
👉concent
👉legal and lawful
👉possible
👉valid before court
👉must has offeree and offerer
.
.
.etc
Purpose of contract
👉to avoid risk of non performance
👉to describe scope of work
👉to establish time frame
👉to establish cost and payment provision
👉to set for the obligation and relationships
👉to manage multiple risk
👉to minimize dispute and claim
Types of construction contract
1Lump sum:- the contractor offered to do the whole work for the total stipulated money
2 Unit rate:- amount to be received by the contractor depends up on the quantities of various items of work actually executed
3 Lump sum and Schedule:- contractor offered to do a particular work at a fixed sum within a specified time as per plan and specifications
4 Cost plus:- used in difficult situation either for the owner or contractor to predict the cost during negotiations
4.1Cost plus fixxed fee
4.2 Cost plus percentage of cost
.
.
. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
Defense Construction Enterprise hereby invites all interested suppliers to submit their bid for the procurement of supply, installation, configuration and maintenance of Real time web-based GPS fleet management system as per the terms of reference and as

10/10/2019
Bid Invitation for

Tender No.DCE/EM/255/2019

Defense Construction Enterprise hereby invites all interested suppliers to submit their bid for the procurement of supply, installation, configuration and maintenance of Real time web-based GPS fleet management system as per the terms of reference and as per the attached tender document.

Therefore:-

1. All bidders must attach renewed commercial License bidders must attach V.A.T certificate Tax clearance and other relevant legal documents with their bid document.

2. All bidders shall submit a bid bond guarantee amounting to birr 50,000/fifty thousand /or equivalent in the form of Unconditional Bank Guarantee or CPO.

3. A complete set of bidding documents and machines specification can be obtained from procurement team office found /Ethio-China Friendship Avenue/against Non-Refundable Birr 200.00 (Two Hundreds) in cash.

4. All bids must be submitted in sealed envelope on/or before Oct. 29, 2019.

5. Bid will be closed on Oct. 29 ,2019 at 10:00 A.M (Morning) and bid will be opened on the same date Oct. 29,2019 at 10:15 A.M (Morning) in the presence of the bidders or their representatives, who choose to attend the opening ceremony that will be held at DCE procurement office.

6. DCE reserves the right to accept or reject all or part of the bids or waives formalities without assigning any reasons thereof.

Address:- Defense Construction Enterprise

Po.Box 3414

Tel:- 011440-34-33/34/0114-42-22-70/71/72

Fax 0114-40-04-71/0114-40-29-96

Ethio-China Road Friendship Avenue

Addis Ababa, Ethiopiawww.dce.gov.com/www.dce.et.com

Email:- INFO@dce-et.com
👍2
Anatomy of tower crane
በቅርቡ ቀን ስለ scaffolding program ይኖረናል
👉ኣሁን ደሞ Unit Weight Of Building Materials እንይ
.
*Water- 1000 Kg/ m3
*Bricks (broken) - 1420 Kg/ m3
*Bricks(common) -1600 Kg/ m3
*Cement(ordinary)- 1440 Kg/ m3
*Cement (rapid hardening)- 1250 Kg/ m3
*Cement Mortar - 2000 Kg/ m3
*Cement Concrete (Plain) - 2400 Kg/ m3
*Cement Concrete (Reinforced) -2500 Kg/ m3
*Glass - 2500 Kg/ m3
*Lime Concrete - 1900 Kg/ m3
*Cement Plaster - 2000 Kg/ m3
*Lime Plaster - 1700 Kg/ m3
*Stones (Ballast) - 1720 Kg/ m3
*Stones (Aggregates)- 1750 Kg/ m3
*Stones (Basalt)- 2850 Kg/ m3
*Stones (Granite) - 2450 Kg/ m3
*Stones (Marble)- 2650 Kg/ m3
*Timber (Oak, Sal) - 510 Kg/ m3
*Timber (Mango) - 650 Kg/ m3
*Timber (Teak)- 625 Kg/ m3
*Coal- 600 Kg/ m3 *Plastics- 1250 Kg/ m3
*Oils- 800 Kg/ m3
*Ashes- 650 Kg/ m3
*Clinker- 750 Kg/ m3
*Rubber- 1300 Kg/ m3
*Slag- 1500 Kg/ m3
*Clay Soil- 1900 Kg/ m3
*Sand (dry) - 1540 to 1600 Kg/ m3
*Sand (wet)- 1760 to 2000 Kg/ m3
*Steel- 7850 Kg/ m3
*Chalk- 2100 Kg/ m3
*Bitumen- 1040 Kg/ m3
👍1
👉ኣሰመራ ፃዕዳ❤
👉ብዝዎቻቹ በጠየቃቹን መሰረት ስለ ስካፎልድ ሌክቸር ኖት ኣዘጋጅተናል @civil
.
▶A SCAFFOLD is a temporary structure erected to support access or working platforms.
*Scaffolds are commonly used in construction work so workers have a safe, stable work platform when work cannot be done at ground level or on a finished floor.
*SCAFFOLDING means the individual components, for example tubes, couplers or frames and materials
that when assembled form a scaffold. *Scaffolding is classified as plant under Work Health and Safety
.
*about 35 to 40 percent of all the accidents that take place in building construction sites is due to faulty scaffolding and consequent fall of persons from heights, strict supervision should be taken in putting up of scaffolding according to standard
practices.
▶Scaffolding Parts.
Scaffolding contains the following parts.
1. Standards: The vertical posts (also called uprights).
2. Ledgers: The horizontal members parallel to the wall.
3. Braces: The bracing system.
4. Putlogs: Horizontal members normal to the wall.
5. Transoms: Putlogs whose both ends are supported on ledgers in double scaffolding.
6. Bridle: Member used to bridge openings.
7. Boarding: Planks on which workmen stand.
8. Guard rail: Rail provided at about 1 m level to guard the men working on the boarding.
9. Toe board: Boards placed parallel to boarding near the wall to give protection to workers.
10. Base plate or sole plate: Plates on the ground supporting standards.
.
▶Scaffolding Types.
Some of the commonly types of scaffolding are described below:
1. Single scaffolding or bricklayers scaffolding. This type of scaffolding is mostly used for brickwork and consists of an outer row of verticals;(called standards) to which longitudinal members are tied at different levels of working
2. Double scaffolding or Mason’s scaffolding. This is a supporting system used by masons for plastering .
It has pairs of (inner and outer) verticals. The putlogs, instead of being supported on the wall, are supported on an inner system of verticals and longitudinal’s.
To give additional lateral stability to the narrow and tall framework, it is tied to the building at intervals when used for multistory building.
3. Cantilever or needle scaffolding.
For the construction of the upper part of a tall residential building , cantilever scaffolding eliminates unwanted scaffolding at lower levels keeping the
space free for vehicles, etc.
It is similar to the double scaffold, except that it is
supported at the bottom by a cantilever prop.
4. Birdscage scaffolding.
It is used for internal work and consists of a simple cage supported on four verticals from which the;workers can work.
It is movable and can be easily moved from place to place.
5. Ladder or trestle scaffolding.
This is used for light work and is usually portable.
It consists of two ladders with the top ends joined together by planks so that a person can work on this platform.
6. Suspended scaffolding.
In tall buildings for working at high levels, such as the painting of tall buildings, it is more convenient
and economical to suspend the working platform from above the ground than to support it from the ground.
*This is especially so when the height is more than 30 meters.
.
▶Important Points in Scaffolding.
The following are some of the important rules to be remembered in scaffolding work:
1. The uprights (standards) should not be spaced more than 1.8 m (6 ft) for heavy work such as masonry and not more than 3 m (10 ft) for light
work such as painting.
2. The putlogs in single scaffolding should bear well on the wall opening. Short members nailed onto the wall should not be used as putlogs.
3. The platforms should be wide enough. It should not be less than 17 inches (425 mm) in width if the
height is more than 1.8 meters.
If materials are stored on it, it should not be less than 850 mm (34 inches) in width.
*Each board should be 50 mm thick and
200 mm (8 inches) wide for the putlog spacing of 1.5 m or more.
It can be 38 mm (11/2 inches)
thick for 0.9 to 1.5 m and 25 mm (1 inch) for less than 1.5 in putlog spacing’s.👇👇👇👇👇 ለሁሉ
❤1👍1
4. The plank should not be defective. To prevent sudden failure of the planks, the grains in the wood used should not be more than 10 degrees with the
length of the plank.
There should be no overhanging (or cantilevering) of
these planks.
5. All scaffolding should be properly strutted so that they do not fall away from the wall laterally. Similarly, it should be stable longitudinally also.
6. Workmen should not work under the scaffolding.
7. Safe ladders should be provided to climb on to
the scaffolding.
8. If the height is more than 2 meters, guard rails should be provided for the scaffolding. ም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
👇 Today Book Tip @civil_Cotm_eng
.
▶Lecture Notes On Formwork
.
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇
Properties of R.C.C./✔Requirement of Good R.C.C.
1. It should be capable of resisting expected tensile, compressive, bending and shear forces.
2. It should not show excessive deflection and spoil serviceability requirement.
3. There should be proper cover to the reinforcement, so that the corrossion is prevented.
4. The hair cracks developed should be within the permissible limit.
5. It is a good fire resistant material.
6. When it is fresh, it can be moulded to any desired shape and size.
7. Durability is very good.
8. R.C.C. structure can be designed to take any load.
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
📖✔IMPORTANT POINTS FROM THERNAL STRESSES (STRENGTH_OF_MATERIALS)

✔ Stresses produced due to change in temperatures(Rise/Fall) are called as thermal stresses

✔ Actual meaning of coefficient of thermal expansion is strain produced per unit change in temperature

✔Unit of Coefficient of thermal expansion = per degree celcius

✔ Coefficient of thermal expansion for different materials
✴ Aluminium = 24 x 10^(-6)
✴ Copper = 17.5 x 10^(-6)
✴ Steel = 12 x 10^(-6)

✔Higher the value of coefficient of thermal expansion, more will be the material sensitive for temperature change

✔For the bar free to expand, with change in temperature (rise/fall), no stress is developed

✔Prismatic bar with rigidly supported at both ends
✔ As temperature increases, compressive stresses are developes on bar
✔ As temperature decreases, tensile stresses are developes on bar

✔ Copper bar is in series with steel bar
✔ As temperature increases, compressive stresses are developed on both copper and steel bar
✔ As temperature decreases, tensile stresses are developed on both copper and steel bar

✔ Copper plate is in parallel with steel plate and form a composite
✔ As temperature increases, compressive stress developed on copper and tensile stress developed on steel
✔ As temperature decreases, tensile stress developed on copper and compressive stress developed on steel

✔ Copper rod is enclosed in steel tube and both are rigidly fixed at ends
✔As temperature increases, Compressive stresses are developes on both copper and steel
✔ As temperature decreases, tensile stresses are developes on both copper and steel. ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
👇👇👇👇👇
Join for more updates via the link below;
@civil_Cotm_eng

👆👆👆👆👆
Media is too big
VIEW IN TELEGRAM
👉Why Concrete Needs Reinforcement?
.
🚩SHARE SHARE SHARE
👉ኣሁን ደሞ ስለ STAIRS ትንሽ እንይ
.
■ stair is one of the different means of vertical
circulation or serving fire exit in a building.
.
□ These are key terms used in connection with
stairs:
.
■ Flight: is a series of steps between landings.
■ Step: is the unit in a flite of stairs.
■ Tread: is the horizontal upper portion of a step.
■ Riser: is the vertical or front portion of step.
■ Landing: is the horizontal platform at the top of
flight of steps.
■ Rise: is the vertical distance between two
successive treads.
■ Going: is the horizontal distance between two
risers.
■ Winder: Is a step used for changing the direction
of flight of steps.
■ Pitch: is the angle inclination between a line
joining the nosing of each step in a flight and the
floor.
■ Headroom: is the vertical distance between the
nosing of one flight of steps and soffit of the flight
of steps immediately above.
■ Nosing. It is the front edge of the tread which
projects beyond the riser.
.