FIELD TESTS FOR AGGREGATE @civil_Cotm_eng
1. SURFACE MOISTURE CONTENT &
ABSORPTION
The surface moisture in the aggregate, influences the water
cement ratio, strength and durability of the mix. To
determine the surface moisture of moist or wet aggregate,
method is as follows-
FRYING PAN METHOD
The following apparatus are required:
A frying pan or metal tray,
Gas stove or an electric hair dryer,
A metal or glass stirring rod and
Scales to measures.
The following procedure is followed during the test
1. For coarse aggregate 2 kg sample is adequate and for
fine aggregate 0.5 kg sample is adequate.
2. The wet/moist sample is then weighed wet weight (W2)
3. Heated very gently on the frying pan or metal plate and
stirred with a glass or metallic rod to maintain uniform
distribution of heat, until the sheen disappears from the
surface. The fine aggregates become surface dry when
it just starts showing free flowing characteristics.
4. The aggregates is then cooled and reweighed. The
surface dry aggregate weight (W ) is noted. The
surface moisture is then calculated as follows-
Surface moisture = [(W2 – W ) / W2 ] x 100%
5. Overheating must be avoided, as it will not give the
correct surface moisture .
6. If heating is continued either on the fry pan or in the
oven till the aggregate is bone dry aggregate weight is
then noted (Wbd) after continuous heating. The
absorption (absorbed water content) is then calculated
as follows-
Absorption = [(W – W ) / W ] x 100%
Similarly, if the dry aggregates are received on site and
absorption capacity is to be determined then the aggregates
are first soaked in water and then the above methods are
deployed to determine the absorption capacity of
aggregates. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
1. SURFACE MOISTURE CONTENT &
ABSORPTION
The surface moisture in the aggregate, influences the water
cement ratio, strength and durability of the mix. To
determine the surface moisture of moist or wet aggregate,
method is as follows-
FRYING PAN METHOD
The following apparatus are required:
A frying pan or metal tray,
Gas stove or an electric hair dryer,
A metal or glass stirring rod and
Scales to measures.
The following procedure is followed during the test
1. For coarse aggregate 2 kg sample is adequate and for
fine aggregate 0.5 kg sample is adequate.
2. The wet/moist sample is then weighed wet weight (W2)
3. Heated very gently on the frying pan or metal plate and
stirred with a glass or metallic rod to maintain uniform
distribution of heat, until the sheen disappears from the
surface. The fine aggregates become surface dry when
it just starts showing free flowing characteristics.
4. The aggregates is then cooled and reweighed. The
surface dry aggregate weight (W ) is noted. The
surface moisture is then calculated as follows-
Surface moisture = [(W2 – W ) / W2 ] x 100%
5. Overheating must be avoided, as it will not give the
correct surface moisture .
6. If heating is continued either on the fry pan or in the
oven till the aggregate is bone dry aggregate weight is
then noted (Wbd) after continuous heating. The
absorption (absorbed water content) is then calculated
as follows-
Absorption = [(W – W ) / W ] x 100%
Similarly, if the dry aggregates are received on site and
absorption capacity is to be determined then the aggregates
are first soaked in water and then the above methods are
deployed to determine the absorption capacity of
aggregates. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
☞ site Engineer Must Know @civil_Cotm_eng
a) Minimum thickness of slab is 125 mm.
b) Water absorption should not be more than
15%.
c) Dimension tolerance for cubes + – 2 mm.
d) Compressive strength of Bricks is 3.5 N /
mm2
e) Maximum Free fall of concrete allowed is
1.50 m.
f) In soil filling as per IS code for every 100
sqm 3 sample for core cutting test should be
taken.
g) Electrical conduits shall not run in column
h) Earth work excavation for basement above
3 m should be stepped form
i) Any back filling shall be compacted 95% of
dry density at the optimum moisture content
and in layers not more than200mm for filling
above structure and 300 mm for no structure
j) F soling is specified the soling stones shall
be laid at 45° to 60° inclination (and not
vertical) with interstices filled with sand or
moorum.
k) A set of cube tests shall be carried out for
each 30 cum of concrete / each levels of
casting / each batch of cement.
l) Water cement ratio for different grades of
concrete shall not exceed 0.45 for M20 and
above and 0.50 For M10 / M15 contractor
m) For concrete grades M20 and above
approved admixture shall be used as per mix
design requirements.
n) Cement shall be stored in dry places on a
raised platform about 200mm above floor
level and 300mm away from walls. Bags to be
stacked not more than 10 bags high in such a
manner that it is adequately protected from
moisture and contamination.
o) Samples from fresh concrete shall be taken
and at least a set of 6 cubes of 150mm shall
be prepared and cured. 3 Cubes each at 7
days and 28 days shall be tested for
compressive strength. The test results should
be submitted to engineer for approval. If
results are unsatisfactory necessary action/
rectification/remedial measures has to be
exercised.
p) Water used for both mixing and curing
shall be clean and free from injurious
amounts of oils, acids, alkalies, salts, sugar
and organic materials or other substances
that may be deleterious to concrete or steel.
The ph shall be generally between 6 and 8.
Cement shall be tested for its setting.
a) The initial setting time shall not be less
than 30 minutes.
b) The final setting time shall not be more
than 10
Slump IS 456
1) Lightly reinforced 25 – 75 mm
2) Heavily reinforced 75 – 100 mm
3) Trench fill (insitu & Tremie) 100 – 150 mm
(For Tremie no need of vibrator)
Curing Days Required
a) Super Sulphate cement: 7 days
b) Ordinary Portland cement OPC : 10 days
c) Minerals and Admixture added cement : 14
days
Cube Samples
a) 1 – 5 M3 : 1 No.
b) 6 – 15 M3 : 2 No’s
c) 16 – 30 M3 : 3 No’s
d) 31 – 50 M3 : 4 No’s
e) Above 50 M3 : 4 + 1 No of addition sample
for each 50 M3. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng❤️❤️❤️
a) Minimum thickness of slab is 125 mm.
b) Water absorption should not be more than
15%.
c) Dimension tolerance for cubes + – 2 mm.
d) Compressive strength of Bricks is 3.5 N /
mm2
e) Maximum Free fall of concrete allowed is
1.50 m.
f) In soil filling as per IS code for every 100
sqm 3 sample for core cutting test should be
taken.
g) Electrical conduits shall not run in column
h) Earth work excavation for basement above
3 m should be stepped form
i) Any back filling shall be compacted 95% of
dry density at the optimum moisture content
and in layers not more than200mm for filling
above structure and 300 mm for no structure
j) F soling is specified the soling stones shall
be laid at 45° to 60° inclination (and not
vertical) with interstices filled with sand or
moorum.
k) A set of cube tests shall be carried out for
each 30 cum of concrete / each levels of
casting / each batch of cement.
l) Water cement ratio for different grades of
concrete shall not exceed 0.45 for M20 and
above and 0.50 For M10 / M15 contractor
m) For concrete grades M20 and above
approved admixture shall be used as per mix
design requirements.
n) Cement shall be stored in dry places on a
raised platform about 200mm above floor
level and 300mm away from walls. Bags to be
stacked not more than 10 bags high in such a
manner that it is adequately protected from
moisture and contamination.
o) Samples from fresh concrete shall be taken
and at least a set of 6 cubes of 150mm shall
be prepared and cured. 3 Cubes each at 7
days and 28 days shall be tested for
compressive strength. The test results should
be submitted to engineer for approval. If
results are unsatisfactory necessary action/
rectification/remedial measures has to be
exercised.
p) Water used for both mixing and curing
shall be clean and free from injurious
amounts of oils, acids, alkalies, salts, sugar
and organic materials or other substances
that may be deleterious to concrete or steel.
The ph shall be generally between 6 and 8.
Cement shall be tested for its setting.
a) The initial setting time shall not be less
than 30 minutes.
b) The final setting time shall not be more
than 10
Slump IS 456
1) Lightly reinforced 25 – 75 mm
2) Heavily reinforced 75 – 100 mm
3) Trench fill (insitu & Tremie) 100 – 150 mm
(For Tremie no need of vibrator)
Curing Days Required
a) Super Sulphate cement: 7 days
b) Ordinary Portland cement OPC : 10 days
c) Minerals and Admixture added cement : 14
days
Cube Samples
a) 1 – 5 M3 : 1 No.
b) 6 – 15 M3 : 2 No’s
c) 16 – 30 M3 : 3 No’s
d) 31 – 50 M3 : 4 No’s
e) Above 50 M3 : 4 + 1 No of addition sample
for each 50 M3. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng❤️❤️❤️
Advantages of using mineral admixture in cement @civil_Cotm_eng
Fly ash
-Improves strength and durability of concrete
-Increased resistance towards chemical attacks
-Better workabilit
Blast furnace slag
-Improved durability
Increased setting time
-Strength gain continues for a long period of time
-Reduced risk of damages by alkali – silica reaction
-Resistant to chloride and sulphate attacks
Silica fumes
-Better compressive strength and resistance to abrasion
-Reduced permeability of chloride ions
-Improved workability
-Reduces bleeding
Rise husky ash
-Heat of hydration of concrete is reduced
-Permeability of concrete is reduced
-Improved resistance to chloride and sulphate attacks
Metakaolin
-Increased compressive & flexural strengths
-Reduced permeability
-More resistant to chemical attacks
-Durability is increased .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
Fly ash
-Improves strength and durability of concrete
-Increased resistance towards chemical attacks
-Better workabilit
Blast furnace slag
-Improved durability
Increased setting time
-Strength gain continues for a long period of time
-Reduced risk of damages by alkali – silica reaction
-Resistant to chloride and sulphate attacks
Silica fumes
-Better compressive strength and resistance to abrasion
-Reduced permeability of chloride ions
-Improved workability
-Reduces bleeding
Rise husky ash
-Heat of hydration of concrete is reduced
-Permeability of concrete is reduced
-Improved resistance to chloride and sulphate attacks
Metakaolin
-Increased compressive & flexural strengths
-Reduced permeability
-More resistant to chemical attacks
-Durability is increased .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
👉What is Liquidated damage? @civil_Cotm_eng
.
➡ስራ ተቌራጩ ለወሰደው ውል በግዜ ላለመጨረሱ ለባለቤት
ወይም ለውል ሰጪው አካል የሚከፍለው የካሳ ክፍያ ሲሆን∷
የጠቅላላ ኮንስትራክሽን ውል ይህ ሳይሆን ሲቀር ከዚህ በታች
በተጠቀሰው ቅጣት መሰረት ስራ ተቌራጩ መቅጣት እነደሚቻል
ይጠቅሳል።
1. ቅጣቱ 0.1 ፐርሰንት ወይም የጠቅላላ ፕሮጀክቱን አንድ አንድ
ሺኛ (1/1000) ላልፈፀመው ስራ ቀናት በየቀኑ ሊቀጣ ይገባል።
2. ነገር ግን ስራ ተቌራጩ በጠቅላላው ሊቀጣ የሚችለው
የፕሮጀክቱን አስር 10% (አስር ፐርሰንት). ሊበልጥ አይገባም።
⏩"Liquidated damages" means the compensation
stated in the contract as being payable by Contractor to the Public Body for failure to perform
the contract or part thereof within the periods under
the contract, or as payable by Contractor to the Public Body for any specific breach identified in the contract;
(a) A penalty of 0.1% or 1/1000 of the value of
undelivered Service for each day of delay until
actual delivery or performance,
(b) The cumulative penalty to be paid by the Contractor shall not exceed 10% of the contract price. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
.
➡ስራ ተቌራጩ ለወሰደው ውል በግዜ ላለመጨረሱ ለባለቤት
ወይም ለውል ሰጪው አካል የሚከፍለው የካሳ ክፍያ ሲሆን∷
የጠቅላላ ኮንስትራክሽን ውል ይህ ሳይሆን ሲቀር ከዚህ በታች
በተጠቀሰው ቅጣት መሰረት ስራ ተቌራጩ መቅጣት እነደሚቻል
ይጠቅሳል።
1. ቅጣቱ 0.1 ፐርሰንት ወይም የጠቅላላ ፕሮጀክቱን አንድ አንድ
ሺኛ (1/1000) ላልፈፀመው ስራ ቀናት በየቀኑ ሊቀጣ ይገባል።
2. ነገር ግን ስራ ተቌራጩ በጠቅላላው ሊቀጣ የሚችለው
የፕሮጀክቱን አስር 10% (አስር ፐርሰንት). ሊበልጥ አይገባም።
⏩"Liquidated damages" means the compensation
stated in the contract as being payable by Contractor to the Public Body for failure to perform
the contract or part thereof within the periods under
the contract, or as payable by Contractor to the Public Body for any specific breach identified in the contract;
(a) A penalty of 0.1% or 1/1000 of the value of
undelivered Service for each day of delay until
actual delivery or performance,
(b) The cumulative penalty to be paid by the Contractor shall not exceed 10% of the contract price. .
⚡አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።👇👇👇 @civil_Cotm_eng
Forwarded from SMH General Construction
👉What is standard box size?
.
▶width*length*depth
.
1. 40*50*20cm (mostly for cement mortar)
2. 40*50*18cm (for C-25 concrete)
3. 40*50*16cm (for C-30 concrete)
4. 40*50*14cm (for C-40 concrete but depend on mix design )
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
.
▶width*length*depth
.
1. 40*50*20cm (mostly for cement mortar)
2. 40*50*18cm (for C-25 concrete)
3. 40*50*16cm (for C-30 concrete)
4. 40*50*14cm (for C-40 concrete but depend on mix design )
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
አስደሳች ዜና ለተማሪዎች
@civil_Cotm_eng
ውድ የ Ethio construction እንዲሁም የቻናላችን አባላት እስከዛሬ ለእናንተ ለተማሪዎች ይጠቅማሉ ያልንናቸውን ትህምሪታው ትኩስ መረጃዎችን ወደ እናንተ ስናደርስ ቆይተናል ካሁን በኋላ ደግሞ ለየት ባለ መልኩ ዘወትር ቅዳሜ ከምሽቱ 3፡00 ጀምሮ የተለያዩ ጥያቄዎችን በመጠየቅ ለሚመልሱ ተማሪዎች ልዩ ልዩ ሽልማቶችን የምንሸልም ይሆናል ።
ከእናንተ የሚጠበቀው
👉ጥያቄዎቹ 2፡00 ስለሚለቀቁ ዝግጁ ሆኖ መጠበቅ
👉ወደ ቻናሉ ያልተቀላቀሉ ተማሪዎችን Join እንዲያደርጉ መጋበዝ 👇👇👇👇👇
Join for more engineering updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
@civil_Cotm_eng
ውድ የ Ethio construction እንዲሁም የቻናላችን አባላት እስከዛሬ ለእናንተ ለተማሪዎች ይጠቅማሉ ያልንናቸውን ትህምሪታው ትኩስ መረጃዎችን ወደ እናንተ ስናደርስ ቆይተናል ካሁን በኋላ ደግሞ ለየት ባለ መልኩ ዘወትር ቅዳሜ ከምሽቱ 3፡00 ጀምሮ የተለያዩ ጥያቄዎችን በመጠየቅ ለሚመልሱ ተማሪዎች ልዩ ልዩ ሽልማቶችን የምንሸልም ይሆናል ።
ከእናንተ የሚጠበቀው
👉ጥያቄዎቹ 2፡00 ስለሚለቀቁ ዝግጁ ሆኖ መጠበቅ
👉ወደ ቻናሉ ያልተቀላቀሉ ተማሪዎችን Join እንዲያደርጉ መጋበዝ 👇👇👇👇👇
Join for more engineering updates via the link below;
@civil_Cotm_eng
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ። @civil_Cotm_eng
👍1