👉DIFFERENCE BETWEEN PERT AND CPM # repost

➡PERT and CPM are most commonly used methods for project management.

➡️In this article, we will discuss the differences between PERT and CPM.

🚧WHAT IS
PERT?

➡️
PERT or Programme Evaluation and Review
Technique is an event oriented method of network planning. In it, the emphasis is focused on start and completion events rather than on activities.

➡️The activities taking place between events are not specified.

➡️In
PERT network, the events fall in logical
sequence But the logic of events may be different
for different planners. Hence
PERT network may
vary from planner to planner depending upon their decision as which event to precede or occur
concurrently.

➡️In
PERT network the start circle is omitted and only the completed event is recorded.

➡️
PERT helps in identifying critical area which threatens the completion of the work.

➡️It provides the means to
determine how resources can be transferred from
one job to another job.

🚧WHAT IS CPM?

➡️CPM is also network comprising events and
activities.

➡️This network is activity based.

➡️The activities are represented by arrowed lines and events by circles.

➡️The activities are connected in logical sequence.

➡️The time allotted to each activity is related to cost.

🚧DIFFERENCE BETWEEN
PERT AND CPM

🏷1.
PERT is event oriented whereas CPM is activity oriented.
▶️In simple words, in
PERT network interest is focused upon start or completion of events and
not on activities themselves.

🏷2. In CPM network no allowance is made for
uncertainties in the duration of time involved
whereas in
PERT network uncertainty is considered.

🏷3. In
PERT, time is not related to cost whereas in
CPM the object is to develop an optimum time
cost relationship. However,
PERT has since been
extended in this direction and the line dividing
PERT/CPM is gradually fading out.

🏷4. In CPM duration of activity is estimated with a
fair degree of accuracy. In
PERT duration of
activities are not so accuraten and definite.

🏷5. In CPM both time and cost can be controlled
during planning.
Pert is basically a tool for
planning

🏷6.
PERT is used in research and development
project, basically for non-repetitive type projects.
CPM is widely used in construction projects.

#PERT

#CPM

#ConstructionPlanning