Surat-based Navitas Solar has entered Zambia with its first utility-scale EPC project — a ₹200 crore, 54 MW captive solar plant in Serenje Province for a mining company via its arm Navitas Planet. The move marks the company’s shift from supplying modules to executing projects in Africa, a market long dominated by Chinese firms, with Indian players like Sterling & Wilson and Jakson Green also expanding there. #Exports #Solar
🔥31👍4❤1
Tata Power will begin building a ₹6,600 crore, 10-GW solar wafer and ingot plant in Odisha this October, with the first 5-GW phase set to start in January 2028 and the second six months later; the company chose Odisha for lower costs and incentives, while also exploring nuclear energy projects in Madhya Pradesh, Odisha, and Gujarat, alongside its existing 4.3-GW solar facility. #Solar
👍36❤4❤🔥1
India’s renewable energy ministry is planning to roll out a PLI scheme worth ₹24,000 crore to boost domestic production of polysilicon and high-efficiency solar PV modules, aiming to reduce import dependence and strengthen the country’s renewable energy supply chain in line with its ambitious clean energy targets. #MakeinIndia #Solar
Source
Source
👍44❤8⚡2
Vikram Solar has inaugurated a 6 GW solar module manufacturing facility at Gangaikondan, Tirunelveli, Tamil Nadu.
The plant will produce high-efficiency n-type TOPCon modules and also plans to add cell, wafer, and ingot capacity to become a fully integrated campus.
With this, Vikram Solar’s total module capacity goes to 15.5 GW, supporting the Make in India push for renewable manufacturing. #Solar #MakeinIndia
Source
The plant will produce high-efficiency n-type TOPCon modules and also plans to add cell, wafer, and ingot capacity to become a fully integrated campus.
With this, Vikram Solar’s total module capacity goes to 15.5 GW, supporting the Make in India push for renewable manufacturing. #Solar #MakeinIndia
Source
❤46🤔3🤣1
Agastya Energy announces ₹7,800 Cr expansion into ingot-wafer manufacturing
👉🏻 Agastya Energy will invest ₹7,800 Cr for backward integration into ingot and wafer manufacturing at its Kurnool, AP plant.
👉🏻 Adds to its existing 5 GW cell + 5 GW module capacity and aligns with MNRE’s ALMM push for domestic upstream solar.
👉🏻 Aims to cut import dependence on China and anchor demand with 2 GW/year of own solar projects. #Solar #MakeinIndia
Source
👉🏻 Agastya Energy will invest ₹7,800 Cr for backward integration into ingot and wafer manufacturing at its Kurnool, AP plant.
👉🏻 Adds to its existing 5 GW cell + 5 GW module capacity and aligns with MNRE’s ALMM push for domestic upstream solar.
👉🏻 Aims to cut import dependence on China and anchor demand with 2 GW/year of own solar projects. #Solar #MakeinIndia
Source
BusinessLine
Agastya Energy announces ₹7,800 cr expansion into integrated ingot, wafer manufacturing
Agastya Energy announces a ₹7,800 crore expansion for integrated ingot and wafer manufacturing, boosting India's solar capabilities and jobs.
👍32❤2🤣1
Govt Plans New PLI For Polysilicon To Cut China Dependence ☀️
🔹 Scheme to cover 10-30 GW capacity — needs ₹25,000 cr investment by 2030
🔹 India 100% dependent on China for polysilicon — key for solar PV
🔹 India has 200+ GW module, 32 GW cell capacity — 80 GW wafer/ingot target by 2028
🔹 Aims integrated chain: polysilicon → ingot → wafer → cell → module
#Policy #Solar
🔗 Mint
🔹 Scheme to cover 10-30 GW capacity — needs ₹25,000 cr investment by 2030
🔹 India 100% dependent on China for polysilicon — key for solar PV
🔹 India has 200+ GW module, 32 GW cell capacity — 80 GW wafer/ingot target by 2028
🔹 Aims integrated chain: polysilicon → ingot → wafer → cell → module
#Policy #Solar
🔗 Mint
👍43🤣2🔥1
Media is too big
VIEW IN TELEGRAM
🛫🇮🇳 India's Cochin Airport expands green footprint with 50 MWp solar plant.
#energy #solar
Key Highlights -
🔘 World’s first fully solar-powered airport
🔘 250M+ units green power generated
🔘 1.6M tonnes CO₂ avoided
🔘 Solar farms, rooftops, carports + floating solar
🔘 Adding hydropower, EVs & green-hydrogen
#energy #solar
🤝33❤6👍4👏1
Indian Development News 🇮🇳
Under the phase-1, Indosol Solar is investing Rs 15,000 crore to set up 5 gigawatts (GW) of modules, 5 GW wafers, 5 GW ingot, and 5 GW of glass capacities at the upcoming plant at Nellore, near Ramayapatnam port in Andhra Pradesh. #MakeinIndia #Energy ht…
Indosol Solar To Commission India's First Ingot-Wafer Plant In AP Next Month
🔹 ₹3,000 cr facility - country's only operational ingot plant; ingots sliced to wafers for cells & modules
🔹 Start with 1.2 GW integrated, roadmap to 10 GW then 20 GW
🔹 Eyes US export - US cell capacity to hit 25 GW by 2028 but ingot/wafer only 6 GW, gap for non-China wafers
🔹 High-purity mono wafers to support 25.5% cell efficiency, help US navigate China curbs & IRA benefits
#Solar #MakeinIndia
🔗 BusinessLine
🔹 ₹3,000 cr facility - country's only operational ingot plant; ingots sliced to wafers for cells & modules
🔹 Start with 1.2 GW integrated, roadmap to 10 GW then 20 GW
🔹 Eyes US export - US cell capacity to hit 25 GW by 2028 but ingot/wafer only 6 GW, gap for non-China wafers
🔹 High-purity mono wafers to support 25.5% cell efficiency, help US navigate China curbs & IRA benefits
#Solar #MakeinIndia
🔗 BusinessLine
👍29👏10❤1😁1
Bihar unveiled a ₹1.38 lakh crore five-year energy plan for 24 GW renewables and 6 GWh storage by 2030. Peak demand is 9,500 MW versus 550 MW own generation; 2030 peak is projected at 11,747 MW. BSPHCL allocated ₹82,679 crore to generating assets and ₹24,683 crore to a 680-ckm Green Energy Corridor. #Power #Solar
Source
Source
The Indian Express
Surrounded by energy crises, Bihar eyes Rs 1.38 lakh crore solar investment
The state collected over Rs 19,000 crore from electricity users in 2025–26, but spent between ₹25,000 crore and ₹35,000 crore annually to buy power from outside sources. It is also burdened with Rs 3,800 crore from offering 125 units of free power to 1.89…
👍36🔥1
Premier Energies has commissioned its new 7 GW solar cell manufacturing facility, making it India's largest by capacity. This takes Premier Energies' total cell manufacturing capacity to 10.6 GW, and India's total capacity to 36-37 GW. On track to reach 42 GW by the end of this year. #Solar
🔗 Economic Times
🔗 Economic Times
ETEnergyworld.com
Premier Energies commissions 7 GW solar cell plant, takes capacity to 10.6 GW
Premier Energies has inaugurated a state-of-the-art 7 GW solar cell manufacturing facility in Andhra Pradesh, significantly increasing its total capacity to 10.6 GW. This new plant utilizes AI and automation to meet the rising demand for high-efficiency solar…
⚡28❤4
Advait Battery Arm has signed a 1 GWh LFP cell supply deal with china's Hithium to secure a steady one-year component pipeline for its upcoming 2.5 GWh battery storage (BESS) assembly plant in Gangad, Gujarat. #Batteries #Solar
Source
Source
Equitypandit
Advait Energy Arm Signs 1 GWh Battery Cell Deal with Hithium
Advait Battery Ecosystem has signed a 1 GWh LFP cell supply deal with China's Hithium for its upcoming Gujarat BESS facility.
👍23
Indian Development News 🇮🇳
Surat-based Navitas Solar has entered Zambia with its first utility-scale EPC project — a ₹200 crore, 54 MW captive solar plant in Serenje Province for a mining company via its arm Navitas Planet. The move marks the company’s shift from supplying modules to…
Surat based Navitas Solar is launching a ₹10,000-crore expansion across Gujarat and Maharashtra to build an integrated solar ecosystem covering ingot, wafer, cell, and module manufacturing alongside energy storage and solar parks.
The company has already commissioned a 2.5-GW module facility in Surat, is investing in a 2.4-GW cell plant slated for July 2027, and targets over ₹2,000 crore in revenue this year. #Solar #MakeinIndia
The company has already commissioned a 2.5-GW module facility in Surat, is investing in a 2.4-GW cell plant slated for July 2027, and targets over ₹2,000 crore in revenue this year. #Solar #MakeinIndia
🔥31❤8👍2🤣1
Fujiyama Power Systems will set up a 1.2 GW TOPCon solar-cell plant in Ratlam, MP, at ₹350–400 crore. Production is slated by end-FY27, taking total cell capacity to 2.3 GW from 1.1 GW at Dadri. The firm already runs 3.6 GW of module capacity; FY26 revenue was ₹2,654 crore. #Solar
Source
Source
Business-Standard
Fujiyama Power to set up 1.2 GW solar plant in MP to strengthen value chain
The greenfield project is expected to start solar cell production using advanced TopCon technology by the end of the ongoing fiscal year
👍23❤6
Renaissance Solar proposes ₹5,000 crore 5 GW solar ingot and wafer plant in Karnataka. The 100-acre Tumakuru facility targets operations by mid-2028. The plant will manufacture ingots and wafers for solar cells and panels. #Solar
❤28👍6😁2
Media is too big
VIEW IN TELEGRAM
☀️ Tata Power has partnered with Norway's Ocean Sun to launch a 300 kWp floating solar pilot at the Mulshi reservoir in Maharashtra, replacing conventional heavy pontoons with an innovative hydro-elastic membrane that floats directly on water to simplify installation and boost energy efficiency through natural cooling. #Solar
Economic Times
Economic Times
👍37🔥1
🚀 🇮🇳 Kredence is investing ₹100 Crore to establish India’s largest 40,000 MTPA ultra-pure Hydrogen Peroxide facility in Vadodara, Gujarat.
🏭🔬 This specialized plant will purify wet chemicals down to a strict 0.1 ppb level, reducing import reliance for critical wafer cleaning in India's #semiconductor fabs and #solar cell manufacturing lines. 🧪☀️ #MakeinIndia
Source
🏭🔬 This specialized plant will purify wet chemicals down to a strict 0.1 ppb level, reducing import reliance for critical wafer cleaning in India's #semiconductor fabs and #solar cell manufacturing lines. 🧪☀️ #MakeinIndia
Source
Saur Energy
Kredence Materials Gears Up For India’s Solar Cell Expansion With Capacity Expansion
Vadodara-based Kredence Electronics Materials is expanding its high-purity chemical manufacturing capabilities with a new hydrogen peroxide purification facility.
👍22⚡3
Indian Development News 🇮🇳
Vikram Solar has inaugurated a 6 GW solar module manufacturing facility at Gangaikondan, Tirunelveli, Tamil Nadu. The plant will produce high-efficiency n-type TOPCon modules and also plans to add cell, wafer, and ingot capacity to become a fully integrated…
🚀 Vikram Solar will roll out its first solar cells in December 2026 from a massive 9 GW N-type TOPCon plant in Tirunelveli, Tamil Nadu! 🇮🇳🔋
🏢 Developed by VSL Green Power at a 200-acre SIPCOT campus, the project is expandable to 12 GW and will create 2,000+ local #jobs. 💼✨
🌱 This phase follows their 6 GW module plant, with a final 9 GW ingot & wafer facility coming by FY29 to power fully "Made-in-India" #solar #energy. ☀️🛡️
🔗 Economic Times
🏢 Developed by VSL Green Power at a 200-acre SIPCOT campus, the project is expandable to 12 GW and will create 2,000+ local #jobs. 💼✨
🌱 This phase follows their 6 GW module plant, with a final 9 GW ingot & wafer facility coming by FY29 to power fully "Made-in-India" #solar #energy. ☀️🛡️
🔗 Economic Times
The Economic Times
Vikram Solar to roll out first cells from 9 GW Tamil Nadu facility in December 2026
Vikram Solars 9 GW N-type TOPCon solar cell manufacturing facility in Gangaikondan, Tamil Nadu, is on track to begin production in December 2026. The plant will be commissioned in phases, reduce the companys dependence on imported cells and advance its integration…
❤29👍5
Growel (India) and RENA Technologies (Germany) have signed a MoU to form a JV in India to manufacture wet chemical process equipment for the solar PV industry.
Wet chemical processing equipment is used to etch silicon wafers, a critical step for manufacturing high efficiency #solar cells. The same process also has applications in the #semiconductor industry. #MakeinIndia
🔗 Read more
Wet chemical processing equipment is used to etch silicon wafers, a critical step for manufacturing high efficiency #solar cells. The same process also has applications in the #semiconductor industry. #MakeinIndia
🔗 Read more
Power Peak Digest
Growel and RENA Technologies plan solar equipment JV in India | Power Peak Digest
Growel and RENA Technologies sign an MoU to form an Indian JV for solar PV wet chemical process equipment, targeting operations in early 2027.
👍25❤1
Jakson Group is investing ₹6,863 crore in an integrated #solar plant in Kurnool, Andhra Pradesh.
It will produce 10 GW of silicon ingots/wafers and 5 GW of cells across three phases, creating ~2,000 #jobs.
Phase 1 (3 GW ingots/wafers, 3 GW cells) targets commercial production in May 2028; remaining capacity by 2030.
It will produce 10 GW of silicon ingots/wafers and 5 GW of cells across three phases, creating ~2,000 #jobs.
Phase 1 (3 GW ingots/wafers, 3 GW cells) targets commercial production in May 2028; remaining capacity by 2030.
👍20❤3
☀️ Microtek invests Rs400 cr to accelerate solar growth
🏭 New solar panel plant in Jaipur, operational Nov 2026
🔋 Launching BESS and lithium storage
🔌 Portfolio: power generation, distribution, conditioning, storage (inverters, UPS, batteries, wires, solar panels) #Solar #Batteries
🔗 read more
🏭 New solar panel plant in Jaipur, operational Nov 2026
🔋 Launching BESS and lithium storage
🔌 Portfolio: power generation, distribution, conditioning, storage (inverters, UPS, batteries, wires, solar panels) #Solar #Batteries
🔗 read more
The Economic Times
Microtek invests over Rs 400 cr to accelerate solar business growth
Microtek has announced a significant investment over Rs 400 crore for its solar business expansion in Jaipur. The new solar panel manufacturing plant is expected to become operational by November 2026 and will support the company's energy vision. The company…
❤15👍4