Posterity has been inclined to place the blame for the fire at the feet of the Spanish soldiers at Koldinghus, and it is entirely probable that they, unused to the Nordic winter, fired up all too zealously in the castle's fireplace. The real cause, however, was sooner the fact that the maintenance of the chimneys had been neglected – but whatever the case may be, Jutland's last royal castle, which in 1808 still stood in the Baroque form it had attained through Frederik IV's rebuilding in the years around 1720, had been lost. At the time, however, people were most occupied by the fact that the fire had ruined large amounts of grain. In all it was estimated at 6,000 barrels of rye and oats, which people then made a great effort to salvage in the hope that it could be used as cattle feed?
Koldinghus was not rebuild as a royal castle, and very quickly became one of the romantic ruins which the age loved. In 1813 Christian Molbech passed by, and he writes: “Nature, which so likes to beautify death and destruction, had already here and there adorned the red lots with lively grass growth. The castle bailiff's cow wandered calmly in and out of the windows in search of food on the grass-covered gravel slopes between the walls where courtiers lived in days of old, and in the great, vaulted kitchen where the court was cooked for, a lonely pig had made his spacious dwelling”.
#restoration , #renovation , #conservation , #castle , #fire , #recostruction
#lighting , #interior , #refurbishment , #culture , #revitalization
@revitalization
Koldinghus was not rebuild as a royal castle, and very quickly became one of the romantic ruins which the age loved. In 1813 Christian Molbech passed by, and he writes: “Nature, which so likes to beautify death and destruction, had already here and there adorned the red lots with lively grass growth. The castle bailiff's cow wandered calmly in and out of the windows in search of food on the grass-covered gravel slopes between the walls where courtiers lived in days of old, and in the great, vaulted kitchen where the court was cooked for, a lonely pig had made his spacious dwelling”.
#restoration , #renovation , #conservation , #castle , #fire , #recostruction
#lighting , #interior , #refurbishment , #culture , #revitalization
@revitalization
TOWER
15 Observation deck at the top of the Giant Tower
12-14 Tower Rooms, closed at the moment
11 Toys
3rd FLOOR
7 The Ruin Hall
8 Classroom, teaching
9 Temporary Exhibitions
10 The Great Hall
16 Danish Silver 1550-1900
17 Collection of the Erik Fjeldsøe Foundation (Danish Silver 1550-1800)
18 GANGSTEDFONDENS Silver Collection
19 Danish Silver Skønvirke (Thorvald Bindesbøll etc.)
20 Goldsmith Holger Kysters livingroom (early 20th century)
21 Danish Silver 20th Century
2nd FLOOR
6 The Ruin Hall
24 Historicisme (ca. 1830-90)
25 Rococo (approx. 1730-70); Louis Seize (approx. 1760-1800); Empire (approx. 1800-50)
26 Renaissance (approx. 1550-1630)
27 Baroque (approx. 1630-1740)
28 Neoclassicism (1770-1800)
29 The Library Reading Room, porcelain and delft ware
1st FLOOR
1 Tickets, Museum Shop, Wardrobe
4 The Ruin hall
5 King Christian 3.s Chapel (auditorium)
30 The Castle Chapel
31 Church Art, Middle Ages
32-33 Koldinghus History Center
34 Temporary Exhibitions
BASEMENT
2 Basement, toilets
3 The Ruin Hall
35 Café Koldinghus
36 Dungeon
#restoration , #renovation , #conservation , #castle , #fire , #recostruction
#lighting , #interior , #refurbishment , #culture , #revitalization
@revitalization
15 Observation deck at the top of the Giant Tower
12-14 Tower Rooms, closed at the moment
11 Toys
3rd FLOOR
7 The Ruin Hall
8 Classroom, teaching
9 Temporary Exhibitions
10 The Great Hall
16 Danish Silver 1550-1900
17 Collection of the Erik Fjeldsøe Foundation (Danish Silver 1550-1800)
18 GANGSTEDFONDENS Silver Collection
19 Danish Silver Skønvirke (Thorvald Bindesbøll etc.)
20 Goldsmith Holger Kysters livingroom (early 20th century)
21 Danish Silver 20th Century
2nd FLOOR
6 The Ruin Hall
24 Historicisme (ca. 1830-90)
25 Rococo (approx. 1730-70); Louis Seize (approx. 1760-1800); Empire (approx. 1800-50)
26 Renaissance (approx. 1550-1630)
27 Baroque (approx. 1630-1740)
28 Neoclassicism (1770-1800)
29 The Library Reading Room, porcelain and delft ware
1st FLOOR
1 Tickets, Museum Shop, Wardrobe
4 The Ruin hall
5 King Christian 3.s Chapel (auditorium)
30 The Castle Chapel
31 Church Art, Middle Ages
32-33 Koldinghus History Center
34 Temporary Exhibitions
BASEMENT
2 Basement, toilets
3 The Ruin Hall
35 Café Koldinghus
36 Dungeon
#restoration , #renovation , #conservation , #castle , #fire , #recostruction
#lighting , #interior , #refurbishment , #culture , #revitalization
@revitalization
Modern render and plaster coverings have been successfully removed from the stonework, with original granite flagstones carefully lifted and re-laid within the new ground floor exhibition space. Brick gable walls at high level have also been reinstated, based on historic records. The careful repair of historic fabric, combined with new, modern insertions, creates a new life to these characterful buildings while providing a valuable resource for the local community that can be accessed and enjoyed by visitors from Cornwall and beyond.
#UK , #interior_design , #library , #public_space , #lighting , #cultural_center , #archive , #fire , #incendie
@revitalization
#UK , #interior_design , #library , #public_space , #lighting , #cultural_center , #archive , #fire , #incendie
@revitalization
NO.151
Hastings Pier / dRMM
PUBLIC SPACE, PIER, REFURBISHMENT
•
HASTINGS, UNITED KINGDOM
• Architects: dRMM
• Area: 11720 m²
• Year: 2016
• Manufacturers: Roles Broderick Roofing
• Client: Hastings Pier Charity
• Cost Consultant: PT Projects
• Structural Engineer: Ramboll
• Service Engineer: Ramboll
• Cdm Coordinator: KMCS
• Joinery Company: Timber Craft UK
• Structural Clt Supplier: KLH
• Furniture: dRMM and Hastings & Bexhill Wood Recycling
Hastings Pier is a public pleasure pier in Hastings, East Sussex, England. Built in 1872 and enjoying its prime in the 1930s, it became a popular music venue in the 1960s. The structure suffered major storm damage in 1990, and was closed to the public for a time before closing completely in 2008, and 95% destroyed by a fire in 2010.
Hastings Pier Charity oversaw a rebuilding project, with the pier reopening on 27 April 2016. The redeveloped pier won the 2017 Stirling Prize for architecture
Text description provided by the architects. The 2010 destruction of Hastings Pier by fire was an oppor-tunity to redefine what a pier could be in the 21st century; transforming the shanty town of commer-cialism it was in the 20th century.
After local stakeholder consultation it was clear the Pier would be expected to host many different populist scenarios. dRMM’s re-design master-move was to create a strong, well-serviced platform that could support endless uses; from big-top circus to major music events, local fishing to international markets. In homage to conceptualist Cedric Price, users bring their own architecture to plug in and play.
This is the first phase of regeneration. Most of the work so far has been up to and including deck level. The HLF grant enabled extensive foundation and structural repairs covering fire, sea and storm dam-age (£9M). Further funding (£2.5M) facilitated two buildings, the first of which, the remaining derelict Victorian Pavilion, was transformed into an open-plan, fully-glazed restaurant. dRMM were responsi-ble for the exterior shell and cores; the interior fit-out was by tenant.
The new Visitor Centre is a cross-laminated timber structure, inventively clad in reclaimed decking. Replacing the weakest central section of the damaged pier, it offers adaptable space for events, exhi-bitions and education, with an elevated rooftop belvedere. Reclaimed timber deck furniture was de-signed by dRMM and Hastings & Bexhill Wood Recycling as part of a local employment initiative.
The pier is an extension of the promenade from which it projects; a large public open space. The expe-rience of free space and ‘walking on water’ is heightened by the optics of a louvred balustrade design and quality timber deck. The new pier is a catalyst for urban regeneration. It offers flexibility, material and functional sustainability, and an uninterrupted vista of the natural and built surroundings of the special seaside town of Hastings.
#UK , #pier , #fire , #visitor_centre , #event , #exhibition , #light ,#regeneration, #restaurant, #promenade , #open_air, #public_space , #landmark , #prize
@revitalization
Hastings Pier / dRMM
PUBLIC SPACE, PIER, REFURBISHMENT
•
HASTINGS, UNITED KINGDOM
• Architects: dRMM
• Area: 11720 m²
• Year: 2016
• Manufacturers: Roles Broderick Roofing
• Client: Hastings Pier Charity
• Cost Consultant: PT Projects
• Structural Engineer: Ramboll
• Service Engineer: Ramboll
• Cdm Coordinator: KMCS
• Joinery Company: Timber Craft UK
• Structural Clt Supplier: KLH
• Furniture: dRMM and Hastings & Bexhill Wood Recycling
Hastings Pier is a public pleasure pier in Hastings, East Sussex, England. Built in 1872 and enjoying its prime in the 1930s, it became a popular music venue in the 1960s. The structure suffered major storm damage in 1990, and was closed to the public for a time before closing completely in 2008, and 95% destroyed by a fire in 2010.
Hastings Pier Charity oversaw a rebuilding project, with the pier reopening on 27 April 2016. The redeveloped pier won the 2017 Stirling Prize for architecture
Text description provided by the architects. The 2010 destruction of Hastings Pier by fire was an oppor-tunity to redefine what a pier could be in the 21st century; transforming the shanty town of commer-cialism it was in the 20th century.
After local stakeholder consultation it was clear the Pier would be expected to host many different populist scenarios. dRMM’s re-design master-move was to create a strong, well-serviced platform that could support endless uses; from big-top circus to major music events, local fishing to international markets. In homage to conceptualist Cedric Price, users bring their own architecture to plug in and play.
This is the first phase of regeneration. Most of the work so far has been up to and including deck level. The HLF grant enabled extensive foundation and structural repairs covering fire, sea and storm dam-age (£9M). Further funding (£2.5M) facilitated two buildings, the first of which, the remaining derelict Victorian Pavilion, was transformed into an open-plan, fully-glazed restaurant. dRMM were responsi-ble for the exterior shell and cores; the interior fit-out was by tenant.
The new Visitor Centre is a cross-laminated timber structure, inventively clad in reclaimed decking. Replacing the weakest central section of the damaged pier, it offers adaptable space for events, exhi-bitions and education, with an elevated rooftop belvedere. Reclaimed timber deck furniture was de-signed by dRMM and Hastings & Bexhill Wood Recycling as part of a local employment initiative.
The pier is an extension of the promenade from which it projects; a large public open space. The expe-rience of free space and ‘walking on water’ is heightened by the optics of a louvred balustrade design and quality timber deck. The new pier is a catalyst for urban regeneration. It offers flexibility, material and functional sustainability, and an uninterrupted vista of the natural and built surroundings of the special seaside town of Hastings.
#UK , #pier , #fire , #visitor_centre , #event , #exhibition , #light ,#regeneration, #restaurant, #promenade , #open_air, #public_space , #landmark , #prize
@revitalization
-------
A special challenge with the task has been that ancient monuments have been found on the building site that give a story about Denmark's history through a thousand years. Most visible is a protected brick ruin of the canons' monastery from the 12th century, which is integrated into an exhibition space to convey the site's many cultural-historical layers.
The building consists of a single, elongated volume with a saddle roof that stands on pillars above the protected archaeological finds. The length of the building is along the square with a scale and roof slope that follows the neighboring buildings on the square. The archetypal building form has a sculptural skew to the south, to create more light and air towards the neighboring buildings in the courtyard.
To the south is an intimate courtyard, bounded by a wall that frames the street spaces along Sønderportsgade and Rykind.
The upper part of the building is clad with specially developed brick shells in reddish-brown hues, related to the town and the area's typical, brick houses, but by virtue of the larger format of the shells in a contemporary interpretation. The lower part has glass facades, which protect the ruin and at the same time expose the unique finds.
#Denmark, #cathedrale, #square, #fire , #ruin , #public_space , #office , #lighting
@revitalization
A special challenge with the task has been that ancient monuments have been found on the building site that give a story about Denmark's history through a thousand years. Most visible is a protected brick ruin of the canons' monastery from the 12th century, which is integrated into an exhibition space to convey the site's many cultural-historical layers.
The building consists of a single, elongated volume with a saddle roof that stands on pillars above the protected archaeological finds. The length of the building is along the square with a scale and roof slope that follows the neighboring buildings on the square. The archetypal building form has a sculptural skew to the south, to create more light and air towards the neighboring buildings in the courtyard.
To the south is an intimate courtyard, bounded by a wall that frames the street spaces along Sønderportsgade and Rykind.
The upper part of the building is clad with specially developed brick shells in reddish-brown hues, related to the town and the area's typical, brick houses, but by virtue of the larger format of the shells in a contemporary interpretation. The lower part has glass facades, which protect the ruin and at the same time expose the unique finds.
#Denmark, #cathedrale, #square, #fire , #ruin , #public_space , #office , #lighting
@revitalization
NO.176
Battersea Arts Centre / Haworth Tompkins
VISUAL ARTS CENTER, ADAPTIVE REUSE
•
LONDON, UNITED KINGDOM
• Architects: Haworth Tompkins
• Area: 3800 m²
• Year: 2018
• Manufacturers: Domus Tiles, Hakwood, Triple E, Yannedis, Modular Clay Products
• Lead Architects: Steve Tompkins, Martin Lydon, Imogen Long
• Contractor: 8Build, Gilbert-Ash
• Acoustic Engineer: Gillieron Scott Acoustic Design, SoundSpace Design
• Structural Engineers: Price & Myers, Heyne Tillett Steel
• Services Engineers: Skelly & Couch, XCO2
• Theatre Consultant:Charcoalblue, Theatreplan
• Quantity Surveyor:Bristow Johnson
• Signage:Jake Tilson
• Light Fittings:Haworth Tompkins, Rob McIntyre
the rebirth of a town hall for community and theatre use
Battersea Town Hall is a handsome, beautifully made civic building in south west London, designed by E. W. Mountford in 1893 and Grade II* listed both for its architectural significance and for its important po-litical role in the birth of the suffragette and labour movements in the early twentieth century. Since 1974 it has been home to the arts centre that is regarded as one of the most important incubators of new perfor-mance work in the UK.
Haworth Tompkins have been working alongside the Battersea Arts Centre team, the local community and theatre artists for over a decade on a series of ongoing, experimental, phased projects that are gradually transforming the entire building into a powerhouse of creative commu-nal activity and an explicit record of the buildings vivid history.
Drawing on the existing richness of the building and patterns of use by artists, a number of improvised, non-invasive alterations were made alongside specific productions - such as Punchdrunk’s Masque of the Red Death - to test strategies for change and to evolve a playful but rig-orous architectural language.
Following a period of experimentation, a brief for more permanent work was developed. These projects include the creation of a new pub-lic outdoor courtyard performance space by selectively stripping back and patching in a disused light well, and the conversion of unused attics and rooftops for the organisation’s offices and garden.
Cumulatively, these interventions have resulted in the reconfiguration of the entire interior to allow the possibility of multiple, interconnected performance, heritage and community uses, equipping the organisation for the next phase of its life.
In the context of this narrative approach, the rebuilding of the build-ing’s Grand Hall after the shocking fire that partially destroyed it in 2015 was able to be assimilated into the project as another, albeit highly significant, moment of evolution and change.
Haworth Tompkins took the former decorative plaster vault as a starting point for a new, timber grid ceiling, allowing far greater theatrical pos-sibility and a much clearer acoustic. The surface of the walls of the hall and its surrounding corridors have been preserved in their extraordi-nary, almost Pompeiian post-fire richness and complexity.
A creative relationship of this duration allows both ‘client’ and ‘archi-tect’ to evaluate the ways in which the collaboration has informed their respective wider practices. As the project has unfolded over the last 12 years, so BACs mission has evolved from a purely theatrical undertak-ing to become a far more wide ranging social project with access and inclusivity at its core.
Equally, as architects our theatre work has increasingly been directed towards establishing a ‘cultural commons’ in which buildings for thea-tre can be seen less as individual entities, competing for a market share of an established theatre audience, and more as a diverse, conglomerate civic space that is available - and meaningful - to the whole community.
.
#UK, #hall, #gallery, #cultural_center, #interior_design, #lighting, #fire
@revitalization
Battersea Arts Centre / Haworth Tompkins
VISUAL ARTS CENTER, ADAPTIVE REUSE
•
LONDON, UNITED KINGDOM
• Architects: Haworth Tompkins
• Area: 3800 m²
• Year: 2018
• Manufacturers: Domus Tiles, Hakwood, Triple E, Yannedis, Modular Clay Products
• Lead Architects: Steve Tompkins, Martin Lydon, Imogen Long
• Contractor: 8Build, Gilbert-Ash
• Acoustic Engineer: Gillieron Scott Acoustic Design, SoundSpace Design
• Structural Engineers: Price & Myers, Heyne Tillett Steel
• Services Engineers: Skelly & Couch, XCO2
• Theatre Consultant:Charcoalblue, Theatreplan
• Quantity Surveyor:Bristow Johnson
• Signage:Jake Tilson
• Light Fittings:Haworth Tompkins, Rob McIntyre
the rebirth of a town hall for community and theatre use
Battersea Town Hall is a handsome, beautifully made civic building in south west London, designed by E. W. Mountford in 1893 and Grade II* listed both for its architectural significance and for its important po-litical role in the birth of the suffragette and labour movements in the early twentieth century. Since 1974 it has been home to the arts centre that is regarded as one of the most important incubators of new perfor-mance work in the UK.
Haworth Tompkins have been working alongside the Battersea Arts Centre team, the local community and theatre artists for over a decade on a series of ongoing, experimental, phased projects that are gradually transforming the entire building into a powerhouse of creative commu-nal activity and an explicit record of the buildings vivid history.
Drawing on the existing richness of the building and patterns of use by artists, a number of improvised, non-invasive alterations were made alongside specific productions - such as Punchdrunk’s Masque of the Red Death - to test strategies for change and to evolve a playful but rig-orous architectural language.
Following a period of experimentation, a brief for more permanent work was developed. These projects include the creation of a new pub-lic outdoor courtyard performance space by selectively stripping back and patching in a disused light well, and the conversion of unused attics and rooftops for the organisation’s offices and garden.
Cumulatively, these interventions have resulted in the reconfiguration of the entire interior to allow the possibility of multiple, interconnected performance, heritage and community uses, equipping the organisation for the next phase of its life.
In the context of this narrative approach, the rebuilding of the build-ing’s Grand Hall after the shocking fire that partially destroyed it in 2015 was able to be assimilated into the project as another, albeit highly significant, moment of evolution and change.
Haworth Tompkins took the former decorative plaster vault as a starting point for a new, timber grid ceiling, allowing far greater theatrical pos-sibility and a much clearer acoustic. The surface of the walls of the hall and its surrounding corridors have been preserved in their extraordi-nary, almost Pompeiian post-fire richness and complexity.
A creative relationship of this duration allows both ‘client’ and ‘archi-tect’ to evaluate the ways in which the collaboration has informed their respective wider practices. As the project has unfolded over the last 12 years, so BACs mission has evolved from a purely theatrical undertak-ing to become a far more wide ranging social project with access and inclusivity at its core.
Equally, as architects our theatre work has increasingly been directed towards establishing a ‘cultural commons’ in which buildings for thea-tre can be seen less as individual entities, competing for a market share of an established theatre audience, and more as a diverse, conglomerate civic space that is available - and meaningful - to the whole community.
.
#UK, #hall, #gallery, #cultural_center, #interior_design, #lighting, #fire
@revitalization