Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
21.8K subscribers
17.9K photos
2.36K videos
43 files
16.8K links
Subscribe for fastest updates on Economy, Infrastructure,Geopolitics,Defence,Sports and Govt. policies of India.
Download Telegram
Notam: ISRO has filed NOTAM A2635/26 for the GSLV-F17 GISAT-1A launch from Sriharikota between September 4 โ€“ 26, 2026. #Space #ISRO
๐Ÿ™52โค5๐Ÿ‘ป1
Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
Notam: ISRO has filed NOTAM A2635/26 for the GSLV-F17 GISAT-1A launch from Sriharikota between September 4 โ€“ 26, 2026. #Space #ISRO
GSLV-F17/EOS-05 (GISAT-1A) Mission is scheduled for launch on 04 Sept 2026 at 02:55 AM IST from Satish Dhawan Space Centre, SHAR, Sriharikota.

#Space #ISRO
โคโ€๐Ÿ”ฅ48โค13๐Ÿ™3๐Ÿ˜1
Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
Photo
๐Ÿ‡ฎ๐Ÿ‡ณ Mission Successfully Accomplished! #ISRO
โค86๐Ÿ”ฅ16๐Ÿ‘7๐ŸŽ‰6๐Ÿ˜1
Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
In a setback, the Indian Space Research Organisationโ€™s (Isro) mission to put the state-of-the art Geo Imaging Satellite (Gisat-1) failed early on Thursday morning. The Gisat-1 is officially named EOS-03 (earth observation satellite 03). This was the spaceโ€ฆ
A reminder how important GISAT-1A Satellite means to India's #NationalSecurity

Unlike conventional remote-sensing satellites operating in Low Earth Orbit (LEO) that pass over a specific area only once every few days, GISAT-1A is positioned in a Geostationary orbit above the Earth. This fixed vantage point enables high-frequency imaging over the same geographic expanse acting as a 'Eye in the Sky' for the country during Day Time Hours.

The satellite can capture full-disk images of the Indian Subcontinent every 30 minutes and focus on selected target areas every 5 minutes.

#Space #ISRO
โค51๐Ÿ‘5๐Ÿ”ฅ3๐Ÿ˜2
Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
A reminder how important GISAT-1A Satellite means to India's #NationalSecurity Unlike conventional remote-sensing satellites operating in Low Earth Orbit (LEO) that pass over a specific area only once every few days, GISAT-1A is positioned in a Geostationaryโ€ฆ
GISAT-2 will be a dedicated Satellite launched by ISRO for the Indian Navy to track the Indian Ocean Region (IOR) even during the Night with high Optical Sensors for Night Vision providing round the clock monitoring and surveillance of the region.

While there's no update about the launch of GISAT-2 yet. It will be a Advance version of GISAT-1A (which is a replacement Satellite of GISAT-1/EOS-3) which is dedicated for dual use Satellite ๐Ÿ›ฐ๏ธ to look over the Indian Subcontinent Landmass during Daytime. #Space #ISRO
โค48๐Ÿ˜3
Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
๐Ÿ‡ฎ๐Ÿ‡ณ Mission Successfully Accomplished! #ISRO
Post-launch Press conference

https://www.youtube.com/watch?v=nmfzCDfZhd0

Expected orbit was 170x29000 km and achieved orbit with slight apogee gain was at 171x 31026 km

NVS-03 launch is next. Six more launches are planned in this financial year. Gaganyaan-G1 targeted in this calendar year.

Current vehicle (GSLV) capacity is 2250 kg to GTO. Not expected to improve further.

On TLP status: Completed design phase, realization phase to begin soon

EOS-05 expected mission life is 7 years confident it will perform for 9 years.

By 9 September orbit raising phase of EOS-05 will be done. After that the on-orbit checking will take a month. In two months it'll be fully operational.

On concerns related to SLC operations and management being handed over to pvt. sector

Concerns are genuine but we there to handhold them to make that program successful.
โคโ€๐Ÿ”ฅ32โค3๐Ÿ˜3๐Ÿ‘2
ISRO successfully hot tested the Semicryogenic Engine PHTA at full 200T thrust for the first time at IPRC Mahendragiri. 35s test, 5s at 100%. Ninth PHTA test. SE2000 will power the SC120 stage replacing L110 on LVM3. #ISRO
โค74โšก8๐Ÿ˜2
Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
๐Ÿ‡ฎ๐Ÿ‡ณ Mission Successfully Accomplished! #ISRO
GISAT-1A First Orbit-raising operation was successfully completed by firing the Liquid Apogee Motor for 5,406 seconds.

The satelliteโ€™s orbit was raised from 171 km ร— 31,121 km to 20,000 km ร— 31,129 km.

#ISRO #Space
โค50๐Ÿ‘10
Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
GISAT-1A First Orbit-raising operation was successfully completed by firing the Liquid Apogee Motor for 5,406 seconds. The satelliteโ€™s orbit was raised from 171 km ร— 31,121 km to 20,000 km ร— 31,129 km. #ISRO #Space
#UPDATE: The second operation to raise the apogee of EOS-05 was completed successfully at 7:00 pm on September 06, 2026. The LAM engine fired for 338.9 seconds and the estimated apogee after manouever is 35786 km. The satellite health is normal. #ISRO #Space
โค40๐Ÿ‘8
ISRO has clarified that media reports regarding its privatisation or diminished role are entirely baseless, affirming it remains India's principal agency for core scientific research and strategic space missions. Rather than privatising, space sector reforms aim to transfer mature production and launch operations to private industry to expand overall capacity.

Offloading routine capabilities enables ISRO to redirect its expertise toward frontier technologies, planetary exploration, the Bharatiya Antariksh Station by 2035, and crewed lunar missions under Space Vision 2047. #ISRO #Space

Official Tweet
โค35๐Ÿ‘5๐Ÿ”ฅ5๐Ÿ‘Ž1๐Ÿ‘ป1
Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
#UPDATE: The second operation to raise the apogee of EOS-05 was completed successfully at 7:00 pm on September 06, 2026. The LAM engine fired for 338.9 seconds and the estimated apogee after manouever is 35786 km. The satellite health is normal. #ISRO #Space
Third and final orbit manoeuvring of EOS-05 (GISAT-1A) spacecraft completed.

The third and final orbit raising manoeuvre to increase the perigee of EOS-05 completed successfully at 8:57 pm on September 07, 2026.

The LAM engine fired for 1247 seconds and the estimated orbit after manouever is 34903 km x 35884 km.

The satellite health is normal.

#ISRO #Space
๐Ÿ‘47โค12๐Ÿซก6
Flight acceptance hot test of CE20 cryogenic engine earmarked for the C32 upper stage of upcoming LVM3 mission at uprated thrust conditions of 220kN is successfully carried out at ISRO Propulsion Complex, Mahendragiri on September 09, 2026.

Performance of the LOX Tank Pressurization Module (LTPM) meant for the C32 stages for Gaganyaan missions was also successfully demonstrated in this test.

#ISRO #space
๐Ÿ‘38โค8๐Ÿ‘ป1
ISRO unveiled at BSX 2026 a new GNSS receiver for the Gaganyaan mission, designed to operate in both LEO and GEO orbits, integrating NavIC, GAGAN, GPS, and Sโ€‘AIS, which strengthens Indiaโ€™s navigation autonomy and reflects Indiaโ€™s push for indigenous navigation and communication systems in human spaceflight. #ISRO #Space

๐Ÿ”— Indian Space Flight
โค46๐Ÿ™3
#ISRO qualified and delivered its first indigenous Ku-band 210W traveling wave tubeโ€”built with over 250 precision components and 100 vacuum jointsโ€”for the upcoming TDS-01 satellite mission. #AatmarnirbharBharat

๐Ÿ”— More Details
โค44๐Ÿ‘7๐Ÿ‘ป1
#ISRO lays foundation stone of its Advanced Radar Research Centre at Chandrapur, Assam ๐Ÿ‡ฎ๐Ÿ‡ณ

Under Project NETRA, ISRO is building:

๐Ÿ“กAn indigenous phased array radar
๐ŸŽฏAble to detect objects as small as 10 cm
๐ŸŒWith a tracking range of up to 2,000 km
๐Ÿ—๏ธOn 124 acres at the old Chandrapur thermal power plant site
๐ŸŽ“With internships and training for Northeast students

Why does Space Situational Awareness matter?
Earth's orbit is getting crowded with satellites and debris. Even a 10 cm fragment can destroy a satellite. ISRO carried out 19 collision avoidance manoeuvres in 2021, up from just 3 in 2015.

Until now, India has relied on NORAD and other foreign sources for debris data. NETRA will give India its own eyes in the sky to protect its growing fleet of satellites.
A first-of-its-kind ISRO facility for the Northeast.

#Space
๐Ÿ‘41โคโ€๐Ÿ”ฅ9โค8๐Ÿค2๐Ÿ”ฅ1
๐—œ๐—ฆ๐—ฅ๐—ข ๐˜€๐—ฒ๐˜ ๐˜๐—ผ ๐—น๐—ฎ๐˜‚๐—ป๐—ฐ๐—ต ๐—ก๐—ฉ๐—ฆ-๐Ÿฌ๐Ÿฏ (๐—ก๐—ฎ๐˜ƒ๐—œ๐—–) ๐—ถ๐—ป ๐—ข๐—ฐ๐˜ ๐Ÿญ๐Ÿฑ-๐Ÿฎ๐Ÿฌ, ๐—š๐—ฆ๐—Ÿ๐—ฉ-๐—™๐Ÿญ๐Ÿด ๐—ถ๐—ป๐˜๐—ฒ๐—ด๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐˜‚๐—ป๐—ฑ๐—ฒ๐—ฟ๐˜„๐—ฎ๐˜†!

So far, the first stage of the GSLV-F18 vehicle has been stacked, with its launch expected to take place between October 15-20, 2026.

The mission is critical for NavIC. Right now only three satellites in the constellation are providing Position, Navigation and Timing (PNT) services: IRNSS-1B and IRNSS-1I from the first generation, and NVS-01 from the second generation. Any satellite navigation system needs a bare minimum of four satellites to calculate a user's position on its own, which means NavIC currently cannot provide standalone navigation.


๐Ÿ”—Source

#ISRO #space
โค36๐Ÿ™15๐Ÿ”ฅ1
This media is not supported in your browser
VIEW IN TELEGRAM
#ISRO has successfully completed a series of Crew Module -Service Module Separation Tests for the Gaganyaan missions. Electrical & fluid servicing between CM & SM is ensured through umbilical connections. #Space
โค48๐Ÿ‘10โคโ€๐Ÿ”ฅ1๐Ÿ˜1
Indian Development News ๐Ÿ‡ฎ๐Ÿ‡ณ
The Third LaunchPad (TLP) is designed to have configuration that is as universal and adaptable that can support not only NGLV but also the LVM3 vehicles with Semicryogenic stage as well as scaled up configurations of NGLV #ISRO
๐Ÿš€ #ISRO LEAPS TO RAPTOR-CLASS TECH FOR 2040 MOON MISSION!

๐Ÿ‡ฎ๐Ÿ‡ณ ISRO has unveiled its LOX-Methane engine roadmap for the Next Generation Launch Vehicle (NGLV). Advancing from the LM20-TD demonstrator, the agency is testing components for the LME1100 engine (70%+ 3D-printed) ahead of mid-2027 hot tests.

In a massive leap, ISRO quietly finalized the design for a 2400 kN Full-Flow Staged Combustion engineโ€”the elite, hyper-complex Raptor-class tech that even the US and China barely fly. This powerhouse will fuel India's heavy-lift rocket for the targeted 2040 crewed lunar landing! ๐ŸŒ•๐Ÿ”ฅ #Space

๐Ÿ”— ISRO Website
โคโ€๐Ÿ”ฅ63๐Ÿ‘8โค5๐Ÿ”ฅ2๐Ÿ˜1